(K1C) 17030-EPHO-F3-007
Now Condition Changed Condition Cover Comp Cyl Leakage W/o leakage part
Input and Output Location Separate O
Head – Leakage Testing mix up with OK
HMSI
Final No Checkpoint for O
100% Visual checkpoint for punch mark
COVER COMP CYLINDER inspection punch marks
Problem :
HEAD- LEAKAGE.
Training to Inspectors & supervisor O
T/R No. : 2HMSI-2024-768-00
Single inspector No Identification
Dedicated inspector will O
Part Name : COVER COMP,CYLINDER HEAD checking multiple PDI & Dispatch for inspected Identification Tag with OK material
Supplier
check leakage test punch material
visual check points,
mark and confirmation will
Model [Factory] : 12310K1C D000 Including confirmation Training to all Dispatch Team . O
be done by pencil marking
of leakage testing
Lot No. - 580-2404-01 punch mark
on each part Direct Cause [If established]:-
Lot Detail : Date - 23-04-2024 C/m Lot details
Qty. - 02 Identification– Glass Occurrence cause Under analysis.
Detection
:
Pencil Mark near Leakage Temporary CM taken to control Outflow
Stage test Punch mark
Maker & Invoice No-029998
: JL Autoparts & Faridabad
Location Date – 28.09.2024
● Initial Analysis – Cover Comp Cylinder Head Leakage.(K1C) 17030-EPHO-F3-007
Glass pencil
marking on part
nearby Punch
Oil Gallery
Body
Leakage
As a improvement, Leakage
testing m/c build up pressure Leakage assured thru Punch 100% marking start on each part
increased from 0.3 kgf Cm² to mark with invoice cut off Details
0.35 kgf Cm².