This document is a Certificate of Operation for machinery issued by a City/Municipality Building Official. It certifies that a mechanical inspection was conducted by a licensed professional mechanical engineer hired by the owner and the machinery installation was found to be in order. The certificate lists the owner/lessee's name and location, number of units, description, total horsepower, inspection and permit details. It authorizes operation of the machinery for one year from the inspection date and notes the owner must maintain the equipment safely and obtain permits for any changes.
This document is a Certificate of Operation for machinery issued by a City/Municipality Building Official. It certifies that a mechanical inspection was conducted by a licensed professional mechanical engineer hired by the owner and the machinery installation was found to be in order. The certificate lists the owner/lessee's name and location, number of units, description, total horsepower, inspection and permit details. It authorizes operation of the machinery for one year from the inspection date and notes the owner must maintain the equipment safely and obtain permits for any changes.
This document is a Certificate of Operation for machinery issued by a City/Municipality Building Official. It certifies that a mechanical inspection was conducted by a licensed professional mechanical engineer hired by the owner and the machinery installation was found to be in order. The certificate lists the owner/lessee's name and location, number of units, description, total horsepower, inspection and permit details. It authorizes operation of the machinery for one year from the inspection date and notes the owner must maintain the equipment safely and obtain permits for any changes.
This document is a Certificate of Operation for machinery issued by a City/Municipality Building Official. It certifies that a mechanical inspection was conducted by a licensed professional mechanical engineer hired by the owner and the machinery installation was found to be in order. The certificate lists the owner/lessee's name and location, number of units, description, total horsepower, inspection and permit details. It authorizes operation of the machinery for one year from the inspection date and notes the owner must maintain the equipment safely and obtain permits for any changes.
City/Municipality of _____________________ Certificate of Operation: Province of __________________________________
Machinery OFFICE OF THE BUILDING OFFICIAL
Name of Owner/Lessee Certificate of Operation:
Located at/along Machinery No. Fee Paid A certificate was submitted by _________________________________________ Official Receipt No. (Name) Date Paid a duly licensed professional mechanical engineer hired by the owner who undertook the mechanical inspection and that the installation is in Date Issued order. This Certificate of Operation: Machinery is issued/granted pursuant to pertinent Verified as to the following provision of the latest Philippine Mechanical Code, the National Building Code and its No. of Units Implementing Rules and Regulations. Description Total HP Name of Owner/Lessee
Verified on Located at/along
Expires on No. of Units
Inspection fee paid Description
Official Receipt No. Total HP
Date Issued The owner/lessee shall properly maintain the equipment/machineries to ensure its safe operation. The above described mechanical installation covered by Mechanical Permit No._______________ issued on___________________________ has been No change, addition or upgrading/alteration deviating from the original mechanical plans found substantially satisfactory complied, therefore the “Certificate shall be made without appropriate permit. of Operation: Machinery” is hereby recommended for issuance. The aforementioned Machinery may now be operated for a period of one (1) year from the date of inspection. The owner/lessee of the building/structure shall notify in writing the office of the Mechanical Inspector Chief, Mechanical Section (Signature Over Printed Name) (Signature Over Printed Name) building official for the granting/issuance of a Certificate of Operation: Machinery date________________________ date________________________ for a period of one (1) year from the date of issuance of this certificate and yearly thereafter. _________________ _______________ _________________ _______________ PRC Reg. No. vailidity PRC Reg. No. vailidity A certified copy hereof shall be posted within the premises of the building and shall not be removed without authority from the building official.
Chief, Chief, BUILDING OFFICIAL
(Signature Over Printed Name) Inspection and Enforcement Division Processing and Evaluation Division Date_______________________ (Signature Over Printed Name) (Signature Over Printed Name) Date________________________ Date________________________