F127 76-10526-Detail Design: Fire Protection Services - Level 3 Plan - Part 1
F127 76-10526-Detail Design: Fire Protection Services - Level 3 Plan - Part 1
F127 76-10526-Detail Design: Fire Protection Services - Level 3 Plan - Part 1
A
BL
QI
Notes
E
80mm FIRE PIPE TO FHR
65mm LV & 40mm FIRE HOSE RACK
(CO2 TYPE 5 KG.)FE2 &
50 50 AIR RELEASE VALVE
50
Job Project
50
No Revision Drawn Manager Director Date
65mm SPRINKLER PIPE RISER
STAIR # 1 FROM PREACTION VALVE
IN LEVEL 2
25 25 25 25 Note: * indicates signatures on original issue of drawing or last revision of drawing
Conditions of Use. This document may only be used by GHD's client (and any other
SPRINKLER SYSTEM person who GHD has agreed can use this document) for the purpose for which it was
AIR RELEASE VALVE
50
50
prepared and must not be used by any other person or for any other purpose.
25 25 25 25 D
Master Developper / Owner
40
40
Abu Dhabi Airports Company PJSC
25 25 25 25 Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300
25
25
WATCH ROOM
25
25
25 Lead Consultant
Specialist Consultant
Specialist Consultant
Third Party
Operational Advisor
Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
Title