Nothing Special   »   [go: up one dir, main page]

Cable Inspection Check List

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Upgrade of KJO’s Public Address &

General Alarm System

Contract: GT629IT19

Date:
INSPECTION CHECKLIST
DESCRIPTION: PAGA Cable Inspection

LOCATION: AREA:

DRAWING#: FROM STN# TO STN#:


PAGING STATION
CABLE TAG#:
MANUFACTURER:

INSPECTION ITEMS Results Remarks

1. Check length of the cable meter

2. Check Insulation Resistance of the


cable

3. Check Continuity of the cable Ok  Not ok 

4. Check the no. of Cable Core for Paging


16 Core  >16 Core  <16 Core 
Stations
5. Check the No. of Cable Core for
4 Core  >4 Core  < 4 Core 
Speaker
6. Check the flexible conduit installed
Yes  No 
with all required accessories

7. Check the Cable Tray Installed for ~Length


Yes  No 
cable laying

8. Check Conduit Installed for cable ~Length


Yes  No 
laying
~Length
9. Check Underground cable laying Yes  No 

10. Check Excavation Required for ~Length


Yes  No 
Underground Cable Laying
11. Check Scaffolding Required for New ~Height
Yes  No 
Cable Laying

Project Manager Name: Abdul Raheem - Survey Engineer Name:

Signature / Date Signature / Date

You might also like