Project Scope: Construction Management Lab. Civil Engineering Department of ITS
Project Scope: Construction Management Lab. Civil Engineering Department of ITS
Project Scope: Construction Management Lab. Civil Engineering Department of ITS
Project
Scope
II - 2
Initiation
II - 5
• Technical Requirements
– Home must meet local building codes.
– All windows and door must pass NFRC Class 40 energy ratings
– Exterior wall insulation must meet an “R” Factor of 21
– Ceiling insulation must meet an “R” factor at 38
– Floor insulation must meet an “R” factor at 25
– Garage will accomodation two large-size cars
– Structure must pass seismic stability code.
• Limits & Exclutions
– The home will be build to the specifications and design of the original
blueprint provided by customer.
– Owner responsible for landscaping.
– Air conditioner is not included but prewiring is included.
– Contractor responsible for subcontractor work.
• Customer Review
– John and Joan smith
II - 6
Scope Definition
Activity
Activity Resources
Resources ActivityDuration
Activity Duration Department
Department
Volume
Volume Requirement
Requirement Estimates
Estimates Responsibled
Responsibled
II - 8
Metoda membuat WBS
II - 9
Keterkaitan WBS/OBS dan CBS
WORK PACKAGE
II - 10
II - 11
Scope Verification
II - 14
Go to the
Next Lesson
20%