For Continuation Refer To DWG No. Mdd1C-Dsi-A01-Sdw-Mep-Cs-M1965
For Continuation Refer To DWG No. Mdd1C-Dsi-A01-Sdw-Mep-Cs-M1965
For Continuation Refer To DWG No. Mdd1C-Dsi-A01-Sdw-Mep-Cs-M1965
MDD1C-DSI-A01-SDW-MEP-CS-M1965
A
AAA
F
A0X
G
FGL
B
E
QND 3300
QQQ
C
D
T
N
MECCA
A01 KEY PLAN SITE KEY PLAN
NOTES:
A0X
F
A1X
G
SECTION B-B
03
A1X
F PROJECT:
SECTION C-C
04
04
PHASE 1C-SUPER BLOCK AAA BUILDING A01 LEVEL BM
MDD1C-DSI-A01-SDW-MEP-CS-M1953
AHU MECHANICAL ROOM (A01-BM:A.03) EQUIPMENT
ENLARGE PLAN (SHEET 1 OF 4 )
PROJECT MANAGER
TiME Qatar
Thani Bin Abdulla Building
B 3rd Floor, Block 4, C Ring Road
Um Guwailina, P.O.Box 24360
Doha, Qatar
Fax: 00 974 4050699
DESIGN CONSULTANT:
MDD1C-DSI-A01-SDW-MEC-AP-1151
MDD1C-DSI-A01-SDW-MEP-PD-1151
CEG
INTERNATIONAL
SECTION D-D MDD1C-DSI-A01-SDW-MEP-PS-1151
05
MDD1C-DSI-A01-SDW-MEC-AC-1151
MAIN CONTRACTOR:
MDD1C-DSI-A01-SDW-FPS-SW-1151
04
CW Item No :BP-1C-01-19869
MEP CONTRACTOR:
CEG
INTERNATIONAL
CEG has reviewed this Submittal, but only for the purpose of checking for Drawing title
conformance with the Design Intent expressed in the Contract
-- Documents. CEG's action on a specific item does not indicate approval of
PHASE 1C-SUPER BLOCK AAA BUILDING A01
ST-05
an assembly of which an item is a component, nor of an item as delivered LEVEL BM AHU MECHANICAL ROOM
and installed if it does not conform to the Contract Documents.
Contractor/Supplier is responsible for checking for deviations between (A01-BM:A.03) EQUIPMENT ENLARGE PLAN
this Submittal differing information or conditions in the Contract (SHEET 1 OF 5 )
D
01
and in conformance with the Contract Documents. If more than one
submittal review stamp appears on this Submittal, the most stringent
SECTION E-E actions and annotations shall apply. Signature of a submittal review
SCALE - 1:50 06
stamp by CEG or a Consultant does not imply that it has reviewed Work
not within its professional discipline or scope of services.
MDD1C-DSI-A01-SDW-MEP-CS-M1953 04