Plumbing External Boq
Plumbing External Boq
Plumbing External Boq
DESCRIPTION
QTY. UNIT
1000 Cum.
Supplying, fixing and testing PVC pipes conforming to IS 13592 1992 (SWR Class B) with all fittings like shoes, bends fixed in the
pipe shafts on pipe racks.
a) 75mm dia
b) 110mm dia
c) 160mm dia
d) 200mm dia
e) 250mm dia
f) 300mm dia
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
20
35
90
130
70
300
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
a) 63mm dia
b) 75mm dia
c) 110mm dia
d) 160mm dia
e) 200mm dia
f) 250mm dia
g) 300mm dia
1500
190
3000
2000
800
140
110
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
2300
Kgs.
Supplying, fixing and testing PVC soil, waste , vent & rain water
pipe confirming to IS13592 : 1990, type B - 6 kg / sq.cm pressure
rated with rubber ring (confirming to IS 5382)with solvent joint
inclusive of all necessary specials like bends, tees, offsets,
doorbends, junctions, screw type caps with rubber rings for
cleanout pipe ends, etc., suspended under floor slabs/fixed on
walls or on pipe racks in shafts. All suspenders, saddles, pipe
packs are to be quoted separately under relevant items. ( Inclusive
of Shaft, Basement )
212.00
-
212,000.00
-
618.00
785.00
1,666.00
2,129.00
2,311.00
2,580.00
-
12,360.00
27,475.00
149,940.00
276,770.00
161,770.00
774,000.00
-
570.00
839.00
914.00
1,903.00
2,365.00
2,473.00
2,580.00
118.00
855,000.00
159,410.00
2,742,000.00
3,806,000.00
1,892,000.00
346,220.00
283,800.00
271,400.00
Page 1
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
Supplying and fixing of Leaf trap with khurra made out of UPVC
with flange and grating for rainwater outlets on terrace& balcony
including all necessary grounting with sealants to make it
absolutely water proof.
200mm dia
160mm dia
110mm dia
75mm dia
RO
10
25
5
Nos.
Nos.
Nos.
Nos.
109
Nos.
40
Nos.
63 mm dia
75mm dia
110 mm dia.
160 mm dia.
200 mm dia.
37
4
37
37
10
Nos
Nos
Nos
Nos
Nos
Supplying, fixing and testing salt glazed stoneware gully trap with
rebated top square bodies 150mm x 150mm, CI grating 100mm dia
outlet set in 75mm thick PCC 1:4:8 bed, 115mm thick masonry
chamber in CM 1:4, internal and external plastering 12mm thick in
CM 1:6, supply and fixing 300mm x 300mm size CI frame and
cover, jointing to drain in CM 1:1, excavating, refilling and ramming
etc., complete. also include for necessary excavation
11
Nos.
13
6
Page 2
3,763.00
3,010.00
2,580.00
1,828.00
-
30,100.00
64,500.00
9,140.00
-
860.00
-
93,740.00
-
1,043.00
-
41,720.00
-
215.00
785.00
296.00
484.00
731.00
4,300.00
7,955.00
3,140.00
10,952.00
17,908.00
7,310.00
47,300.00
450x450mm
600x600mm
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
-
Nos.
Nos.
17,738.00
21,178.00
-
230,594.00
127,068.00
-
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
Nos.
II
1
12
RO
TOTAL PART - I
EXTERNAL WATER SUPPLY SYSTEM
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
118,250.00
118,250.00
Nos.
Nos.
47,300.00
65,000.00
567,600.00
-
13,347,422.00
Supplying, fixing and testing inlet, outlet, vent and overflow pipes,
fittings with CI frame and cover to under ground water tank
complete with step irons as shown on the drawings etc., complete,
accessories comprising of the following :
UNDERGROUND SUMP
Approx. depth = 7.1 to 7.5Mts
i. 8nos. CI manhole frame & cover (heavy duty)(weight = 100 kgs)
i. 25 dia RO nos
ii. 40 dia RO nos
iii.50 dia 4 nos
iv.80 dia 14 nos
v. 100 dia 19 nos
vi. 150 dia 2 nos
vii.200 dia 2 nos
viii.250 dia RO nos
PVC rungs lot nos
complete all the Puddle flanges & details as given in the drawings
etc. complete for efficient maintenance of the tanks
Page 3
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
set
25 mm dia
32 mm dia
40 mm dia
50 mm dia
65 mm dia
80 mm dia
100 mm dia
240
510
460
330
40
20
1050
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
32 mm dia
40 mm dia
50 mm dia
65 mm dia
80 mm dia
100 mm dia
340
RO
RO
140
455
80
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
26
RO
36
4
RO
RO
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
15
20
20
Nos.
Nos.
Nos.
Page 4
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
3,225.00
3,225.00
-
366.00
457.00
548.00
785.00
1,847.00
1,994.00
2,989.00
-
87,840.00
233,070.00
252,080.00
259,050.00
73,880.00
39,880.00
3,138,450.00
-
421.00
516.00
683.00
887.00
4,500.00
6,125.00
-
143,140.00
124,180.00
2,047,500.00
490,000.00
-
3,440.00
5,160.00
7,041.00
8,815.00
12,470.00
19,350.00
###
-
89,440.00
253,476.00
35,260.00
-
968.00
1,720.00
2,204.00
14,520.00
34,400.00
44,080.00
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
RO
RO
8
1
RO
RO
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
RO
RO
Nos.
Nos.
Page 5
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
5,397.00
7,095.00
8,632.00
13,438.00
18,000.00
25,000.00
###
-
18,000.00
20,000.00
69,056.00
13,438.00
-
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
c) 80 mm dia
d) 100 mm dia
e) 150 mm dia
f) 200 mm dia
8
Supplying, fixing and testing inlet, outlet, vent and overflow pipes,
fittings with CI frame and cover to overhead water
tank(domestic-fire,flush,hvac) complete with step irons as shown
on the drawings etc., complete, accessories comprising of the
following.
8
1
RO
RO
Nos.
Nos.
Nos.
Nos.
sets
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
22,575.00
180,600.00
27,950.00
27,950.00
30,000.00
35,000.00
###
23,650.00
94,600.00
nos
322,500.00
161,250.00
nos
27,950.00
set
322,500.00
161,250.00
27,950.00
8,260,815.00
Page 6
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
11
3
nos
nos
30
Rmt
700
Page 7
Rmt
7,310.00
10,213.00
946.00
80,410.00
30,639.00
28,380.00
516.00
-
361,200.00
-
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
21
Nos
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
47,300.00
993,300.00
1,493,929.00
Page 8
EXTERNAL BOQ
PROJECT -SUCCESS TOWER
SUBJECT - BILL OF QUANTITIES FOR PLUMBING & SANITARY SYSTEM INSTALLATION WORKS
S.
No.
DESCRIPTION
QTY. UNIT
RATE
TOT. AMOUNT
SUPPLY + ERECTION SUPPLY+ERREC
Errecton
TION
0
0
0
550
Supplying,fixing and testing inlet, outlet, vent and over flow pipes,
fittings with steps and CI frame and cover to under ground
tank,storm water collection sump, and sump below pump room
etc.complete accessories comprising of the following:
I
II
III
IV
Rmt
4,300.00
-
set
set
0
2,365,000.00
-
860,000.00
-
860,000.00
-
322,500.00
322,500.00
3,547,500.00
SUMMARY
EXTERNAL SEWERAGE SYSTEM
EXTERNAL WATER SUPPLY SYSTEM
EXTERNAL STORM WATER DRAINAGE
BASEMENT STORM WATER SYSTEM
13,347,422.00
8,260,815.00
1,493,929.00
3,547,500.00
TOTAL
26,649,666.00
Page 9