Cable Tray Installation
Cable Tray Installation
Cable Tray Installation
C
Facility Management
Division
Page 1 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
METHOD STATEMENT
CABLE TRAY/LADDER/PERFORATED
TYPE INSTALLATION
Egypt L.L.C
Facility Management
Division
Page 2 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
CONTENTS
1
REFERENCE DOCUMENTS
PERSONS IN CHARGE
RESOURCES
Egypt L.L.C
Facility Management
Division
Page 3 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
Construction Manager
: Mr. .
3.2
Materials Co-ordinator
: Mr. ..
3.3
Mech. Supervisor
: Mr. ..
4.0 EQUIPMENT
The equipment used for the first phase of the installation is listed below:
No 1 Crane 25 Ton
No 1 Fork Lift 05 Ton
Egypt L.L.C
Facility Management
Division
Page 4 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
Ensure that proper materials are available and are approved for use, as well as
the approved drawings.
5.2
5.3
5.4
Install / erect proper scaffoldings and ladders where ever required during
erection / installation of supports and cable trays.
5.5
5.6
5.7
The cable trays and ladders shall be installed in such a way that, as often as
possible the cables can be laid directly in place rather than being pulled through.
5.8
5.9
Cable Trays & Ladders shall be supported adequately and fix bolt and clamps as
per specifications and drawings and applicable standards.
Egypt L.L.C
Facility Management
Division
Page 5 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
5.10
Sharp edges of trays & ladders shall be reamed to smooth and paint.
5.11
Touch up paint shall be applied to the scratches / damaged surface of cable trays
& Ladders.
5.12
5.13
5.14
5.15
Ensure that cable trays and ladders are erected correctly, inspected and approved
by Contractor/Engineer prior to cable laying.
5.16
Support Fabrication
The support will be prefabricated on the workshop of approved supplier using appropriate
approved material cutted according to the length show on the drawings and after that, the
bracket will be fixed with the anchor bolt to the channel.
5.17 Scaffolds
To reach the working places on the tunnel we will use the following procedures:
Using of mobile platforms on the straight part of the tunnel.
Utilize the mobile platform to work on the cable tray raising.
Using adequate scaffoldings were required.
Egypt L.L.C
Facility Management
Division
Page 6 of 7
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Hand Tools
Doc. No.
Issue No.:
Revision:
Date:
Egypt L.L.C
Facility Management
Division
Page 7 of 7
9.
METHOD STATEMENT
CABLE TRAY /.LADDER/
PERFORATED
TYPE INSTALLATION
Doc. No.
Issue No.:
Revision:
Date:
Items of personal use shall be inspected regularly and maintained in serviceable and sanitary
condition and before being given to another person or returned to storage they must be
cleaned, disinfected, inspected and repaired if damaged. Employees shall wear clothing
suitable for weather and work conditions.