SMEC's Experince in Water Sector
SMEC's Experince in Water Sector
SMEC's Experince in Water Sector
Project Scope
Evaluate wastewater generation and disposal Assess sanitation facilities and their impacts on environment Develop strategies for wastewater management Develop a master plan for planning horizon up to 2027 Contract value US$ 1.35m
Our Role
Assessment of flows and loads Review of national wastewater guidelines and design criteria Review of legislation on industrial effluent and trade waste Preparation of draft Wastewater and Sanitation Act Review of institutional framework Development of master plan and preparation of staged 25-year implementation schedule
Our Role
Design and bidding documents Topographic survey ands oil investigation Hydraulic modelling, hydraulic testing and survey Economic and financial analysis Environmental and social impact assessment Updating of engineering design Preparation of pre-qual and tender documents
Our Role
Review of contractors design , drawings and equipments Management of design programme Assessment of environmental and social impacts Monitoring of construction progress Quality control and assurance Review of contractors interim payment statements Management of testing and commissioning Assistance to client during defects and liability period
Our Role
Management of institutional development activities Oversight of implementation of financial management module Assistance in financial forecasting and budgeting Establishment of environmental management plans Provision of training and transfer of knowledge Assistance in management of the whole project procurement cycle
Our Role
Review of organisational arrangement of stakeholders and recommendation of institutional structures Preparation of resources inventories and GIS mapping Preparation of social/community development plans Development of integrated catchment management plans and implementation of monitoring programme Project management and reporting
Our Role
Hydrological studies and modeling Groundwater and conjunctive use studies and modeling River health and social/ environmental needs assessment Water quality studies and modeling Sector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc) Flood and irrigation studies Arusha future water supply study Integrated Water Resources Management Basin Plan Water Resources Information Management System Decision Support System Transboundary Water Management Climate change assessment Institutional and legal framework Capacity building and training
Our Role
Hydrological studies and modeling Groundwater and conjunctive use studies and modeling River health and social/ environmental needs assessment Water quality studies and modeling Sector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc) Lake Tanganyika Water Balance Assessment Integrated Water Resources Management Basin Plan Water Resources Information Management System Decision Support System Transboundary Water Management Climate change assessment Institutional and legal framework Capacity building and training
Our Role
Preparation of web-based GIS water supply asset maps Hydraulic modelling of all 222 towns water supply system Energy audit of 650 pump stations NRW assessment Conjunctive water use assessment including reuse of wastewater Develop time bound roadmap for meeting water demand in 2045
Phase 1: Data Collection and Mapping Phase 2: Hydraulic Modelling Phase 3: Preparation of Master Plan
Typical Project: Preparation of Basin Plans for Ghaghra Gomti System, Uttar Pradesh Developed Decision Support System
Modelling of current/future scenarios Stakeholder consultation
23000 22000
Kishanpur Mr.
21000 20000 19000 18000 17000 16000 15000 main canal desilting whole system desilting whole system lining
Bhuwalpur Mr.
Thank You