Zagwe Building:
Tewolde Building
Payment for sticker work is done.
Sticker works are done.
Ac requested and study is under progress for appropriate installations.
Debrework Building
Shatter maintenance and new work order is requested Medhin plc for the work.
Telephone maintenance work is done.
Sanitary maintenance work is done.
1
Discussion was made with owner representative of the building on methodologies how to maintain the major
defects observed on the building and it is under study.
Electrical contractor which is used for control of electrical power circuit is purchased and fixed.
Shatter maintenance and replacement work is on progress.
Telephone maintenance work is done.
Sanitary maintenance work is done.
Zagwe Building:
Minor maintenance study is under progress.
Sanitary fixtures maintenance work is done.
Maintenance on leakage parts around the corridor of the toilet room is done.
Proforma for fan is evaluated and under purchase process.
Cash lift maintenance is under negotiation for fixing the missed equipment.
AC maintenance work is done.
1. Facilities
CCTV camera service work is done.
Management/ Sticker works on 5th and 12th floors is done.
Building 1. Facilities
Fuel refill for generator is done
Maintenance & Management/
Administration/Cor
porate Building
Admin.
Building
Maintenance &
Administration/Cor
Gofa Sefer Building:
2
Proforma opening for minor maintenance study is sent for committee C for financial evaluation.
porate Building Purchase and refill of fuels for Generators is done.
Admin. New water pipeline installation and related works is done.
40,000.00 litters water delivered due to water shortage
LED and energy saving lamps are fixed.
Addis Ababa Branch Building
Aluminium Shade proposal to protect the rain and surface drain is sent for workshop to fix as pe
design.
Sanitary fixtures maintenance work is done
Cleaning the storm water drainage line work is under progress.
Replaced the damaged wooden door with aluminium.
Water barrel is purchased for toilet rooms.
Tewolde Building
Fixing ventilator work is under process
Sticker works are done.
Debrework Building
Door handling and key replacement and maintenance work is done.
Maintenance work under defect parts of the building is under progress.
Work shop requested to replace the broken glass of the curtain walls.
Some fluorescent lamps and ballast are replaced on the damaged parts of the building.
Purchase and refill of fuels for Generators is done.
New Shatter work and maintenance is done.
Fuel refill for generator is done
Telephone maintenance work is done.
Sanitary maintenance work is done.
Electrical contacter which is used for control of electrical power circuit is purchased and fixed.
Silassie building.
Sanitary maintenance work is done.
Amalga building
Sanitary sewer line and manholes are cleaned
Water tanker maintenance work is done.
3
Proposal for partition work is forward for approval.
Roof maintenance work is done.
Due to the structural warning signs teams are assigned for stone masonry retaining wall constru
side of the building and construction of pavement work around the store of the building.
Zagwe Building:
Minor maintenance study is under progress.
Sanitary fixtures maintenance work is done.
Maintenance and parts replacement of meeting hall sound system.
Preventive maintenance of elevators.
Door key of elevators are replaced.
One time maintenance of CCTV system is under progress.
1. Facilities
Maintenance of the display monitors.
Management/ Terrace and roof maintenance works minor study.
Building Replacement of flexible hose for water tanker.
Maintenance & Partition work for media office.
Administration/Cor Maintenance works for doors handles and key replacements.
porate Building
Admin.
Gofa Sefer Building:
AC service is done.
4
Minor maintenance work is award to the winner.
Shatter work is done.
Painting works for metal fences.
Letter written for demolishing fence works for amendments of design.
Telephone line installation works.
Tewolde Building
Shatter works.
Sticker works are done.
Debrework Building.
Door handling and key replacement and maintenance work is done.
Maintenance work under defect parts of the building is done.
Fixing the broken glass of the curtain walls.
Some fluorescent lamps and ballast are replaced on the damaged parts of the building.
Purchase and refill of fuels for Generators is done.
New Shatter work and maintenance is done.
Fuel refill for generator is done.
Telephone maintenance work is done.
Sanitary maintenance work is done.
Silassie building.
Sanitary maintenance work is done.
Maintenance works on the water pipe lines.
5
Amalga building
Sanitary sewer line and manholes are cleaned
Proposal for partition work is forward for approval.
Minor maintenance work is under progress.
Roof maintenance work is done.