Post DLP Rambasti
Post DLP Rambasti
Post DLP Rambasti
Note : The entries against each item blow should be made in accordance with the classification
pescribed in Appendix No.4CPWD Code
Name of Work:-- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
Estimate framed by Er. O. Tatak Executive Engineer Rural Works Division, Roing.
of the probable cost of Rs 100.992 Lakhs Rupees One crore ninety Nine Thousands
Two hundred only
Project REPORT
This Preliminary estimated amounting to Rs 1,00,99,200.00 (Rupees One crore ninety nine
thousands two hundred )only has been framed to obtain Administrative approval and Expenditure
sanction from the competent authority for Post DLP Renewal Maintenance of Road from Parbuk to
Rambasti. ( 3.54 km )
The PMGSY road from Parbuk to Rambasti . ( 3.54 km ) was Sanctioned during the year of 2008 -
2009 ( Ph ix).Accordingly road was executed and completed during the year of 2011 -12 . As design
life of the road ten years has been over. Now lots of pot holes has been seen in the road. As a result
traffics playing through the road are facing lot of inconvenient . Other hand Local MLA and publics are
demanding to do maintenance works immediatly for smooth traffics play.
The following special maintenance work has been kept in the estimate after actual survey and
investigation at site:
1 Part I - Initial Rehabilitation ( I R ) cost. Rs 3189501.00
2 Part II - Running Maintenance (RM) Rs 2000000.00
3 Part III - Renewal Rs 4909652.00
4 Part IV - Emergency work Nil
The Project has been prepared as per the Standard specifications and norms and demand of the
concern authority.
Hence the Estimate is framed
As per Standard specifications follows by RWD/PWD AP.
Specifications has been followed base on SP: 20 2004 of Rural
1. Specifications
road Manual. Existing road carriage width 3.00 m and Road way
width 6.00 m.
2. Rates As per APSR 2021 of PMGSY
3. Method :- Contract /departmently
4. Cost :- Rs. 100.992 Lakhs
5. Time :- 2024-25
6. GST :- 18 %
7. CESS :- 1 %
7. Contingency Nil
P- 2
Abstract of Cost - Original Estimate
(C.P.W.D. Code, Para 330-332)
State : AP Division: Roing
Branch :- RWD Sub-Division: Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
PKG. NO. AR/15/03/047
Amount with
Cess+GST
Item Sub - heads and Items of Quantity Rate Amount
Per (Rounded to Remarks
No. Work or No.
1000)
Rs. Rs. Rs.
(GENERAL ABSTRACT)
Initial Rehabilitation
1 3.540 Km 26,80,253.00 31,89,501.00
(Part-I)
Emergency/Special
4 NIL - -
Repair Works (Part-IV)
Sub-Total = 88,06,011.00 1,00,99,153.00 (A)
5 Add GSTIN on A @ 18% excl. PDLP Part-II (+) 12,25,082.00
6 Add Labour Cess on A @ 1% excl. PDLP Part-II (+) 68,060.00
Gross Total = 1,00,99,153.00 1,00,99,153.00
Say Gross Total Rs = 1,00,99,000.00
2
Standard Operating Procedure For
Rural Road Maintenance
Post Defect Liability Period Maintenance through eMARG
AT A GLANCE
Block : Roing Packae No
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
District : Lower Dibang Valley. PKG. NO. AR/15/03/047
Item no. items Details of measurement Qnty Unit
1 2 3 4 5
3
ABSTRACT OF COST - ORIGINAL ESTIMATE
(C.P.W.D. Code, Para 330-332)
State : AP Division: Roing
Branch :- RWD Sub Division: Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
PKG. NO. AR/15/03/047
Rate Amount
Slno Description of item Unit Quantity Remarks.
Rs. Rs.
1 2 3 4 5 6 7
1 Initial Rehabilitation (SOP-RRM-PDLP-Emarg_Clause-2.4)
SH-2: Other improvement works
1 Clearing and Grubbing Road Land . Clearing and
grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and
trees of girth upto 300 mm, removal of stumps of
such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to
be used or auctioned, upto a lead of 1000 m Hac 1.05 77,149.00 SoR' 2021
73,407.94
including removal and disposal of top organic soil
not exceeding 150 mm in thickness as per
Technical Specification Clause 201.
(I) By Manual Means
A. In area of non-thorny jungle
2 Maintenance of Earthen Shoulder (filling with
fresh soil) Making up loss of material/irregularities
on shoulders to the design level by adding fresh
Sqm 10509.60 59.91 6,29,630.00 SoR' 2021
approved selected soil and compacting it with
appropriate equipment at OMC upto a lead of 1000
m as per technical specification Clause 1903
Maintenance of WBM
10 Maintenance of WBM Road (Maintenance of
WBM road including filling up of pot holes, ruts
and rectifying corrugated surface, damaged edges
and ravelling as per technical specification clause Sqm 5592.00 256.84 14,36,249.00 SoR' 2021
1906).
ADDITIONAL HAULAGE
a Loading and Unloading of Cement by Manual Means
(i) Loading of Cement by manual means including a MT 3.23 169.51 548.00 SoR 2021
lead upto 30 m
(ii) Unloading of Cement by manual means including
MT 3.23 169.51 548.00 SoR 2021
a lead upto 30 m
b Loading and Unloading of Sand, Shingle, Aggregate & boulder: by manual means
(i) Loading of Lime, Aggregate, Stone Boulder, Brick
Aggregate, Kankar, Building Rubbish, Crushed
Cum 643.50 132.05 84,974.00 SoR 2021
Slag, Stone for Masonry Work by manual means
including a lead upto 30 m
(ii) Unloading of Lime, Aggregate, Stone Boulder,
Brick Aggregate, Kankar, Building Rubbish,
Cum 643.50 66.03 42,490.00 SoR 2021
Crushed Slag, Stone for Masonry Work by manual
means including a lead upto 30 m
4
Rate Amount
Slno Description of item Unit Quantity Remarks.
Rs. Rs.
1 2 3 4 5 6 7
c Haulage of materials by tipper excluding cost of loading, unloading and stacking. (Cement & Steel)
Case-I : Surfaced Road (42 Km) MT 3.23 6.85 664.00 SoR 2021
d Haulage of materials by tipper excl cost of loading, unloading (Sand, Shingle, Aggregate & boulder)
Case-I : Surfaced Road (30 Km) MT 1414.46 6.85 2,90,672.00 SoR 2021
Case-III: Katcha Track and Track in River
MT 1414.46 16.59 1,17,329.00 SoR 2021
Bed/Nallah Bed and Choe Bed (5 Km)
Grand Total Rs 26,80,253.00
5
Part-II Post DLP Routine maintenance SOP-RRM-PDLP-Emarg_Clause-2.5)
PKG. NO. AR/15/03/047
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
6
ABSTRACT OF COST - ORIGINAL ESTIMATE
(C.P.W.D. Code, Para 330-332)
State : AP Division: Roing
Branch :- RWD Sub Division: Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
PKG. NO. AR/15/03/047
Rate Amount
Slno Description of item Unit Quantity Remarks.
Rs. Rs.
1 2 3 4 5 6 7
Part-III Renewal (SOP-RRM-PDLP-Emarg_Clause-2.6)
SH: Periodical Renewal to existing bituminous surface
1 Providing and applying primer coat with
Bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning
of road surface and spraying primer at the Sqm 10509.60 57.50 6,04,302.00 SoR' 2021
rate of 1.2-1.5 kg/sqm using mechanical
means as per Technical Specification
Clause 502
2 Tack coat with Bitumen emulsion (RS-1) Sqm 10509.60 13.63 1,43,246.00 SoR' 2021
3 Providing, laying and rolling of open-graded
premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade
bitumen or emulsion to required line, grade
and level to serve as wearing course on a
previously prepared base, including mixing Sqm 10509.60 184.04 19,34,187.00 SoR' 2021
in a suitable plant, laying and rolling with a
three wheel 80-100 kN static roller capacity,
finished to required level and grades to be
followed by seal coat of either Type A or
Type B or Type C as per Technical
Specification Clause 508.
4 Providing and laying seal coat sealing the
voids in a bituminous surface laid to the
specified levels, grade and cross fall using Sqm 10509.60 85.78 9,01,513.00 SoR' 2021
Type A, Type B and Type C as per
Technical Specification Clause 510
ADDITIONAL HAULAGE
Loading and Unloading of Sand & Aggregate by Manual Means:
4 Loading of Lime, Aggregate, Stone
Boulder, Brick Aggregate, Kankar,
Building Rubbish, Crushed Slag, Stone for Cum 392.22 132.05 51,792.00 SoR 2021
Masonry Work by manual means including
a lead upto 30 m
5 Unloading of Lime, Aggregate, Stone
Boulder, Brick Aggregate, Kankar,
Building Rubbish, Crushed Slag, Stone for Cum 392.22 66.03 25,898.00 SoR 2021
Masonry Work by manual means including
a lead upto 30 m
Loading and Unloading of Bitumen Drums by Manual Means:
6 Loading of Bitumen Drums by manual MT 42.88 198.35 8,505.00 SoR 2021
means including a lead upto 30 m
7 Unloading of Bitumen Drums by Manual MT 42.88 179.25 7,686.00 SoR 2021
Means including a lead upto 30 m
Haulage excluding Loading & Unloading of Sand & Aggregate:
8 Haulage of materials by tipper excluding cost of loading, unloading and
stacking ( aggregates)
7
Rate Amount
Slno Description of item Unit Quantity Remarks.
Rs. Rs.
1 2 3 4 5 6 7
Case-I : Surfaced Road (30 Km) t.km 862.88 6.85 1,77,322.00 SoR 2021
Case-III: Katcha Track and Track in River
t.km 862.88 16.59 71,576.00 SoR 2021
Bed/Nallah Bed and Choe Bed (5 Km)
Haulage excluding Loading & Unloading of Bitumen Drums:
9 Haulage of materials by tipper excluding cost of loading, unloading and
stacking
Case-I : Surfaced Road (680 Km) t.km 42.88 6.85 1,99,731.00 SoR 2021
Grand Total Rs 41,25,758.00
8
ABSTRACT OF COST - ORIGINAL ESTIMATE
(C.P.W.D. Code, Para 330-332)
State : AP Division: Roing
Branch :- RWD Sub Division: Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
PKG. NO. AR/15/03/047
Rate Amount
Slno Description of item Unit Quantity Remarks.
Rs. Rs.
1 2 3 4 5 6 7
Part-IV Emergency/ Special Repair works (SOP-RRM-PDLP-Emarg_Clause-2.7)
NIL
Grand Total Rs -
9
DETAILS OF MEASUREMENT
Block : Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
District : Lower Dibang Valley. PKG. NO. AR/15/03/047
Item
items Details of measurement Qnty Unit
no.
1 2 3 4 5
10
DETAILS OF MEASUREMENT
Block : Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
District : Lower Dibang Valley. PKG. NO. AR/15/03/047
Item
items Details of measurement Qnty Unit
no.
1 2 3 4 5
11
DETAILS OF MEASUREMENT
Block : Roing
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
District : Lower Dibang Valley. PKG. NO. AR/15/03/047
Item no. items Details of measurement Qnty Unit
1 2 3 4 5
12
DETAILS OF MEASUREMENT
Block :Dambuk PKG. NO. AR/15/03/047
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
District : Lower Dibang Valley.
Item no. items Details of measurement Qnty Unit
1 2 3 4 5
NIL
13
THEORITICAL CONSUMTION STATEMENT
PKG. NO. AR/15/03/047
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
Stone
Steel Cement Sand Shingle Boulder
Sl. no. Item Qnty. Aggregate
(MT) (MT) (Cum) (Cum) (Cum)
(Cum)
Part-I Initial Rehabilitation (SOP-RRM-PDLP-Emarg_Clause-2.4)
RCC works
1 RCC grade M 25 6.48 cum 2.27 3.05 5.51
2 RCC Grade M30 ( Wearing coat) 2.30 cum 0.96 1.10 1.95
14
THEORITICAL CONSUMPTION OF MATERIALS
Maintenance of WBM
PKG. NO. AR/15/03/047
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
Sl.No. Item of work Qty in Stone Stone Binding
cum Aggregate Screening material
(53- 11.20 (cum) (cum)
22.4mm) in
cum
1 2 3 4 5 6
15
THEORITICAL CONSUMPTION OF MATERIALS
Patch Repairs with open-graded Premix surfacing, 20mm
PKG. NO. AR/15/03/047
Name of work:- Post DLP Renewal Maintenance of Road from Parbuk to Rambasti
Crushed
Dense
stone
Bitumen
chipping Coarse sand
Sl.No. Item of work Qty Unit emulsion
(13.20- in Cum
(SS-1) in
5.6)mm in
MT
Cum
1 2 3 4 5 6 7
16