JR Sharma
JR Sharma
JR Sharma
D r. J R Sharma
Project D irector, India-W RIS
Group D irector, W RG, N RSC, I SRO - H yderabad
General Manager, RRSC, N RSC, I SRO - Jodhpur
AIR MOISTURE
W G B
Water
resources
of India
(BCM / Cu KM)
4000
Interception &
Evaporation
Rainfall
2131
Transpiration
300
WW
1869
GW
Percolation
Ground Water
Surface
Runoff
BW
UT
1123
Infiltration
Soil Moisture
(Unsaturated Zone)
10812
11,100
cu Km
+
SW 690
GW
433
Seepage
Runoff
Quantity
BCM
Precipitation (%)
4000
100
2131
53.3
1869
46.7
1123
28.1
Surface water
690
17.3
Replenishable GW
433
10.8
Self - Regulating
Managed
Large Spatial variations of water availability and demand in space & time
IndiaWRIS
Thrust Areas
Basin wise water resources assessment
Groundwater Budgeting
Development of Decision support systems for
WR Management
Flood forecasting and flood inundation modeling
Real time Irrigation management
Irrigation infrastructure
Feasibility Assessment of
River link Projects
National Drinking Water Mission
Reservoir sedimentation
1975
Source -NRSC
1980
1985
1990
1995
2005
2007
2009
2010
Project:
W eb GIS
Generation of D atabase & I mplementation of
W eb Enabled W ater Resources I nformation
System I n the Country
Joint Project of CW C and I SRO
WR - Modeling
WR - Climate Change
W eb GI S
Water Security
Management, Planning & WR Development
9
Vision
India-WRIS to provide
Comprehensive, Authoritative & Consistent data
of Indias water resources along with allied
natural resources data & information;
Web enabled tools to Search, Access, Visualize,
Understand, Look into context
and Study spatial patterns.
Goal
Single Window
sol ut i on of al l wat er r esour ces and r el at ed dat a
IN A st andar di zed GIS f or mat i n nat i onal f r amewor k
FOR Wat er r esour ce assessment & moni t or i ng,
Wat er r esour ce pl anni ng and devel opment ,
Int egr at ed wat er r esour ces management &
Foundat i on f or model i ng
T Al l depar t ment s, or gani zat i ons and ot her st akehol der s.
o
10
Although water is a renewable resource, it is only renewable within limits
New
enhanced
Information
Reports
Tools
DSS
Project Phases
Phase 1
Phase 2
Inception
Phase
SC-W 4th meeting
February 15, 2006
A Group of Officers
report
January, 2007
Team of officers report
January 2008
Project scope & contents
Final proposal
submission
August 27, 2008
MOU signed
December 3, 2008
35
Planning
Phase
Organizational Arrangement
Project Secretariat
Review & refinement of
database components
Preparation of technical
guidelines
Project Procurements
Project website
12
Jan. 2009
Phase 3
Action
Implementation
Phase
Project Schedule &
Phasing of work
Approach to work
Group of States
Training, capacity build.
Database generation
& QAS
State workshops
24
Phase 4
Delivery
Phase
Public domain fast track
information system
Establishing and
operation of India-WRIS
National workshop
Documents delivery
36
48
Dec. 2012
12
Deliverables
1. Installation of Web enabled System with A. India-WRIS software
Data visualization tools, Query and discovery tools, Contextual tools,
Visual analysis tools, Metadata & information tools and Reporting tools
2. Basin-wise reports
3. Watershed atlas of the country
4. Infrastructure development at CWC
5. Capacity building
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
Real
Time
Database
Dynamic
Time series
datasets
Related
Thematic Database
Foundation Geo-database
Generation Administrative
Foundation Geo-database generation
Water resources
14
http://www.india-wris.nrsc.gov.in
15
http://www.india-wris.nrsc.gov.in/webgis.php
16
Training Document
17
Software / Technologies
2D
3D
Mobile
.NET(Windows) / Flex(Android) /
JAVA(Symbian)
Meta Data
Visual Basic
Data Generation
(Digital Image
Processing /
GIS Mapping)
Publishing / Web
Geodata Services
ArcGIS Server
Geodatabase /
Back end
19
WRIS Explorer
1. Geo-Visualization - 2 D
2. Sub Info Systems
3. WRIS Temporal Analysis
4. Geo-Visualization - 3 D
WRIS Connect
1. Tools
2. Publications
3. Query Interface 4. WRIS Wiki
5. Hydro Observations & AWS data
6. WRIS Mobile
7. WRIS Data Download
8. Report Generation 9. FAQ
Hydrological
Levels
Digits
Values
Basin
02
1 20 *
Sub basin
03
XYZ
Watersheds
02
1 - 99
Sub Watersheds
03
L 1 - 99
M 1 - 99
U 1 - 99
Micro
watersheds
02
1 - 99
01 xyz 99
Mahanadi Basin
L99 99
21
I.
II.
1
2
3
4
5
6
7
8
9
III.
10
11
12
IV.
13
14
15
SL. NO.
V.
16
17
VI.
18
VII.
19
VIII.
20
IX.
21
22
23
X.
24
25
26
27
XI.
28
XII.
29
30
Water Resources Raw Data Files & Formats from CWC & states
Hard copy
Excel
Word
JPEG/TIF
PPT
Shape files
Others
Total
Total
7477
4629
2726
17011
548
2144
39723
74258
2106
New inventory of
Water Resources assets
Base Documents
used
Soft copy
MALOR ASSETS
Attributes
Dam
49
Reservoir
25
59
55
14
21
NRLD
5100
5185+
Hydro-electric projects
1800
2700+
Hydro-electric projects
house
Barrages in India
72
450+
Canal
59
Hydroelectric Power
Stations in Operation
182*
1235+
Hydro-meteorological sites
204
Basin
22
River
12th five
Beyond
Total
Power
38
531
provides the users about the general information related to the project, vision, objectives,
schedule, progress of work , reduced scale maps of the completed works and gallery of events etc. The
project website will be slowly migrated towards the full web application envisaged in India-WRIS by linking
the appropriate servers.
The information system would have three categories of users and three types of
datasets:
All General users (public domain fast track system) - all users will be able to visit
web portal and get the snapshots of the outcome of the project on reduced scale of
selected database as approved by the committee.
CWC Intranet users for India - WRIS - These premier users will be able
to get the full access to the India-WRIS web application with database of all scales. All the
facilities envisaged in India-WRIS as per the user requirements will be accessible by these
users.
India-WRIS