Tuticorin Geotechnical Report
Tuticorin Geotechnical Report
Tuticorin Geotechnical Report
PROJECT NAME
Page 1 of 9
GP/R/2018-19/05 07.08.2018
To
CS AND ASSOCIATES PVT. LTD.,
CS towers, 214/6&7, KMS Garden, Ramakrishna Road,
Alagapuram, Salem - 636016.
Dear Sir,
We are pleased to hereby transmit Two (02) original Hard Copies and Soft Copies sent to your
concern address, our final Geotechnical Investigation Report for the above mentioned project. If you
have any questions, please contact this office.
It has been a pleasure being of service to you on this project. Assuring you of our continued co-
operation, we remain.
(Authorized Signatory)
Page 2 of 9
CONTENTS
1 INTRODUCTION 4
2 FIELD INVESTIGATIONS 4
2.3 SAMPLING 6
3 LABORATORY TESTS 6
4 FOUNDATION ANALYSIS 7
5 DESIGN CRITERIA 8
6 FOUNDATION RECOMMENDATIONS 8
7 PRECAUTIONS 8
8 LIMITATIONS 9
9 REFERENCE 9
10 ANNEXURE
Page 3 of 9
1. INTRODUCTION
Geo-technical site investigation work for the construction. The primary purpose of our
investigation is to obtain data to develop foundation design recommendations for the above work. At,
first instance, two boreholes was bored at site. Client’s representatives choose a no of location and
selected the locations of borings. To accomplish these purposes, the following tasks were performed:
1. Detailed soil borings were done up to stratum to explore the sub surface stratigraphy and
obtain soil samples for testing.
2. Field and laboratory tests were conducted to evaluate the index and engineering properties of
the soils
3. Engineering analysis were performed to develop foundation design information for
proposed structure
2. FIELD INVESTIGATIONS
Rotary drilling technique was adapted using Calyx machine in this field. In this method,
boring is effected by the cutting action of a rotating bit that is kept in firm contact with the bottom of
the hole. The bit is attached to the lower end of a hollow drill rod that is rotated by a suitable chuck.
Drilling mud (usually Bentonite) is continuously forced down the hollow drill rods. The mud returning
upwards though the annular space between the drill rods and the side of the hold bring the cutting to
the surface.
It is now most commonly used in site test. The test measures the penetration resistance of the
split spoon sampler, when it is driven into the soil, at the bottom of a borehole in a standard manner.
The N-value, which is the number of blow required to achieve 300mm penetration of the soil, indicates
the relative density of sand or gravel, the consistency of other soil such as silts or clays and the
strength of weak rocks.
Page 4 of 9
The test is described in IS 2131 - 1981. The split spoon sampler is attached to stiff drill rod
and lowered to the bottom of the bore hold. A standard blow consists of dropping a mass of 63.5kg
free fall through 750 mm on to an anvil at the top of the rods and ensuing that this amount of
dynamic energy is transferred to the sampler as much as possible.
The number of blows required to achieve each 150mm penetration is recorded for a fall
penetration of 450mm. The initial 150mm penetration is referred to as seating drive and the blows
required for this penetration are not considered as this zone is in disturbed soil. The next 300mm of
penetration is referred to as the test drive and the number of blows required to achieve this fully is
termed the penetration resistance or N-value.
The total number of blows (N) required, to advance the spoon into the bore, for another two
successive 15cm (a total of 30 cm) is recorded as a measure of the soil relative density or consistency
as given in Table.
Page 5 of 9
Rock samples were extracted by Rotary drilling technique using double tube core barrel of
76mm diameter, filter with a diamond bit. The extracted cores for every run, not exceeding 1.0
meter were arranged in the core boxes and the T.C.R as well as R.Q.D values were measured. The
appropriate estimation of the properties of the encountered rock strata can be obtained by referring to
the borehole logs and the following description
90 – 100 Excellent
75 – 90 Good
50 – 75 Fair
25 – 50 Poor
0 - 25 Very Poor
35 – 50 Intermediate rock
50 – 85 Medium rock
The fieldwork was carried out under the close supervision of our engineer in accordance with
Indian Standard mentioned earlier.
2.3. SAMPLING
Soil samples were collected through Split spoon and rock core sample were collected through
single tube core barrel.
Page 6 of 9
3. LABORATARY TESTS
The operations to be performed in the laboratory depend upon the type of the nature of data
required for the problem at hand. In case of cohesionless material, like sand, the laboratory tests are
usually minimum and the design parameters are worked out from field test data such as form SPT- N
value, Core resistance and plate load test data.
In the case of cohesive soils, the programme of laboratory testing can vary from carrying out
simple tests such as unconfined tests to comprehensive study of soil behaviour using triaxial shear
tests and consolidation tests.
4. FOUNDATION ANALYSIS
4.1 Soil Profile
The profile of the area as observed in the bore hole is given in the chart. The Borehole is
terminated at maximum depth of 10.50m.
The allowable bearing pressure based on tolerable settlement has been established empirically by
Terzaghi and Peck, 1948 and may be expressed by the equation.
Page 7 of 9
Safe bearing capacity (SBC) = 3.5 (N-3) {(B+0.3)/2B}2 X RW X FD +P
Where,
N = Collected N value N2
B = Width of Foundation = constant 1
RW = Water Correction = constant 0.5
FD = Depth of Factor = constant 1
P = Over Burden Pressure
5. DESIGN CRITERIA
5.1 Design of Foundations
6. PRECAUTIONS
Entire report should be studied before implementing the recommendations. Loose pockets of
soil, if encountered shall be removed and backfilled with a levelling course of concrete shall be laid
and construction of foundations with IS CODE recommends can be taken up subsequently.
Page 8 of 9
7. LIMITATIONS
The soil investigations have been carried out at locations in the site chosen by the client so as
to represent the entire site. The recommendations provided in this report are hence valid only for
these test locations. However, if there is any change in sub soil conditions and properties at places
between or beyond chosen test locations, GLOBAL PROJECTS may be contacted for further advice.
With passage of time, the recommendations may vary due to manmade and natural
environmental changes.
Er. S.ANAND., ME(GEOTECH)
GEOTECHNICAL ENGINEER
8. REFERENCES
1. IS: 6403-1981
3. IS: 2131-1980
7. Bowles J.E,(1982) Foundation Analysis and design ,3rd edition, Mc Graw Hill International Book
Co.
8. Tomlinson M.J. (1995) Foundation Design and Construction, 6th edition, Longman Group.
Page 9 of 9
ANNEXURE – I
1
Bore Log
Ref: GGF/R/2017-18/97
Name of Project: GEOTECHNICAL INVESTIGATION WORK FOR THE CONSTRUCTION OF
Date of
Soil 28.07.2018
GLOBAL PROJECTS, Commencement
Investigation Type of Drilling: Rotary – Mud Circulation
Madurai.
done by: Date of Completion 28.07.2018
Relative density /
conducted
Depth below
Consistency
Graphical representation of
Soil Profile
G.L.(R.L)
For
100
20
40
60
80
15cm 30cm 45cm
30cm
1.00 4 5 6 11 Stiff
2.00 6 7 9 16 Do
3.00 8 10 12 22 V Stiff
4.50 11 21 21 42 Hard
9.00 R* - - >50 Do
3.40
CLAY WITH
3.20
GRAVELL
6.60
SOFT
DISINTEGRATED
ROCK 2.40
9.00
2
Bore Log
Ref: GGF/R/2017-18/97
Name of Project: GEOTECHNICAL INVESTIGATION WORK FOR THE CONSTRUCTION OF
Date of
Soil 28.07.2018
GLOBAL PROJECTS, Commencement
Investigation Type of Drilling: Rotary – Mud Circulation
Madurai.
done by: Date of Completion 28.07.2018
Relative density /
conducted
Depth below
Consistency
Graphical representation of
Soil Profile
G.L.(R.L)
For
20
40
60
80
10
15cm 30cm 45cm
0
30cm
1.00 4 3 5 8 Stiff
2.00 5 6 7 13 Do
3.00 7 8 9 17 V Stiff
4.50 9 10 13 23 Hard
6.00 14 16 18 34 Do
SILTY CLAY
6.50 7.50 15 17 20 37 Do
6.50
CLAY WITH
1.30
GRAVELL
7.80
2.70
SOFT
DISINTEGRATED
ROCK
10.50
3
Bore Log
Ref: GGF/R/2017-18/97
Name of Project: GEOTECHNICAL INVESTIGATION WORK FOR THE CONSTRUCTION OF
Date of
Soil 28.07.2018
GLOBAL PROJECTS, Commencement
Investigation Type of Drilling: Rotary – Mud Circulation
Madurai.
done by: Date of Completion 28.07.2018
Relative density /
conducted
Depth below
Consistency
Graphical representation of
Soil Profile
G.L.(R.L)
For
20
40
60
80
10
15cm 30cm 45cm
0
30cm
1.00 4 5 6 11 Stiff
2.00 5 7 9 16 Do
3.00 6 7 10 17 V Stiff
4.50 8 9 14 23 Do
6.00 14 15 16 31 Do
SILTY CLAY
6.50 7.50 17 20 29 49 Hard
10.50 R* - - >50 Do
6.50
CLAY WITH
1.30
GRAVELL
7.80
2.70
SOFT
DISINTEGRATED
ROCK
10.50
CORRECTED N VALUE
DEPTH OF SAMPLING
NATURAL MOISTURE
OBSERVED N VALUE
CAPACITY (t/m2)
SOIL PROFILE AND
SPECIFIC GRAVITY
DEPTH IN METRES
CLASSIFICATION
SAFE BEARING
%
DEPTH (m)
MEDIUM SAND
PLASTIC LIMIT
COARSE SAND
LIQUID LIMIT
IS SOIL
FINE SAND
CONTENT
GRAVEL
INDEX
%
%
1.00 11 11.0 8.0
3.40
GC 19.3 NP NP NP 21 6 11 17 45 2.54
SDR - - - - - - - - - -
(WS)
9.00 >50 50.0 47.2
9.00
ML – SILTY CLAY, GC - CLAYEY GRAVEL, SDR – SOFT DISINTEGRATED ROCK (WASH SAMPLE), SBC is based on SPT values
*NP – Non Plastic, N/A – Not Applicable
2
Ref: GGF/R/2017-18/97 SOIL TEST RESULTS
CAPACITY (t/m2)
SOIL PROFILE AND
SPECIFIC GRAVITY
DEPTH IN METRES
CLASSIFICATION
SAFE BEARING
%
CORRECTED N
OBSERVED N
DEPTH (m)
MOISTURE
SAMPLING
MEDIUM SAND
PLASTIC LIMIT
DEPTH OF
COARSE SAND
NATURAL
LIQUID LIMIT
IS SOIL
VALUE
VALUE
FINE SAND
CONTENT
GRAVEL
INDEX
%
%
1.00 8 8.0 5.0
10.50
3
Ref: GGF/R/2017-18/97 SOIL TEST RESULTS
Soil Investigation done WORK STARTED
28.07.2018
by: LOCATION: GROUND WATER LEVEL: ON
BORE HOLE NO: 03
GLOBAL PROJECTS, Mentioned on Map Not met WORK
28.07.2018
Madurai. COMPLETED ON
INDEX TEST SIEVE ANALYSIS %
CAPACITY (t/m2)
SOIL PROFILE AND
SPECIFIC GRAVITY
DEPTH IN METRES
CLASSIFICATION
SAFE BEARING
%
CORRECTED N
OBSERVED N
DEPTH (m)
MOISTURE
SAMPLING
MEDIUM SAND
PLASTIC LIMIT
COARSE SAND
DEPTH OF
NATURAL
LIQUID LIMIT
PLASTICITY
VALUE
VALUE
FINE SAND
CONTENT
GRAVEL
INDEX
%
%
1.00 11 11.0 8.0
10.50
New Bridge
BH.3
Water Tank
1
Bore Log