Project Background
03/17/2023 2
As we know 50 Eco-branches has been opened in the first
phase and efforts are underway to open 50 more Eco-branches
under progress
Statement of the Our team has reviewed the progress of the project, held
03/17/2023 3
Objectives
01
works, Fence, Guard houses, Civil and
Compound work) and has been playing a vital
role in the success of the project with
objectives of creating effective flow of work,
optimum utilization of space, favorable
impression on the customers, employee
comfort and satisfaction.
03/17/2023 4
Scope of the project
03/17/2023 5
Methodology
03/17/2023 6
2 Design and Specification
A few limitations discovered in the first phase
03/17/2023 8
THERMO HOUSE Manufacturing PLC.
No Cash Box (Drawer), No sorting & The width of thermos house is too short, Wind power is not done b/c of the
01
Ticket room, all door key is as
05
there is no veranda, due to that the rain 09 concrete work for wind power pole is
supplied with container by supplier enter the branch easily. And Water rain is not included on the agreement and we
which need no change by the bank. still entered into the branch on the top of hear the idea after the contractor done
container which so risky for the computer. all civil work. And Solar power not
The pool area is less for circulation working properly.
Toilet is still not done, the exacted septic
and the drawer and shelf is not Wind power installation not yet
02 provided for the branch. It is better to 06
for toilet is left opened so our branch 10 finished. Room’s height is short and as
staff can't use toilet which is very
consider other option for increasing a result not suitable in a hot region.
challenge for staff.
the area of thermos house. Some nodes and network installation
are not functional.
Rooms are narrow, No table & drawer It is difficult to use toilet inside of thermos The cladding and floor finishing material
03 to sort cash and At window part there
07 house due to less circulation of air. It is 11 is poor in quality. Good quality material
is a place where the money is given to better to construct outside of thermos should be selected.
customer which not closed all time house and also better to increase the
which led to expose the ticket for air. volume of septic tank.
All computers and the staff who are Solar power is disconnected from the There is a space between the wall
partition and roof cover, so this creates
04
working on windows and the waiting
08
system during rain. There is electric power 12 high linkage. There is a poor workman
area for customer are exposed to sun in the village, so it is better to use electric
and rain. It is better to provide shade power. ship on fixing a joint at the edge of
for customer waiting area. partition wall and roof cover. It needs
roof treatment and quality workman ship.
03/17/2023 9
2.3 Stake Holders Mandate in Eko-branch project
District directors
Shall prepare suitable rented area, as per the Ensure the owner of the building to implement the work
guideline. according to the design given by the Bank’s Engineer
The Rentable area must be priory preapproved Request for procurement shall be sent after agreement is
by the banks Engineer, as per the checklist. made between the Bank and the owner of the building.
03/17/2023 11
Design and Building Administration team, district engineers
branding team
Follow up Supervision
Close supervision and Close supervision and
follow up on the owner follow up on the
of the building before selected contractor.
handover.
03/17/2023 13
•Preparing a Contract and Preparing Tender Documents.
1
03/17/2023 14
District Business support
Follow up Support
4 3
Follow up the execution of Give support to districts on the
districts on new branch resources fulfilment of the new
opening activities to timely branches opened by creating
operationalize the new opened alignment with different
branches working units
03/17/2023 15
Supplier /Thermo House Manufacturing PLC/.
Any material used on the site Quality of the work shall be given a priority,
must be preapproved. and it shall be of highest standard, and
Information shall be up to date
Construction shall be Any Change of Design and specification The contractor must Implement the
according to the design and without referring the banks engineer is not work in excellence timely manner
specification provided by the tolerable
bank.