Cost Estimation Bund
Cost Estimation Bund
Cost Estimation Bund
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 4,842.01 m3 6.00
2.4 Import extra fill material stockpiled from other bund site including cart
into the site. 8,024.62 m3 11.30
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 11,261.70 m3 4.50
Total
(RM)
10,000.00
14,500.00
29,052.03
90,678.18
50,677.65
35,229.90
230,137.75
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 8,562.03 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 878.29 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 5,543.24 m3 4.50
Total
(RM)
10,000.00
14,500.00
51,372.20
7,641.11
24,944.57
35,229.90
143,687.78
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 8,657.66 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 866.34 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 5,626.91 m3 4.50
Total
(RM)
10,000.00
14,500.00
51,945.96
7,537.14
25,321.08
35,229.90
144,534.08
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 9,782.58 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 2,168.10 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 5,168.84 m3 4.50
Total
(RM)
10,000.00
14,500.00
58,695.47
18,862.45
23,259.76
35,229.90
160,547.59
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 12,056.38 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 1,509.94 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 7,532.35 m3 4.50
Total
(RM)
10,000.00
14,500.00
72,338.29
13,136.48
33,895.56
35,229.90
179,100.23
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 8,033.83 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 2,063.41 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 3,961.97 m3 4.50
Total
(RM)
10,000.00
14,500.00
48,202.98
17,951.65
17,828.84
35,229.90
143,713.36
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 11,709.50 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 4,693.79 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 4,088.34 m3 4.50
Total
(RM)
10,000.00
14,500.00
70,257.02
40,835.99
18,397.51
35,229.90
189,220.41
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 12,450.36 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 4,782.62 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 4,555.15 m3 4.50
Total
(RM)
10,000.00
14,500.00
74,702.17
41,608.79
20,498.18
35,229.90
196,539.04
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 13,314.86 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 6,275.31 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 3,710.83 m3 4.50
Total
(RM)
10,000.00
14,500.00
79,889.13
54,595.21
16,698.74
35,229.90
210,912.97
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 5,736.67 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 0.00 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 4,505.53 m3 4.50
Total
(RM)
10,000.00
14,500.00
34,420.00
0.00
20,274.89
35,229.90
114,424.79
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 2,698.40 m3 6.00
2.4 Import extra fill material stockpiled from other bund site including cart
into the site. 962.13 m3 11.30
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 3,468.10 m3 4.50
Total
(RM)
10,000.00
14,500.00
16,190.38
10,872.01
15,606.43
35,229.90
102,398.72
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 4,706.16 m3 6.00
2.4 Import extra fill material stockpiled from other bund site including cart
into the site. 740.80 m3 11.30
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 5,298.81 m3 4.50
Total
(RM)
10,000.00
14,500.00
28,236.98
8,371.07
23,844.63
35,229.90
120,182.58
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 12,600.00 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 8,427.00 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 1,023.00 m3 4.50
Total
(RM)
10,000.00
14,500.00
75,600.00
73,314.90
4,603.50
35,229.90
213,248.30
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 5,540.53 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 1,402.74 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 2,752.66 m3 4.50
Total
(RM)
10,000.00
14,500.00
33,243.20
12,203.86
12,386.96
35,229.90
117,563.92
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 0.60 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 10,144.42 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 7,188.88 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 419.43 m3 4.50
Total
(RM)
6,000.00
8,700.00
60,866.49
62,543.27
1,887.44
35,229.90
175,227.09
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 0.40 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 4,594.22 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 3,147.71 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 297.96 m3 4.50
Total
(RM)
4,000.00
5,800.00
27,565.32
27,385.08
1,340.80
14,091.96
80,183.15
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 8,859.84 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 2,600.95 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 4,043.93 m3 4.50
Total
(RM)
10,000.00
14,500.00
53,159.02
22,628.23
18,197.69
35,229.90
153,714.83
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 6,195.05 m3 6.00
2.4 Excavation in all materials other than rock including cart and stockpiling
away from site 1,333.19 m3 8.70
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 3,313.10 m3 4.50
Total
(RM)
10,000.00
14,500.00
37,170.32
11,598.75
14,908.95
35,229.90
123,407.91
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA SAMARAHAN
2.1 Survey and setting out of the works as specified 1.00 km 10,000.00
2.3 Excavation in all materials other than rock including stockpiling aside for
bund construction 3,852.82 m3 6.00
2.4 Import extra fill material stockpiled from other bund site including cart into
the site. 219.36 m3 11.30
2.5 Take from stockpile on site, lay, grade and compact in layers suitable
excavated fill material to formation level (compacted volume) 4,028.31 m3 4.50
Total
(RM)
10,000.00
14,500.00
23,116.92
2,478.78
18,127.39
35,229.90
103,452.99
NAIKTARAF PERIMETER PARIT DAN BAN BAGI TEBATAN BANJIR DAN KERJA-KERJA LAIN DI IADA
SAMARAHAN
Summary of Costs
BUND A
1 Bund A Ch 0 to 1000 230,137.75
BUND B
1 Bund B Ch 0 to 1000 120,182.58
Total
,137.75
,687.78
,534.08
,547.59
,100.23
,713.36
,220.41
,539.04
,912.97
,424.79
,398.72
5,216.71
,182.58
,248.30
,563.92
183.15
,714.83
,407.91
,452.99
,753.68
6,970.39
2.164
2.526
1.404
1.08
3.848
2.656
1.733
1.747
2.303
2.887
2.612
2.929
3.301
4.143
5.53 Road side drain
7.34
6.291 Steel
9.775 rc
7.993 lean concrete
0.495 formwork
7.292 excavation
9.143
6.667
4.462
4.704 Interceptor
6.235 Steel
5.263 rc
3.451 lean concrete
3.463 formwork
3.98 excavation
2.899
2.888
1.628
1.079 Interceptor
3.997382 Steel
rc
lean concrete
formwork
120 8.8 111.2 excavation
113
2
226
1356 169.5
2712
8
1400
11200
14
d side drain
0.2
1781 8.94
356.2 1400
2137.2 12516
1781
#REF!
36000
#REF!
70000 #REF!
2200 30800 #REF!
592.65
3.008 2.085 0.923
3.007 2.145 0.862
3.007 2.129 0.878
3.007 2.077 0.93
3.006 1.646 1.36
3.006 1.596 1.41
3.006 1.622 1.384
1693 3.005 1.859 1.146
f 240 3.005 1.829 1.176
c 612 5.226 2.78 2.446
pt 150 3.706 2.035 1.671
sav 170 3.491 1.678 1.813
as 110 1.33325
hp 60
mkn 180
bb 71
100
580
2625 2887.5
333366