1000mm x 1000mm ACCESS PANEL * FINAL PUMP HEAD TO BE VERIFIED BY CONTRACTOR UPON APPROVED FULL HYDRAULIC CALCULATION AND
ACTUAL SELECTION OF EQUIPMENT. Abu Dhabi Airports Company PJSC
Planning & Development
GALVANIZED LADDER GALVANIZED LADDER * ALL ISOLATING VALVES INSTALLED ON THE FIRE FIGHTING PUMPS TO BE PROVIDED WITH TAMPER SWITCH PO Box 94449, Abu Dhabi, U.A.E
TRENCH DRAIN WITH GRATING CONNECTED TO BMS AND MAIN FIRE ALARM PANEL. T: +971 (0) 2 505 5000
DOMESTIC WATER CIRCULATION PUMPS FWCP-1 & 2 150mm OS & Y GATE VALVE * ALL TANKS LOW, HIGH LEVEL INDICATORS SHALL BE CONNECTED WITH BMS SYSTEMS. F: +971 (0) 2 575 8300
(DWCP-1 & 2) FOR DETAIL REFER OS&Y OS&Y
DWG. NO. 76-10526-W111 200mm SUCTION HEADER * ALL PUMP PLINTH DIMENSIONS SHALL BE 100mm LARGER THAN PUMP DIMENSION IN BOTH SIDES. REFER
TO STRUCTURE PACKAGE
200mm FP-1 SUCTION PIPE
200mm FP-1 DISCHARGE PIPE OS&Y JP OS&Y FIRE WATER CIRCULATION PUMP SCHEDULE
200mm FP-2 SUCTION PIPE
FP-1 FP-2
METERING FOR TESTING 150mm FLEXIBLE PIPE
OS&Y
50mm JP SUCTION PIPE UNIT NO. FWCP - 1 FWCP - 2
DOMESTIC WATER TRANSPER PUMPS NRV
OS&Y 200mm FP-2 DISCHARGE PIPE
(DWTP-1 & 2) FOR DETAIL REFER NRV FS TS NRV SYSTEM SERVED FIRE WATER FIRE WATER GHD GLOBAL PTY LTD
DWG. NO. 76-10526-W111 NRV DIESEL PUMP DISCHARGE MANIFOLD
OS&Y 3rd Floor, Guardian Tower, Danet Community
OS&Y PO Box 45921 Abu Dhabi United Arab Emirates
200mm DISCHARGE HEADER TS DIESEL TANK 526.1 LITERS(139 GALLONS) BUILDING MAIN BLDG. MAIN BUILDING
TS T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com
BASEMENT FIRE BASEMENT FIRE
OS&Y FUEL PIT 1m (L) x 1m (W) x 0.55m (D) ROOM
150mm PIPE FOR PUMP ROOM PUMP ROOM
BREECHING INLET T/A TS
Specialist Consultant
CONTROL PANEL FOR PUMP ROOM STAIR # 4 SPECIFIC TYPE CIRCULATION PUMP CIRCULATION PUMP
JOCKEY PUMP (JP-1 & 2) 100mm MAIN SPRINKLER PIPE T/A
CONTROL PANEL FOR FHC FOR UTILITY BUILDING FLUID FIRE WATER FIRE WATER
CIRCULATING PUMPS (FWCP-1 & 2)
UA TEMPERATURE (C) 40 40
Fire Life Safety, Planning
and Regulatory Specialist
TANK VENT
CONTROL PANEL FOR
DIESEL FIRE PUMP (FP-2) FLOW RATE (M3/HR) 28.33 28.33
CONTROL PANEL FOR 150mm MAIN SPRINKLER PIPE TO U/G
ELECTRICAL FIRE PUMP (FP-1) FOR MAIN BUILDING TOTAL HEAD (m OF WATER) 15.0 15.0
150mm MAIN LV & FHR PIPE TO U/G Specialist Consultant
FOR MAIN BUILDING RPM 2910 2910
150mm LV & FHR PIPE AT U/G 50mm JP DISCHARGE PIPE
FOR MAIN BUILDING BASE TYPE CONCRETE CONCRETE
FOR CONT. REFER DWG. NO. 76-10526-F101 PUMP ROOM DOOR LOUVERED TYPE
THE LOUVER SHALL BE AUTOMATICALLY OPENED DURING Third Party
THE DIESEL PUMP OPERATION QUANTITY 1 1 Operational Advisor
150mm SPRINKLER PIPE AT U/G
KW 2.2 2.2
FOR MAIN BUILDING
FOR CONT. REFER DWG. NO. 76-10526-F101 1-WORKING & 1 STAND-BY WITH EMERGENCY POWER
REMARKS SUPPLY FOR BOTH PUMPS
Client