Method Statement For The Installation of The Additional Steel Beam (For Mep Hangers and Ceiling Networks) Along Roof Beam in Main Terminal Building
Method Statement For The Installation of The Additional Steel Beam (For Mep Hangers and Ceiling Networks) Along Roof Beam in Main Terminal Building
Method Statement For The Installation of The Additional Steel Beam (For Mep Hangers and Ceiling Networks) Along Roof Beam in Main Terminal Building
MEP HANGERS AND CEILING NETWORKS) ALONG ROOF BEAM IN MAIN TERMINAL
BUILDING.
1. Scope
This Method statement is prepared to describe the method for the installation of the additional steel beam (for
MEP hangers and ceiling network) in main terminal building.
This method upon approval will be applicable for all similar activities in future.
2. Reference document
Drawing Ref. No. SNO7O10/2 under Submittal Ref. # 2345/A
Specs. 5120
3. Man power
• Site engineer (1)
• Working Foreman(1)
Skilled Worker (6)
Helper (6)
4. EQUIPMENT
Electrical Drill with Complete Accessories.
Generator with Complete Accessories.
Scissors Jack Lefting Machine.
• Drill bit of correct diameter and length.
Air Compressor with Complete Accessories.
5. MATERIAL
Threaded Rod
Anchor Chemical (Hilti hit hy 150 # 338973)
IPE 120
Angular Steel Gusset Plate
Nuts and Washers
Angle Bar 40 x 40mm x 6.05m
Galvanized Hexa Bolts
5. PROCEDURE
Steps :
1. Clean and clear the area for installation.
3. Drill the holes by the electric drill with correct drill bit diameter and required depth in the concrete beam.
4. Clean the holes by air compressor in the concrete beam.
5. Submit RFIA for the approval to studi for the depth, diameter of the holes in the concrete beam.
6. Insert and fix the anchor bolts with the approved chemical(hilti hit-hy 150 #338973).
7. Installation of assembled steel bracket and fix it properly with nuts on the concrete beam.
8. Installation of steel beam with brackets,bolts, nuts, connecting assembled steel bracket and fix it properly.
10. Mark the location of the holes in steel beam in coordination to the angle bar on top with brackets,bolts and
nuts.
11. Make the holes in steel beam and angle bar coordinating its other with brackets by the electric drill of
required diameter.
12. Installation of angle bar on the steel beam and fix it properly with brackets,bolts and nuts.
7. Quality control
8. Safety