11.2 Objectives
To keep all the stakeholders well informed in advance about the project progress
and future activities. The prior knowledge through proper communication channel
will give confidence to all stakeholders. A prompt and accurate communication
will ensure any change in expectations of a stakeholder or alteration in working
environment, thus enabling the project manager to take necessary action to
mitigate any risk.
• Read and understand the safety codes for research facility layout.
• With a very demanding work schedule, availability of Dr Lipsett for direct
face to face meetings is a big constraint which pushes the project
manager to use other mediums.
• Communication with the research students is deemed optional to them by
Dr Lipsett. Although they will be using the new facility.
• Varying schedule of all the team members is also a hurdle for group
meetings, discussion and brainstorming.
1
11.5 Communication Risks
• Dr Michael Lipsett
• Dr Glenn Thomas
• Roger Marchand
• Dr Lipsett will receive full fledged report on the project progress status, project
issues, project risks, project deliverables and project resources as promised
in project charter. Report will be given in standard format via email. For the
2
progress face to face meetings would be arranged with him as per his
availability.
• Layout planned for the new lab will be conveyed in engineering drawing in
standard format of Chrome engineering via hard copies and auto-cad
drawing.
• Meetings with Roger Marchand will be used to fully understand the process of
heavy equipment transportation. Schedule planning will depend upon this
activity.
• Report on schedule will be provided to Roger for execution activities and
reminders through email.
• Team members will have weekly meetings or more for discussing the
progress and scheduling their activities.
• Online conference on “skype” will be used as and when required for team
communication.
• Team will be using group on “facebook” the social networking website for
communicating
• Team will use www.scribd.com for sharing documents.
Responsible for
Research
movement of light Execution Schedule Once E-mail
Students
stuff
Meeting,
Responsible for
Project Team All reports Weekly Facebook,Scribd,
project management
Skype
3
11.9 Communication Guidelines
11.11 Budget
11.12 Evaluation
• Feedback from all the stakeholders will be evaluated for measuring the
effectiveness of Communication Management Plan.
• Team satisfaction after completing the project and level of motivation during
project is good indicator of healthy communication plan.
• Feedback from Dr Lipsett will be key indicator of project’s success and further
down the line efficiency of utilizing best management practices
(Communication management plan being one of them).
4
11.13 Appendix