PI - Template - 06A Water ITP
PI - Template - 06A Water ITP
PI - Template - 06A Water ITP
14 Removal of RPZD by Visual and dimensional check to Sydney Water Standards X H H Water Main
16 appropriately licensed Connection
plumber Report
15 Connection to System Visual and dimensional check to Sydney Water Standards. X H W Water Main
17 Connection
Report
16 Property Water Connection Visual and dimensional check to Sydney Water Standards. Checklist completed. W S S Checklist
17 (Drilling)
17 Installation of property Visual and dimensional check to Sydney Water Standards. Checklist completed. W S S Checklist
17 service (main to meter)
18 Dual Water Flow Test Flow test of drinking water system. Lock and tag meter ball valve. X W H Water Main
17 property service/s (main to Flow test of recycled water system. Lock and tag meter ball valve. Connection
meter) Report
19 Restoration and Post Visual inspection against photographs. Clearance letter from Council/property owner X H H Clearance
17 Connection Inspection letter
20 Validation No Amendment Date Reviewed Symbol Legend
17
I certify that the works have been X Inspection by
constructed in accordance with
Sydney Water Standards and the H Mandatory Hold Point
Inspection and Test Plan
W Option given to inspect
Water Servicing Coordinator S Surveillance
Date / /
* Sydney Water reserves the right to vary these requirements at any time ** Sydney Waters written approval MUST be obtained prior to varying these requirements
Line No:
Date:
No. Description
Minimum Standard
1.1 Photographic record #
Page 3 of 3
ATTACHMENT 5C
SYDNEY WATER
Page 4 of 3
ATTACHMENT 5C
SYDNEY WATER
Page 5 of 3
ATTACHMENT 5C
SYDNEY WATER
Page 6 of 3
ATTACHMENT 5C
SYDNEY WATER
Page 7 of 3
ATTACHMENT 5C
SYDNEY WATER
Page 8 of 3
ATTACHMENT 5C