Item 1 1.1 1.2 1.3 1.4 Mapa de Quantidades / Orçamento: 7,000Mtn 50,000Mtn 7,000Mtn 30,000Mtn
Item 1 1.1 1.2 1.3 1.4 Mapa de Quantidades / Orçamento: 7,000Mtn 50,000Mtn 7,000Mtn 30,000Mtn
Item 1 1.1 1.2 1.3 1.4 Mapa de Quantidades / Orçamento: 7,000Mtn 50,000Mtn 7,000Mtn 30,000Mtn
PROJECTO:
REFUNCIONALIZACAO
ACABAMENTOS DA
DA CAPELA
CAPELA DE SAO JOSE DE MUKHASSA
LOCALIZAÇÃO:
BEIRA CHIPANGARA
BEIRA-ESTURRO/MASSAMBA
DATA: 18/08/2020
18.04.2020
MAPA DE QUANTIDADES /
ORÇAMENTO
PREÇO
Item DESIGNAÇÃO UM Qty UNIT(MT)
1 Preliminares
Fornecimento e montagem de placa de
1.1 obra
vg 1.0 7,000Mtn
Sub Total 1
II Movimento de terras
Sub Total 2
Sub Total 3
Sub Total 4
Sub Total 5
Sub Total 6
Sub Total 6
VIII Caixilharia Em Madeira
Sub Total 7
IX Cobertura
Sub Total 9
9 Pintura
Sub Total 10
X Diversos
Sub Total 11
Total
Iva % 17.0
Imprevistos % 10.0
Custo Total da Obra
DONO DA OBRA: COMUNIDADE SAO TIAGO -MASSAMBA
FINANCIADOR: PAROQUIA SAO JOAO BAPTISTA DE MATACUANE
PROJECTO: CONSTRUÇÃO DE 4 SALAS DE AULAS E WC
LOCALIZAÇÃO: BEIRA-ESTURRO/MASSAMBA
DATA: 18.04.2020
1 Preliminares
1.1 Implantação
da obra incluindo montagem de
cangalhos e trabalhos complementares m² 244.80 175.00Mtn
Sub Total 1
2 Movimento de Terras
Sub Total 2
Alvenaria
Sub Total 3
Sub Total 4
Sub Total 5
6 Sistema Eléctrico
8 Cobertura
9 Pintura
Sub Total 11
Total
Iva % 17.00
Imprevistos % 10.00
Custo Total da Obra
TOTAL
42,840.00Mtn
42,840.00Mtn
6,394.50Mtn
17,810.00Mtn
101,972.00Mtn
126,176.50Mtn
114,960.80Mtn
247,197.60Mtn
42,000.00Mtn
404,158.40Mtn
62,615.00Mtn
152,065.00Mtn
167,271.50Mtn
171,360.00Mtn
381,888.00Mtn
20,808.00Mtn
35,492.00Mtn
131,955.00Mtn
1,123,454.50Mtn
183,813.60Mtn
142,697.40Mtn
82,875.00Mtn
29,760.00Mtn
439,146.00Mtn
85,000.00Mtn
85,000.00Mtn
66,500.00Mtn
86,794.40Mtn
5,320.00Mtn
65,000.00Mtn
45,000.00Mtn
55,700.00Mtn
324,314.40Mtn
269,433.00Mtn
252,450.00Mtn
9,045.00Mtn
530,928.00Mtn
166,383.00Mtn
136,136.60Mtn
59,760.00Mtn
362,279.60Mtn
18,550.00Mtn
18,550.00Mtn
4,312,089.80Mtn
733,055.27Mtn
504,514.51Mtn
5,549,659.57Mtn