447 Final Inspn Edited PDF
447 Final Inspn Edited PDF
447 Final Inspn Edited PDF
PCD Checking
Pitch Circle Final Inspection
7 0.05 Max Fixture and Dial N = 5 / 1000
Runout Report
LC 0.001
1,201,401,601,801
No Gleason Tester
Note: 1. '*-CTQ'Parametes to be Checked after every significant Event.
(Power Cut, Insert change,corner Change,Offset Correction, Tool Holder Chanage ) Page 24
CONTROL PLAN NO. CP/OCF/447 ALL DIMENSIONS ARE IN (mm) UNLESS OTHERWISE STATED
Single Pitch
9 MIS - 12 35µm MAX CMM
Error
Quarantine the
affected parts,
Accumulative Final Inspection
10 MIS - 13 135µm MAX CMM N = 1/1000 identify and
Pitch Error Report seggregate for QC
review and Decision
11 Pitch Variation MIS - 14 45µm MAX CMM
Topography
13 MIS - 24 ±35 µ Max CMM
( 4 Teeth )
18 Mar 2023 14
Bore Surface
0.8 Ra Max Surfcom N = 5 / 1000
Final Inspection Quarantine the
Finish Report affected parts,
identify and
Spherical Final Inspection seggregate for QC
15 0.8 Ra Max Surfcom N = 5 / 1000 review and Decision
Surface Finish Report
FORGING DEFECTS LIKE
CRACK, UNDERFILL / Final Inspection
MIS - 1 Visual N = 100%
UNCLEAN ETC SHOULD Report
Quarantine the
NOT EXIST
MACHINING DEFECTS affected parts,
16 Appearance LIKE DENT, BURR,
identify and
seggregate for QC
CHIPS, UNCLEAN, Final Inspection review and Decision
MIS - 2 Visual N = 100%
OPERATION MISS, Report
SCRATCH MARK ETC
SHOULD NOT EXIST
1,201,401,601,801
Quarantine the
affected parts,
Heat treatment As per Heat treatment Specification
19 2 / Heat Lot Lab Report identify and
Specification : 447-230-2.1 seggregate for QC
review and Decision
18 Mar 2023
Applicable
Layout As per stage drawing - As per sampling plan
20 MIS - 28 447-42-111
Inspection N = 3 (ONCE PER YEAR) Final Inspection Report
Q/SQA/OCF/01
Inspection
Instruments
3RD PARTY
22 ELV MIS - 36 As Per SES N 2402 N = 1 / Year Final Inspection Report
REPORT
Doubt
Out of 22 OK 6 Not
OK 15 Doubt 1