● Initial Analysis – Cover Comp Cylinder Head Leakage.

(K1C) 17030-EPHO-F3-007

QIC Report Details Immediate Action Initial Investigation Details


Stock
Verification FTA/Possibility/Viewpoint
# Location Total Qty OK NG Status Contributing Possible cause Mass Production Controls Status
stage
Hole Dia Inspector 2 nos. @ set up & 2 Pc 3 times /shift
1 HMSI Machine O
500 - - U/I oversize. 1/10 parts inspected by operator by Plug Gauge.

2 TPC - - Deep Lining marks


Chips cleaning by Air pressure gun after each part
in hole. O

3 JL Auto 276 276 0 OK Plug cone O.D


100 % inspection by optical sorter before pressing. O
undersize.

Immediate Measures Setting Part


Red bin available for setting part disposition O
Mix up

Now Condition Changed Condition Cover Comp Cyl Leakage W/o leakage part
Input and Output Location Separate O
Head – Leakage Testing mix up with OK

HMSI
Final No Checkpoint for O
100% Visual checkpoint for punch mark
COVER COMP CYLINDER inspection punch marks
Problem :
HEAD- LEAKAGE.
Training to Inspectors & supervisor O
T/R No. : 2HMSI-2024-768-00
Single inspector No Identification
Dedicated inspector will O
Part Name : COVER COMP,CYLINDER HEAD checking multiple PDI & Dispatch for inspected Identification Tag with OK material
Supplier
check leakage test punch material
visual check points,
mark and confirmation will
Model [Factory] : 12310K1C D000 Including confirmation Training to all Dispatch Team . O
be done by pencil marking
of leakage testing
Lot No. - 580-2404-01 punch mark
on each part Direct Cause [If established]:-
Lot Detail : Date - 23-04-2024 C/m Lot details
Qty. - 02 Identification– Glass Occurrence cause Under analysis.
Detection
:
Pencil Mark near Leakage Temporary CM taken to control Outflow
Stage test Punch mark
Maker & Invoice No-029998
: JL Autoparts & Faridabad
Location Date – 28.09.2024
● Initial Analysis – Cover Comp Cylinder Head Leakage.(K1C) 17030-EPHO-F3-007

Glass pencil
marking on part
nearby Punch

Oil Gallery

Body
Leakage

As a improvement, Leakage
testing m/c build up pressure Leakage assured thru Punch 100% marking start on each part
increased from 0.3 kgf Cm² to mark with invoice cut off Details
0.35 kgf Cm².