12-SOP For Cable Terminations
12-SOP For Cable Terminations
12-SOP For Cable Terminations
Doc. No.
Revision
No.
I - INTEGRATED
M - MANAGEMENT
S - SYSTEM
Date
21/11/2016
AUTHORISED BY
PAGE NO.
1 OF 1
TITLE
Doc. No.
TERMINATIONS
FORwith
HT/LT
LINE
Revision
29)
Ensure SOP
thatFOR
theCABLE
workman
is provided
the
proper
Personnel 1
No.
Protective Equipments required.
30)
Also ensure
that safety /caution boards are displayed at
I - INTEGRATED
necessary points.
M - MANAGEMENT
Date 21/11/2016
S - SYSTEM
PREPARED BY ABHAY
AUTHORISED BY
PAGE NO.
1 OF 1