JP2002041741A - Business process management system - Google Patents
Business process management systemInfo
- Publication number
- JP2002041741A JP2002041741A JP2000220481A JP2000220481A JP2002041741A JP 2002041741 A JP2002041741 A JP 2002041741A JP 2000220481 A JP2000220481 A JP 2000220481A JP 2000220481 A JP2000220481 A JP 2000220481A JP 2002041741 A JP2002041741 A JP 2002041741A
- Authority
- JP
- Japan
- Prior art keywords
- terminal device
- data
- side terminal
- applicant
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 187
- 230000008569 process Effects 0.000 title claims abstract description 95
- 230000005540 biological transmission Effects 0.000 claims description 26
- 238000012790 confirmation Methods 0.000 claims description 17
- 238000012946 outsourcing Methods 0.000 claims description 4
- 238000013479 data entry Methods 0.000 claims 1
- 238000012545 processing Methods 0.000 description 48
- 238000010586 diagram Methods 0.000 description 27
- 238000007726 management method Methods 0.000 description 27
- 238000004891 communication Methods 0.000 description 12
- 230000008859 change Effects 0.000 description 11
- 230000000694 effects Effects 0.000 description 6
- 230000036541 health Effects 0.000 description 4
- 230000001419 dependent effect Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000035606 childbirth Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】[0001]
【従来の技術】従来より、企業内においては、例えば、
ある社員の結婚、出産、住所変更、物品等の購入、とい
った事象の発生に伴って、あるいは定期的に行われる経
費精算や時間外勤務手当支給の申請といった事象の発生
の際に、当該社員は、自身が所属する企業及び様々な機
関に対して事務手続を行う必要が生じ、当該事象に関す
る諸条件に従って、所定の機関に対して所定の様式に基
づく申請書、届出書等の書類(以下、「申請書等」とい
う)に必要事項を記載し、署名・押印し提出する必要が
あった。2. Description of the Related Art Conventionally, in a company, for example,
In connection with the occurrence of an event such as marriage, childbirth, address change, purchase of goods, etc., of an employee, or when an event occurs such as periodic application for expense settlement or application for overtime pay, , It becomes necessary to carry out paperwork for the company to which the company belongs and various institutions, and in accordance with the conditions related to the event, documents such as application forms and notification forms (hereinafter referred to as “ "Application form, etc."), and required signing, sealing and submission.
【0002】例えば、ある企業内で社員(以下、「社員
A」という。)が文具を購入する場合の手続について考
えてみると、まず社員Aが購入についての申請を行うた
めに申請書等(購入申請書)を作成して所定の部署に提
出し、提出された申請書等が所定のルールに従って社内
を物理的に移動する。For example, consider a procedure in which an employee (hereinafter referred to as “employee A”) purchases stationery in a certain company. First, an employee A submits an application form or the like ( A purchase application form is created and submitted to a predetermined department, and the submitted application form physically moves within the company in accordance with predetermined rules.
【0003】具体的には、図33に示すように、申請書
等は、社員Aの上司或いは担当者等による承認、確認、
決裁等の各処理のために担当者等の手元に順次送られ、
各処理を終了したことを表す証拠としての押印や署名が
順次なされる。さらには、申請書等に記載の情報に基づ
いて、発注書や総括表等の新たな書類(以下、「発注書
等」という)が作成されることになる。[0003] More specifically, as shown in FIG.
It is sent sequentially to the person in charge, etc. for each processing such as decision making,
A seal or a signature as proof that each processing is completed is sequentially made. Further, new documents (hereinafter, referred to as “order sheets, etc.”) such as an order sheet and a summary table are created based on the information described in the application form.
【0004】この例では、社員Aが作成、提出した購入
申請書が課長Bに送られて承認の押印等がなされた後、
部長Cが同様の承認の手続を行い、さらにこの購入申請
書が総務課長Dに送られて決裁の押印等がなされ、続い
て総務課員Eによる発注書の作成がなされることにな
る。[0004] In this example, after a purchase application form created and submitted by employee A is sent to section manager B and approved for approval, etc.,
The manager C performs the same approval procedure, and the purchase application form is sent to the general affairs section manager D to seal the decision, and then the general affairs section member E prepares an order form.
【0005】次に、作成された発注書等が社員Aの所属
する企業(以下、「発注元企業」という。)から文具を
発注する企業(以下、「発注先企業」という。)へと物
理的に送付され、発注先企業は、この発注書等に記載の
情報に基づいて、社内手続のための受注票、発送指示
書、納品書などの新たな書類(以下、「受注書等」とい
う)を作成する。受注書等は、発注先企業等が定めたル
ールに従って社内を物理的に移動する。Next, the created order form is physically transferred from the company to which the employee A belongs (hereinafter, referred to as “ordering company”) to the company that orders stationery (hereinafter, referred to as “ordering company”). The ordering company sends new documents (hereinafter referred to as “order receipts, etc.”) such as order receipts, shipping instructions, and delivery notes for in-house procedures based on the information described in this order. ) To create. Orders and the like physically move within the company according to rules set by the ordering company.
【0006】具体的には、受注書等は、上述した発注元
企業内における手続の場合と同様に、担当者等による承
認等の各処理のために、発注先企業の担当者等の手元に
順次送られ、各処理を終了したことを表す証拠としての
押印や署名が順次なされる。[0008] Specifically, the order form is sent to the person in charge of the ordering company for each processing such as approval by the person in charge, similarly to the procedure in the ordering company described above. It is sent sequentially, and a seal or a signature is sequentially made as evidence that each processing is completed.
【0007】そして、受注が確定すると、発注先企業
は、納品書等の書類(以下、「納品書等」という)を添
付して、受注した文具を発注元企業の社員A宛に送付す
る。最後に、この社員Aが納品書等に署名・捺印して、
発注した物品を受取ったことを確認することで、申請か
ら納品確認に至る一連のプロセスが完了する。[0007] Then, when the order is confirmed, the ordering company sends the ordered stationery to the employee A of the ordering company with a document such as a delivery note (hereinafter referred to as a "delivery note") attached thereto. Finally, this employee A signs and seals the delivery note, etc.
By confirming that the ordered goods have been received, a series of processes from application to delivery confirmation are completed.
【0008】この例では、図33に示すように、発注元
企業から送付された発注書が発注先企業である文具販売
会社に届くと、受付担当者である社員Pにより受注票が
作成され、この受注票の記載事項に基づいて責任者とし
ての社員Qにより承認の手続(押印等)がなされ、次に
処理担当者である社員Rにより発送指示書が作成され、
この発送指示書の記載事項に基づいて、送付担当者であ
る社員Sにより、納品書が作成され、かつ、作成された
納品書が文具と共に発注元企業の社員A宛に送付される
ようになっている。In this example, as shown in FIG. 33, when the order sent from the ordering company reaches the stationery sales company, which is the ordering company, an order receipt is created by the employee P who is the receptionist. Based on the items described in the order slip, the employee Q as the responsible person performs an approval procedure (sealing, etc.), and then the employee R as the processing person prepares a shipping instruction,
A delivery note is created by the employee S who is the person in charge of delivery based on the items described in the shipping instruction, and the created delivery note is sent to the employee A of the ordering company together with the stationery. ing.
【0009】このように、従来より、各企業において
は、文具を購入する行為一つにしても、企業内のルール
に従った種々の手続を経て、さらには他の企業間との取
引や、当該他の企業内のルールに従った種々の手続を経
て行われているのが現状である。そして、いかなる企業
内においても、或いはいかなる企業間の取引において
も、様々な様式の申請書等、発注書等、受注書等、納品
書等の紙の書類が用いられ、個別の様式や個別の処理方
法により、当該紙の書類が企業内或いは企業間を移動し
て行く、という一連の処理が行われていた。[0009] As described above, conventionally, in each company, even if a single act of purchasing stationery is carried out through various procedures in accordance with the rules of the company, furthermore, transactions with other companies, At present, it is performed through various procedures according to the rules of the other companies. And, in any company or any transaction between companies, paper documents such as application forms in various forms, purchase orders, order receipts, delivery notes, etc. are used, and individual forms and individual forms are used. Depending on the processing method, a series of processings in which the paper document moves within a company or between companies has been performed.
【0010】従来は、申請から受領確認に至る一連の処
理(以下、ビジネスプロセスという。)を完結させるた
めに、上述のように複数の書類を用いて行っていた。こ
れら複数の書類は、それぞれ同様の内容(上述の例では
「社員Aによる文具の購入」)に関するものであるが、
発注元企業内の決裁のために使用される書類(申請書
等)、発注元企業から発注先企業への企業間契約と情報
伝達のために使用される書類(発注書等)、発注先企業
内の決裁のために使用される書類(受注書等)、発注先
企業から発注元企業への企業間契約と情報伝達のために
使用される書類(納品書等)等の目的の相違により、そ
れぞれの目的に応じて、様式を変更したり、データの抽
出(取捨選択等)が行われたり、データの並べ順の変更
等が行われていた。そして、従来より、このデータの抽
出や並べ順の変更等の作業は、多くの企業において、人
手で行われてきた。Conventionally, in order to complete a series of processes from application to receipt confirmation (hereinafter referred to as a business process), a plurality of documents have been used as described above. These documents relate to the same contents (“purchase stationery by employee A” in the above example).
Documents used for approval in the ordering company (applications, etc.), documents used for inter-company contracts and information transmission from the ordering company to the ordering company (ordering documents, etc.), ordering companies Due to differences in purposes such as documents used for approval within the company (order receipts, etc.), documents (delivery notes, etc.) used for communication between companies and information transmission from the ordering company to the ordering company, For each purpose, the format was changed, data was extracted (selected, etc.), and the order of data was changed. Conventionally, such operations as extracting data and changing the order of arrangement have been performed manually in many companies.
【0011】[0011]
【発明が解決しようとする課題】本発明者は、上述した
一連の手続全体をサイクル(閉じたループ)として捉
え、分析し見直すことを思い立った。SUMMARY OF THE INVENTION The inventor of the present invention has conceived that the whole series of procedures described above is regarded as a cycle (closed loop), analyzed, and reviewed.
【0012】上述した図33及び図32を参照して、本
発明の概要を説明する。ここでは、社員Aが文具を購買
する場合において、社内及び社外で行われる一連の処理
を例として説明し、図33には本発明者の分析結果を示
し、図32に本発明の概要を示している。An outline of the present invention will be described with reference to FIGS. 33 and 32 described above. Here, when employee A purchases stationery, a series of processes performed inside and outside the company will be described as an example. FIG. 33 shows an analysis result of the present inventor, and FIG. 32 shows an outline of the present invention. ing.
【0013】一般に、一社員(社員A)が会社の経費で
物を購入する場合には、当該社員が予め申請書を作成
し、当該社員の上司に当たる者(例えば課長B)が社員
Aの申請書について承認するか否かについての権限を有
しており、さらには、課長Bの上司に当たる者(例えば
部長C)が課長Bの承認した社員Aの申請書についての
決裁権を有し、さらに、総務課長Dが決裁した社員Aの
申請書に基づいて、総務課員Eが文具販売会社に発注す
るための発注書を作成して、この発注書を当該文具販売
会社に提出する、といった処理が行われることになる。In general, when one employee (employee A) purchases a product at the expense of the company, the employee prepares an application in advance, and a person who is a supervisor of the employee (for example, section manager B) applies for the application of employee A. Has authority over whether or not to approve the document, and furthermore, a person who is the supervisor of section manager B (for example, section manager C) has the right to approve the application form of employee A approved by section manager B, The general affairs section employee E creates an order form for ordering the stationery sales company based on the application form of the employee A, which is approved by the general affairs section manager D, and submits the order form to the stationery sales company. Will be done.
【0014】そして、この発注書を受領した文具販売会
社では、受付担当の者(社員P)が受注票を作成し、社
員Pの上司にあたる責任者Qがこの受注票について承認
するか否かについての権限を有しており、さらに、責任
者Qが承認した場合には、処理担当者Rが該当する商品
(文具)を集め、続いて送付担当者Sが納品書を作成し
て、当該文具を納品書とともに発注元企業の社員A宛に
発送する。At the stationery sales company that has received the order form, the person in charge of reception (employee P) prepares an order slip, and the manager Q who is the supervisor of employee P decides whether or not to approve the order slip. In addition, if the person in charge Q approves, the person in charge of processing R collects the corresponding goods (stationery), and then the person in charge S creates a delivery note, and To the employee A of the ordering company together with the delivery note.
【0015】そして、元企業の社員Aは、この文具及び
納品書を受領することにより、商品の納品を確認する。[0015] The employee A of the former company confirms the delivery of the product by receiving the stationery and the delivery note.
【0016】すなわち、購買のみならず、およそ企業等
の法人格を有する組織体の構成員(以下、社員等とい
う。)が行うすべてのビジネス手続は、社員等の申請や
届け出等の意思表示を発端としてビジネスプロセスが開
始され、当該社員等がなんらかの結果を受領又は確認す
ることで終了すると考えられ、いかなるビジネスプロセ
スであっても、図32に示すように、一連の手続全体を
サイクル(閉じたループ)として捉えることが可能であ
る、と考えることができる。That is, not only purchasing but also all business procedures performed by members of an organization having a legal personality such as a company (hereinafter referred to as employees, etc.) start with an intention to indicate an application or notification of an employee, etc. It is considered that the business process is started and the employee or the like ends by receiving or confirming some result. Regardless of the business process, as shown in FIG. 32, the entire series of procedures is cycled (closed loop). ) Can be considered.
【0017】他の例を挙げれば、例えばある企業の社員
が家族構成の変更に伴って被扶養者の変更を申請した場
合には、複数の組織体(例えば申請者の在籍する企業と
健康保険組合の間)間での種々の処理を経て、被扶養者
の変更が反映された健康保険証がその社員の手元に届く
ことで、ビジネスプロセスは終了する。さらに他の例で
は、ある社員が経費精算を申請した場合には、複数の企
業間での種々の処理を経て、申請した金額が銀行に振り
込まれた旨の通知をその社員が受領することで、ビジネ
スプロセスは終了する。従って、このような申請におい
ては、「発注元企業」と「発注先企業」という購買に限
定した区分ではなく、「依頼元企業」と「依頼先企業」
という捉え方をしている。上記の家族構成変更の例では
依頼先企業は健康保険組合となるし、経費精算の例で
は、依頼先企業は経理作業のアウトソーシング会社とい
うことになる。As another example, when an employee of a certain company applies for a change of a dependent according to a change in family structure, a plurality of organizations (for example, a company in which the applicant is enrolled and a health insurance The business process ends when the health insurance card reflecting the change of the dependent arrives at the employee's hand through various processes between the unions. In yet another example, when an employee applies for expense reimbursement, the employee receives a notification that the requested amount has been transferred to the bank through various processes between multiple companies. , The business process ends. Therefore, in such an application, the ordering company and the ordering company are not classified only for the purchase, but the requesting company and the requesting company.
I think that. In the example of the family structure change described above, the requested company is a health insurance union, and in the example of expense settlement, the requested company is an outsourcing company for accounting work.
【0018】従来は、ビジネスプロセスが紙の申請書
等、発注書等、受注書等、納品書等を用いていたこと
で、企業の生産性向上を一定のレベルに押し留めてい
た。すなわち、申請書等を社内で物理的に移動させるこ
とは、移動のための時間あるいは工数がかかり、常に紛
失の可能性が存在し、また、どの処理までを終了したの
かを確認するのには人手をかけてその申請書等を探して
回るしかなかった。Conventionally, business processes use paper application forms, purchase orders, order receipts, delivery notes, and the like, thereby limiting the productivity of a company to a certain level. In other words, physically moving the application form inside the company takes time or man-hours to move, there is always the possibility of loss, and it is necessary to check which process has been completed. We had no choice but to go around looking for the application form.
【0019】また、申請書等は、一般には、依頼先企業
には提出することができず、申請書等に記載の情報をも
とに依頼先企業に提出するための発注書等を新たに作り
直さなければならないことも、企業の生産性向上を阻害
する要因となっていた。In general, an application form cannot be submitted to a requesting company, but a new order form to be submitted to the requesting company based on the information described in the application form or the like. The need to rework was also a factor that hindered corporate productivity improvement.
【0020】すなわち、発注書等に記載される情報は申
請書等に記載の情報から導き出されるものであるが、社
内向けと社外向けで様式が異なったり、明細に記載の情
報の順番が異なったり、情報を抽出する基準が異なる等
の理由により、申請書等から発注書等を作り直す必要が
生じていた。That is, although the information described in the order form is derived from the information described in the application form, the format differs between the company and the outside, or the order of the information described in the specification differs. For example, there is a need to re-create an order form from an application or the like because of different criteria for extracting information.
【0021】例えば、別個の依頼先企業と購入契約を結
んでいる文具とコンピュータ関連機器の購入申請が、同
じ購入申請書に記載されて申請され承認された場合を考
えてみると、従来は、購買業務に責任をもつ総務課等の
担当者は、新たに文具とコンピュータ関連機器を発注す
るための、2枚の発注書を新たに作成し、別個の依頼先
企業に送付しなければならなかった。すなわち、記載さ
れている情報が同じであっても、様式と情報の抽出の基
準が異なるため、新たな工数が発生した。For example, consider a case where a purchase application for stationery and computer-related equipment that has a purchase contract with a separate client company is described and approved in the same purchase application form. Persons in charge of purchasing, such as the General Affairs Division, must create two new purchase orders for ordering stationery and computer-related equipment, and send them to separate client companies. Was. In other words, even if the described information is the same, a new man-hour is generated because the format and the criteria for extracting the information are different.
【0022】また、コンピュータ関連機器の発注書を受
取った依頼先企業は、自らの業務を実行するために受注
書等を作成し、受注の確認から商品の発送までのビジネ
スプロセスの一部を管理する。さらには、発送するコン
ピュータ関連機器には新たに作成された納品書が添付さ
れ、依頼元企業の申請者に送付される。ここでもまた、
書類の作成に新たな工数が発生する。そして、最後に該
申請者が納品書等に署名・捺印して納品を受領すること
で、一連のビジネスプロセスが終了するが、依頼元企業
には該申請書等と該納品書等が対応していることを付け
合せるという工数が発生した。また、依頼元企業内〜企
業間〜依頼先企業内〜企業間〜依頼元企業内といったそ
れぞれの段階で、購入申請書〜発注書〜受注票〜発送指
示書〜納品書といった別々の書類が作成されるため、そ
れぞれの段階で処理が一旦途切れていた。In addition, the client company that has received the purchase order for the computer-related equipment prepares an order receipt and the like to execute its own business, and manages a part of the business process from confirmation of the order to shipment of the product. I do. Further, the newly-prepared delivery note is attached to the computer-related equipment to be sent and sent to the applicant of the requesting company. Again,
New man-hours are required to create documents. Finally, when the applicant signs and seals the delivery note and receives the delivery, a series of business processes is completed, but the application company and the delivery note correspond to the requesting company. There was a man-hour to make sure that things were done. In addition, separate documents such as a purchase application form, an order form, an order form, an order form, a shipping instruction form, and a delivery note are created at each stage such as within the requesting company, between the companies, within the requested company, between the companies, and within the requesting company. Therefore, the processing was temporarily interrupted at each stage.
【0023】これに対して、近年のコンピュータ技術の
発達により、ビジネスプロセスのうちの一部の作業、例
えば、依頼元企業内において複数の申請書等に記載され
たデータを1枚の発注書等にまとめて記載する作業を行
うような場合には、様式の変更、データの抽出、データ
の並べ順の変更等の作業をコンピュータ(端末装置)を
用いてデータベースに登録しながら行うことが盛んにな
りつつある。On the other hand, due to the recent development of computer technology, a part of the business process, for example, the data described in a plurality of applications in the requesting company can be converted into one order form or the like. In the case of performing work to collectively write in a database, work such as changing the format, extracting data, and changing the arrangement order of data is frequently performed while registering the work in a database using a computer (terminal device). It is becoming.
【0024】しかしながら、従来は、申請から納品確認
まで、複数の企業にまたがる一連のビジネスプロセスの
全体を統合して管理することはできなかったし、そのよ
うな発想さえなかった。However, conventionally, it has not been possible to integrate and manage a whole series of business processes spanning a plurality of companies, from application to delivery confirmation, and there has been no such idea.
【0025】本発明の目的は、複数の企業にまたがる一
連のビジネスプロセスの全体を統合し、申請から受領確
認に至る一連の処理を必要とするあらゆる種類の申請書
等を管理することが可能なビジネスプロセス管理システ
ムを提供することにある。An object of the present invention is to integrate a whole series of business processes spanning a plurality of companies and manage all kinds of application forms and the like which require a series of processing from application to receipt confirmation. It is to provide a business process management system.
【0026】[0026]
【課題を解決するための手段】本発明に係るビジネスプ
ロセス管理システムの第1の構成は、申請者による申請
事項に関して、当該申請事項について手続を行う複数の
企業内の複数の権限者による各手続を経て、当該申請事
項についての最終結果が申請者に受領されるまでの各手
続についての進行状態を、データベースを管理するサー
バ側端末装置と、申請者及び権限者により操作され、サ
ーバ側端末装置に対するデータの送受信が可能なクライ
アント側端末装置とを用いて管理するビジネスプロセス
管理システムであり、クライアント側端末装置は、申請
者の所属する企業の構成員によって使用される少なくと
も1の依頼元端末装置と、申請者の申請の依頼先となる
企業の構成員によって使用される少なくとも1の依頼先
端末装置とからなり、サーバ側端末装置は、申請者から
の申請事項についての入力データを受信すると、当該入
力データ及びデータベースのデータに基づいて、申請事
項についての最終結果が申請者に受領されるまでの手続
を行う全ての権限者及び当該権限者の手続順序を規定し
た権限一覧表と権限一覧表に規定された権限者による手
続の進行状態について示す進行状態表とを含む権限デー
タベースを作成して記憶するとともに、次の手続を行う
権限者宛に手続を行うべき旨の通知を送信し、かつ、次
の手続を行う権限者からの手続完了の旨のデータを受信
する度に、権限データベースを更新するとともに、さら
に次の手続を行う順番の権限者宛に手続を行うべき旨の
通知を送信することを繰り返し、申請事項についての最
終結果を示すデータを受信すると、申請者宛に当該最終
結果についての通知を送信し、申請者から当該最終結果
についての確認信号を受信すると、処理を終了すること
を特徴とする。According to a first aspect of the business process management system according to the present invention, with respect to an application by an applicant, each procedure is performed by a plurality of authorized persons in a plurality of companies which perform procedures for the application. The server-side terminal device that manages the database and the server-side terminal device that is operated by the applicant and the authorized person to monitor the progress status of each procedure until the final result of the application matter is received by the applicant through A business process management system for managing using a client-side terminal device capable of transmitting and receiving data to and from a client-side terminal device, wherein the client-side terminal device is at least one requesting terminal device used by a member of a company to which the applicant belongs. And at least one requesting terminal device used by a member of the company to which the applicant requests the application. Upon receiving the input data on the application matter from the applicant, the server-side terminal device performs a procedure until the final result on the application matter is received by the applicant based on the input data and the data in the database. Create and store an authority database that includes an authority list that specifies all the authorized persons and the order of the procedures of the authorized persons, and a progress table that indicates the progress of the procedures by the authorized persons specified in the authority list, Each time a notification to the effect that the procedure should be performed is sent to the authority performing the next procedure, and whenever data indicating the completion of the procedure is received from the authority performing the next procedure, the authority database is updated, Repeatedly sending a notice to the next authority in the order to perform the procedure, and receiving data indicating the final result of the application, Send a notification of the final result destined seekers, upon receiving the confirmation signal for the final results from the applicant, is characterized in that the process ends.
【0027】本発明に係るビジネスプロセス管理システ
ムの第2の構成は、第1の構成において、サーバ側端末
装置は、次の手続を行う権限者からの手続完了の旨のデ
ータを受信する度に、当該手続が完了した旨を進行状態
表に記載して権限データベースを更新することを特徴と
する。According to a second configuration of the business process management system according to the present invention, in the first configuration, each time the server-side terminal device receives data indicating the completion of the procedure from an authorized person who performs the next procedure. And updating the authority database by writing the fact that the procedure is completed in the progress status table.
【0028】本発明に係るビジネスプロセス管理システ
ムの第3の構成は、第1又は第2の構成において、サー
バ側端末装置は、申請者による申請内容に応じた権限者
の選定ルールについてのデータを予め格納し、入力デー
タを受信すると、選定ルールに基づいて権限者を選定す
ることを特徴とする。According to a third configuration of the business process management system according to the present invention, in the first or second configuration, the server-side terminal device stores data on a rule for selecting an authorized person according to the content of the application by the applicant. It is stored in advance and, upon receipt of input data, an authorized person is selected based on a selection rule.
【0029】本発明に係るビジネスプロセス管理システ
ムの第4の構成は、第1乃至第3のいずれか1の構成に
おいて、権限データベースには、企業に関する情報及び
各作業者に関する情報が記載されることを特徴とする。According to a fourth configuration of the business process management system according to the present invention, in any one of the first to third configurations, information on a company and information on each worker are described in an authority database. It is characterized by.
【0030】本発明に係るビジネスプロセス管理システ
ムの第5の構成は、第1乃至第4のいずれか1の構成に
おいて、進行状態表には、申請及び各手続の日時が記載
されることを特徴とする。A fifth configuration of the business process management system according to the present invention is characterized in that, in any one of the first to fourth configurations, the progress status table describes the date and time of the application and each procedure. And
【0031】本発明に係るビジネスプロセス管理システ
ムの第6の構成は、第1乃至第5のいずれか1の構成に
おいて、サーバ側端末装置は、権限者のうちのいずれか
からの、申請を否認する旨の申請否認データを受信する
と、進行状態表の記載を所定の更新前の状態まで戻すと
ともに、その旨を申請者宛に通知することを特徴とす
る。A sixth aspect of the business process management system according to the present invention is the business process management system according to any one of the first to fifth aspects, wherein the server-side terminal device rejects an application from any of the authorized persons. Upon receiving the application rejection data indicating that the request is to be made, the description of the progress status table is returned to the state before the update, and the fact is notified to the applicant.
【0032】本発明に係るビジネスプロセス管理システ
ムの第7の構成は、第1乃至第5のいずれか1の構成に
おいて、サーバ側端末装置は、いずれかの権限者から
の、申請を一部否認する旨の申請一部否認データを受信
すると、その旨を、進行状態表に記載して申請者宛に通
知するとともに、申請一部否認データに応じて入力デー
タを変更することを特徴とする。In a seventh aspect of the business process management system according to the present invention, in any one of the first to fifth aspects, the server-side terminal device partially denies an application from any authorized person. Upon receipt of the application partial rejection data to the effect that the request is to be made, this is described in the progress status table and notified to the applicant, and the input data is changed according to the application partial rejection data.
【0033】本発明に係るビジネスプロセス管理システ
ムの第8の構成は、第1乃至第7のいずれか1の構成に
おいて、サーバ側端末装置は、権限データベースの作成
後には、申請者からの権限データベースのデータ送信を
要求する旨の送信要求データを受信すると、当該権限デ
ータベースのデータを当該申請者宛に送信することを特
徴とする。An eighth configuration of the business process management system according to the present invention is the business process management system according to any one of the first to seventh configurations, wherein the server-side terminal device further comprises: When the transmission request data for requesting the data transmission is received, the data of the authority database is transmitted to the applicant.
【0034】本発明に係るビジネスプロセス管理システ
ムの第9の構成は、第1乃至第8のいずれか1の構成に
おいて、サーバ側端末装置は、申請者からの申請事項に
ついての入力データを受信するに先立って、入力データ
を入力するための雛型についてのデータを申請者宛に送
信することを特徴とする。In a ninth configuration of the business process management system according to the present invention, in any one of the first to eighth configurations, the server-side terminal device receives input data on an application matter from the applicant. Prior to this, data on a template for inputting input data is transmitted to the applicant.
【0035】本発明に係るビジネスプロセス管理システ
ムの第10の構成は、第1乃至第9のいずれか1の構成
において、サーバ側端末装置は、権限データベースを更
新する度に、当該権限データベースのデータを申請者宛
に送信することを特徴とする。According to a tenth configuration of the business process management system according to the present invention, in any one of the first to ninth configurations, each time the server-side terminal device updates the authority database, Is transmitted to the applicant.
【0036】本発明に係るビジネスプロセス管理システ
ムの第11の構成は、第1乃至第10のいずれか1の構
成において、サーバ側端末装置は、入力データ又は手続
完了の旨のデータの受信に先立って、申請者又は権限者
となりうる者についての認証を行うことを特徴とする。According to an eleventh configuration of the business process management system according to the present invention, in any one of the first to tenth configurations, the server-side terminal device receives the input data or the data indicating the completion of the procedure before receiving the data. Authentication of those who can become applicants or authorized persons.
【0037】本発明に係るビジネスプロセス管理システ
ムの第12の構成は、第8の構成において、サーバ側端
末装置は、権限データベースのデータを申請者宛に送信
するに先立って、申請者についての認証を行うことを特
徴とする。According to a twelfth configuration of the business process management system according to the present invention, in the eighth configuration, the server-side terminal device authenticates the applicant before transmitting the data of the authority database to the applicant. Is performed.
【0038】本発明に係るビジネスプロセス管理システ
ムの第13の構成は、第11又は第12の構成におい
て、サーバ側端末装置は、申請者又は権限者となりうる
者についての認証情報を予め格納し、データ入力者につ
いての認証データを受信すると、受信した認証データと
予め格納した認証情報とを照合することにより、申請者
又は権限者となりうる者についての認証を行うことを特
徴とする。According to a thirteenth configuration of the business process management system according to the present invention, in the eleventh or twelfth configuration, the server-side terminal device stores in advance authentication information of an applicant or a person who can be an authorized person, Upon receiving the authentication data of the data input person, the received authentication data is collated with pre-stored authentication information to perform authentication of a person who can be an applicant or an authorized person.
【0039】本発明に係るビジネスプロセス管理システ
ムの第14の構成は、第1乃至第13のいずれか1の構
成において、クライアント側端末装置は、サーバ側端末
装置とデータの送受信を行う送受信手段と、送受信手段
でサーバ側端末装置に送信するデータを入力する操作入
力手段と、送受信手段で受信したサーバ側端末装置から
のデータを表示する表示手段とを備えたことを特徴とす
る。A fourteenth configuration of the business process management system according to the present invention is the business process management system according to any one of the first to thirteenth configurations, wherein the client-side terminal device includes a transmitting / receiving means for transmitting / receiving data to / from the server-side terminal device. An operation input unit for inputting data to be transmitted to the server terminal device by the transmission / reception unit; and a display unit for displaying data from the server terminal device received by the transmission / reception unit.
【0040】本発明に係るビジネスプロセス管理システ
ムの第15の構成は、第1乃至第14のいずれか1の構
成において、サーバ側端末装置は、各企業間のビジネス
プロセスを管理するアウトソーシング企業内に配置され
たことを特徴とする。According to a fifteenth configuration of the business process management system according to the present invention, in any one of the first to fourteenth configurations, the server-side terminal device is located in an outsourcing company that manages business processes between the companies. It is characterized by being arranged.
【0041】本発明に係るビジネスプロセス管理システ
ムの第16の構成は、第1乃至第15のいずれか1の構
成において、クライアント側端末装置は、移動体携帯端
末装置であることを特徴とする。A sixteenth configuration of the business process management system according to the present invention is characterized in that, in any one of the first to fifteenth configurations, the client-side terminal device is a mobile portable terminal device.
【0042】[0042]
【発明の実施の形態】本発明の実施の形態を、図面を参
照しながら詳細に説明する。Embodiments of the present invention will be described in detail with reference to the drawings.
【0043】図1は、本発明を適用したビジネスプロセ
ス管理システムの全体構成を説明する図である。実施の
形態のビジネスプロセス管理システムは、図1に示すよ
うに、データベースの管理を行うサーバ側の端末装置1
と、依頼元企業の端末装置2(2A,2B,2C,2
D,・・2n)及び依頼先企業の端末装置3(3A,3
B,3C,3D,・・3n)とが、インターネット等の
通信網4を介して接続され、データの送受信を行うよう
になっている。FIG. 1 is a diagram for explaining the overall configuration of a business process management system to which the present invention is applied. As shown in FIG. 1, a business process management system according to an embodiment includes a server-side terminal device 1 that manages a database.
And the terminal device 2 (2A, 2B, 2C, 2) of the requesting company.
D,... 2n) and the terminal device 3 (3A, 3
B, 3C, 3D,... 3n) are connected via a communication network 4 such as the Internet to transmit and receive data.
【0044】サーバ側の端末装置1は、この実施の形態
では、各企業間のビジネスプロセスを管理する外部会社
(アウトソーシング企業)内に配置される。このサーバ
側の端末装置1の詳細については後述する。In this embodiment, the terminal device 1 on the server side is arranged in an external company (outsourcing company) that manages business processes between companies. Details of the terminal device 1 on the server side will be described later.
【0045】依頼元企業の端末装置2は、申請者の所属
する企業の構成員によって使用される端末装置を言う。
この実施の形態では、例えば、端末装置2Aを社員A
(申請者)の机上にある専用の装置とし、端末装置2B
を社員Aの上司である課長Bの机上にある専用の装置と
し、端末装置2Cを課長Bの上司である部長Dの机上に
ある専用の装置とし・・・と言った具合に、各端末装置
が個人専用に使用されるようになっている。なお、本発
明は、これに限定されるものではなく、1つの端末装置
を複数人で共有使用することも可能である。また、端末
装置2A〜2nについて、複数の企業に配置されていて
も良い。The terminal device 2 of the requesting company is a terminal device used by members of the company to which the applicant belongs.
In this embodiment, for example, the terminal device 2A is connected to the employee A
The terminal device 2B is a dedicated device on the (applicant) desk.
Is a dedicated device on the desk of section manager B, the manager of employee A, and terminal device 2C is a dedicated device on the desk of manager D, manager of section manager B. Are for personal use only. Note that the present invention is not limited to this, and one terminal device can be shared and used by a plurality of persons. Further, the terminal devices 2A to 2n may be arranged in a plurality of companies.
【0046】依頼先企業の端末装置3は、申請者の申請
の依頼先となる企業の構成員によって使用される端末装
置を言う。この実施の形態では、依頼先企業の端末装置
3についても上述した依頼元企業の端末装置2と同様
に、各端末装置が個人専用に使用されるようになってい
るが、これに限定されるものではなく、1つの端末装置
をある企業内の複数の担当者で共有使用することも可能
である。また、この実施の形態では、端末装置3A(3
A1〜3An)を文具販売会社が使用する装置とし、端末
装置3B(3B1〜3Bn)をパソコン販売会社が使用す
る装置とし、端末装置3C(3C1〜3Cn)を教育会社
が使用する装置とし、・・・と言った具合に、端末装置
3については、複数の依頼先企業に配置されるものとす
る。The terminal device 3 of the requested company refers to a terminal device used by a member of the company to which the applicant requests the application. In this embodiment, as with the terminal device 2 of the requesting company, each terminal device is used exclusively for the individual, as in the terminal device 2 of the requesting company described above. However, the present invention is not limited to this. Instead, one terminal device may be shared by a plurality of persons in a company. In this embodiment, the terminal device 3A (3
And A 1 ~3A n) the stationery sales company will use equipment, the terminal apparatus 3B (3B 1 ~3B n) to a personal computer sales company will use equipment, the terminal device 3C (3C 1 ~3C n) the education company Assuming that the terminal device 3 is to be used, the terminal device 3 is arranged at a plurality of request destination companies.
【0047】なお、「依頼元企業」と「依頼先企業」と
いう呼び方は相対的なものであり、例えば上述の例で
は、文具販売会社の社員が申請者になる場合もある。Note that the terms "requester company" and "requestee company" are relative. For example, in the above example, an employee of a stationery sales company may be the applicant.
【0048】以下は、説明の便宜のため、サーバ側の端
末装置を「サーバ側端末装置」と称し、依頼元企業の端
末装置を「依頼元端末装置」と称し、依頼先企業の端末
装置を「依頼先端末装置」と称し、さらに、これら双方
を含めた概念として、前記サーバ側端末装置1と対比し
て「クライアント側端末装置」と称する。ここで、各ク
ライアント側端末装置については、例えば携帯電話等の
機能を有する移動型携帯端末装置であっても良い。Hereinafter, for convenience of explanation, the terminal device on the server side is referred to as “server side terminal device”, the terminal device of the requesting company is referred to as “requesting terminal device”, and the terminal device of the requesting company is referred to as “terminal device of requesting company”. It is referred to as a "requested terminal device", and as a concept including both of them, is referred to as a "client-side terminal device" in comparison with the server-side terminal device 1. Here, each client-side terminal device may be a mobile portable terminal device having a function such as a mobile phone.
【0049】通信網4は、インターネットやイントラネ
ット等による有線の回線網であるが、無線を介する構成
としても良い。The communication network 4 is a wired network such as the Internet or an intranet, but may be configured to be wireless.
【0050】(サーバ側端末装置の構成)図2は、サー
バ側端末装置1の構成を説明する図である。サーバ側端
末装置1は、図2に示すように、この端末装置全体の制
御を行う制御部11と、データベースが格納されたハー
ドディスクドライブ等からなる外部記憶部12と、モデ
ム等からなる送受信部13と、CRT或いは液晶ディス
プレイ等からなる表示部14と、キーボードやマウス等
による操作入力部15とを備えている。(Configuration of Server-Side Terminal Device) FIG. 2 is a diagram for explaining the configuration of the server-side terminal device 1. As shown in FIG. 2, the server-side terminal device 1 includes a control unit 11 for controlling the entire terminal device, an external storage unit 12 including a hard disk drive or the like in which a database is stored, and a transmission / reception unit 13 including a modem or the like. And a display unit 14 such as a CRT or a liquid crystal display, and an operation input unit 15 such as a keyboard and a mouse.
【0051】サーバ側端末装置1の制御部11は、処理
プログラムに基づいて、各部の制御を行う。この制御内
容については後述する。The control section 11 of the server-side terminal device 1 controls each section based on the processing program. The details of this control will be described later.
【0052】データベースが格納された外部記憶部12
は、制御部11からの制御信号に基づいて、データベー
スのデータについての新規登録、検索、読み出し、削
除、追加、書き換え等のデータ処理を行うようになって
いる。外部記憶部12から読み出されたデータベースの
データは、表示部14に表示される。External storage unit 12 storing a database
Performs data processing such as new registration, retrieval, reading, deletion, addition, and rewriting of data in the database based on a control signal from the control unit 11. The data of the database read from the external storage unit 12 is displayed on the display unit 14.
【0053】ここで、外部記憶部12に格納されたデー
タベースには、依頼元企業及び依頼先企業についての各
種データが登録されている。データベースに登録される
データとしては、例えば、依頼元企業についてのデータ
として、各依頼元企業を識別するための依頼元企業識別
データ、登録された各依頼元企業における構成員(社
員)を識別及び認証するための認証情報であるID及び
パスワードのデータ、各依頼元企業内における各構成員
間の上下関係について規定したデータなどが、外部記憶
部12の所定の記憶領域に格納されている。Here, in the database stored in the external storage unit 12, various data on the requesting company and the requested company are registered. As the data registered in the database, for example, as data on the requesting company, requesting company identification data for identifying each requesting company, identification of members (employees) in each registered requesting company, and Data of ID and password, which are authentication information for authentication, data defining the hierarchical relationship between members in each requesting company, and the like are stored in a predetermined storage area of the external storage unit 12.
【0054】同様に、依頼先企業についてのデータとし
ては、各依頼先企業を識別するための依頼先企業識別デ
ータ、登録された各依頼先企業における構成員(社員)
を識別及び認証するための認証情報であるID及びパス
ワードのデータ、各依頼先企業内における各構成員間の
上下関係について規定したデータなどが、外部記憶部1
2の所定の記憶領域に格納されている。Similarly, as the data on the requested company, the requested company identification data for identifying each requested company, the members (employees) of each registered requested company.
ID and password data, which are authentication information for identifying and authenticating, and data defining the hierarchical relationship between members in each requested company are stored in the external storage unit 1.
2 are stored in two predetermined storage areas.
【0055】また、外部記憶部12には、クライアント
側端末装置から送信される前記認証情報に基づいて、ク
ライアント側端末装置のデータ入力者(以下、作業者と
呼ぶ。)についての認証を行うための認証プログラム、
詳細を後述する権限データベースの作成を行う権限デー
タベース作成プログラム、作成した権限データベースの
更新、管理等を行う権限データベース管理プログラム、
などが格納されている。The external storage unit 12 authenticates a data input person (hereinafter, referred to as an operator) of the client-side terminal device based on the authentication information transmitted from the client-side terminal device. Certification program,
An authority database creation program for creating an authority database, which will be described in detail later, an authority database management program for updating and managing the created authority database,
Are stored.
【0056】ここで、権限データベース作成プログラム
には、申請者が属する依頼元企業の権限者の選定、申請
者が属しない依頼先企業及びその権限者の選定、さらに
は各権限者の手続順序を決定するためのプログラムが含
まれる。Here, the authority database creation program includes selection of the authority of the requesting company to which the applicant belongs, selection of the requested company to which the applicant does not belong, and the authority thereof, and furthermore, the order of the procedures of each authority. A program for making decisions is included.
【0057】また、権限データベース管理プログラムに
は、各権限者宛に手続を行うべき旨の通知を送信するた
めのプログラムや、依頼元端末装置2又は依頼先端末装
置3から送られてきた各種データを受信して各種処理を
行うためのプログラムが含まれる。The authority database management program includes a program for transmitting a notice to the effect that the procedure should be performed to each authority, and various data transmitted from the request source terminal device 2 or the request destination terminal device 3. And a program for performing various kinds of processing upon receipt of the program.
【0058】さらに、外部記憶部12には、作業者によ
って入力されるデータの項目名(例えば、申請者、購入
品目、費用発生日、金額など)、項目属性(例えば、文
字列型、日付型、通貨型など)、項目値(例えば平成1
2年3月7日、3000円、承認又は却下の別など)に
ついて規定するデータ、入力画面のフォーマットについ
てのデータ、申請文書の雛型の画面のフォーマットにつ
いてのデータ、等が格納されている。Further, in the external storage unit 12, item names (for example, applicant, purchased item, cost incurred date, amount of money, etc.) and item attributes (for example, character string type, date type) , Currency type, etc.), item values (for example, Heisei 1
Data on the format of the input screen, data on the format of the application document template, and the like are stored.
【0059】これら各種のプログラムやデータ等は、必
要に応じて制御部11により読み出され、処理実行さ
れ、さらには適宜依頼元端末装置2又は依頼先端末装置
3に送信される。These various programs, data, and the like are read out by the control unit 11 as necessary, processed, and further transmitted to the request source terminal device 2 or the request destination terminal device 3 as appropriate.
【0060】送受信部13は、通信網4を介して依頼元
端末装置2又は依頼先端末装置3(クライアント側端末
装置)から送られてきたデータを受信する。ここで、ク
ライアント側端末装置から送られるデータとしては、作
業者の前記認証情報(IDとパスワード)についてのデ
ータ、作業者の作業内容(申請又は承認等、データベー
スの閲覧など)についてのデータ、サーバ側端末装置1
に対する各種コマンドなどがある。The transmission / reception unit 13 receives data transmitted from the request source terminal device 2 or the request destination terminal device 3 (client terminal device) via the communication network 4. Here, data sent from the client-side terminal device include data on the authentication information (ID and password) of the worker, data on the work contents of the worker (application or approval, database browsing, etc.), server Terminal device 1
There are various commands for.
【0061】サーバ側端末装置1では、クライアント側
端末装置から送られてきたこれら各種データが送受信部
13で受信されると、当該データに基づいて制御部11
が外部記憶部12を制御して、外部記憶部12に格納さ
れたデータベースのデータについての所定処理を行う。In the server side terminal device 1, when these various data sent from the client side terminal device are received by the transmission / reception unit 13, the control unit 11 based on the data.
Controls the external storage unit 12 to perform a predetermined process on the data of the database stored in the external storage unit 12.
【0062】また、サーバ側端末装置1では、制御部1
1によってデータベースから読み出されたデータ或いは
制御部11で処理されたデータが、送受信部13及び通
信網4を介してクライアント側端末装置に送信される。In the server-side terminal device 1, the control unit 1
1, the data read from the database or the data processed by the control unit 11 is transmitted to the client-side terminal device via the transmission / reception unit 13 and the communication network 4.
【0063】(サーバ側端末装置が行う処理の概要)以
下、図3のフローチャート及び図4を参照して、クライ
アント側端末装置から送られてきた各種データに基づい
てサーバ側端末装置1の制御部11が行う一連の処理の
概要について説明する。(Outline of Processing Performed by Server-Side Terminal) Hereinafter, with reference to the flowchart of FIG. 3 and FIG. 4, the control unit of the server-side terminal 1 will be described based on various data sent from the client-side terminal. An outline of a series of processes performed by 11 will be described.
【0064】サーバ側端末装置1の制御部11は、クラ
イアント側端末装置から送られてきた初期入力者(申請
者)の認証情報(IDとパスワード)についてのデータ
に基づいて、ステップS1で、前記認証プログラムを実
行して、当該申請者についての認証を行う。The control unit 11 of the server-side terminal device 1 determines in step S1 based on the data on the authentication information (ID and password) of the initial input person (applicant) sent from the client-side terminal device. Execute the authentication program to authenticate the applicant.
【0065】ここでは、制御部11が外部記憶部12の
データベースを検索して、当該ID及びパスワードがデ
ータベースに登録されているか否かについての判定及び
照合を行うことで、正規なユーザか否かの認証が行われ
る。そして、制御部11は、正規なユーザと認めた場合
のみ、ステップS2以下の処理を行うようにする。Here, the control unit 11 searches the database of the external storage unit 12 and determines and checks whether or not the ID and the password are registered in the database. Authentication is performed. Then, the control unit 11 performs the processing of step S2 and subsequent steps only when the user is recognized as a legitimate user.
【0066】次に、制御部11は、クライアント側端末
装置から送られてきた申請者の申請事項についての入力
データを、外部記憶部12に格納する(ステップS
2)。なお、この入力データについては、図13〜図1
5等を参照して後述する。Next, the control unit 11 stores the input data of the applicant's application sent from the client-side terminal device in the external storage unit 12 (Step S).
2). This input data is shown in FIGS.
5 will be described later.
【0067】そして、制御部11は、クライアント側端
末装置から送られてきた各データに基づいて、前記権限
データベース作成プログラムを実行して、当該申請者が
属する依頼元企業の権限者の選定(ステップS3)及び
依頼先企業及びその権限者の選定(ステップS4)の処
理を行い、これら各選定結果に基づく権限データベース
を作成し(ステップS5)、作成した権限データベース
を外部記憶部12に格納する。Then, the control unit 11 executes the authority database creation program based on each data sent from the client side terminal device, and selects an authority of the requesting company to which the applicant belongs (step (1)). The process of S3) and the selection of the requested company and its authorized person (Step S4) are performed, an authority database based on the results of these selections is created (Step S5), and the created authority database is stored in the external storage unit 12.
【0068】ここで、作成される権限データベースの例
としては、例えば図4に示すように、申請者についての
表と、権限一覧表と、進行状態表を有するものとする。
そして、申請者についての表には、「企業」欄、「作業
者」欄、「作業文書」欄、「作業内容」欄、「作業日
付」欄が設けられる。また、権限一覧表には「企業」
欄、「作業者」欄、「作業文書」欄、「作業内容」欄が
設けられ、進行状態表には「作業日付」欄が設けられ
る。Here, as an example of the created authority database, for example, as shown in FIG. 4, it is assumed that the database includes a table of applicants, an authority list, and a progress status table.
The table for the applicant has a “company” column, a “worker” column, a “work document” column, a “work content” column, and a “work date” column. In addition, "Authority" is listed in the authority list
Column, a “worker” column, a “work document” column, and a “work content” column, and a “work date” column is provided in the progress status table.
【0069】この実施の形態では、各表の「企業」欄に
は、依頼元企業又は依頼先企業の別及び当該企業の名称
が記載される。なお、権限データベース作成プログラム
の実行にあたっては、複数の依頼先企業を選定するよう
にしても良いことは勿論である。In this embodiment, the "company" column of each table describes the requesting company or the requested company and the name of the company. In executing the authority database creation program, a plurality of request destination companies may of course be selected.
【0070】各表の「作業者」欄には、企業欄に記載さ
れた当該企業の構成員(社員)についての名前や役職等
が記載され、この実施の形態では、作業を行う順に上か
ら記載されていく。In the "Worker" column of each table, the names and positions of the members (employees) of the company described in the company column are described. In this embodiment, the work is performed in order from the top. Will be described.
【0071】各表の「作業文書」欄には、初期入力者
(申請者)の申請事項についての種別(例えば、購買申
請、経費精算申請、住所等の変更の届出などの別)が記
載される。In the “work document” column of each table, the type of application for the initial input person (applicant) (for example, a purchase application, an expense settlement application, a notification of a change in address, etc.) is described. You.
【0072】各表の「作業内容」欄には、作業者欄に記
載された当該作業者についての作業内容(例えば申請、
承認、決裁、発送、納品確認、など)が記載される。In the “work content” column of each table, the work content (for example, application,
Approval, approval, shipping, delivery confirmation, etc.).
【0073】各表の「作業日付」欄には、作業者による
作業(入力作業)が行われた場合に、当該作業について
の日付が記載される。In the “work date” column of each table, when a work (input work) is performed by a worker, the date of the work is described.
【0074】制御部11は、権限データベースの作成に
あたっては、申請者についての表の各欄に対する登録
(記載)を行い、当該申請者の申請に対する権限者を選
出して権限一覧表の各欄に対する記載を行い、進行状態
表については空白状態としておく。When creating the authority database, the control unit 11 registers (lists) the applicant in each column of the table, selects an authorized person for the applicant's application, and registers the authority in each column of the authority list. Make a description and leave the progress status table blank.
【0075】なお、作成される権限データベースの権限
一覧表について、一般には、申請者の申請内容に応じ
て、権限者の構成や数が異なることになる。例えば、申
請者の申請内容が文具の購入であるか、固定資産の購入
であるか、社外セミナーの受講であるか、健康保険証へ
の扶養家族追加であるか、等によって当該申請を担当す
る課や依頼先企業が変わることから、これに応じて権限
者の構成や数が変わることになる。In the authority list of the created authority database, the configuration and number of authorized persons generally differ depending on the content of the application by the applicant. For example, the applicant is responsible for the application depending on whether the application is for the purchase of stationery, the purchase of fixed assets, the attendance of an external seminar, the addition of a dependent to a health insurance card, etc. Since the section and the client company change, the composition and number of authorized persons change accordingly.
【0076】続いて、サーバ側端末装置1の制御部11
は、前記権限データベース管理プログラムを実行して、
次の手続順序の権限者宛に手続を行うべき旨の通知を送
信する(ステップS6)。具体的には、権限一覧表の最
上段に記載された権限者宛に、申請者の申請事項と、当
該申請事項に対する承認等の手続(権限行為)が可能な
状態である旨を通知する。Subsequently, the control unit 11 of the server-side terminal device 1
Executes the authority database management program,
A notification to the effect that the procedure should be performed is transmitted to the authority in the next procedure order (step S6). Specifically, it notifies the authorized person listed at the top of the authority list that the applicant's application items are in a state in which procedures (authoritative acts) such as approval for the application items are possible.
【0077】さらに、制御部11は、次の手続順序の権
限者からの手続完了の旨のデータをクライアント側端末
装置から受信する度に、当該データに基づいて進行状態
表の作業日付欄への記載を行って権限データベースを更
新するとともに、さらに次の手続順序の権限者宛に手続
を行うべき旨の通知を送信することを繰り返し(ステッ
プS7)、申請事項についての最終結果を示すデータを
受信すると、申請者宛に当該最終結果についての通知を
送信し(ステップS8)、申請者から当該最終結果につ
いての確認信号を受信すると、処理を終了する。Further, each time the control unit 11 receives data indicating the completion of the procedure from the authorized person in the next procedure order from the client-side terminal device, the control unit 11 stores the data in the work date column of the progress status table based on the data. The authority database is updated by making the description, and the notification that the procedure should be performed to the authority in the next procedure order is repeatedly transmitted (step S7), and the data indicating the final result of the application matter is received. Then, a notification about the final result is transmitted to the applicant (step S8), and when the confirmation signal about the final result is received from the applicant, the process ends.
【0078】ここで、権限データベースを更新する際に
は、次の手続順序の権限者からの手続完了の旨のデータ
をクライアント側端末装置から受信する度に、当該手続
が完了した旨を前記進行状態表に記載することとし、こ
の実施の形態では、後述のように、少なくとも各手続の
日時が記載されることで当該手続が完了したことを示し
ている。Here, when updating the authority database, every time data indicating that the procedure has been completed is received from the client-side terminal device from the authority in the next procedure order, the fact that the procedure has been completed is notified. In this embodiment, the state table is described, and as described later, at least the date and time of each procedure is described to indicate that the procedure has been completed.
【0079】なお、サーバ側端末装置1は、権限データ
ベースを作成した後は、当該権限データベースの作業者
欄に記載された者に、その要求に応じて権限データベー
ス及び申請者による入力データの内容の閲覧を認めるよ
うにする。これにより、申請者本人及び各権限者が手続
の進行状況や申請者の申請内容について随時知ることが
可能となり、また、無関係な者による当該権限データベ
ースや申請者の申請内容の閲覧が禁止されて、秘密性が
保持される。さらに、当該権限データベースの作業者欄
に記載された作業者については、作業をする時期が来な
い間は当該権限データベース及び申請者による入力デー
タの内容の閲覧ができないようにする。After the server-side terminal device 1 has created the authority database, the server-side terminal device 1 sends the authority database and the contents of the input data by the applicant to the person described in the operator column of the authority database in response to the request. Allow browsing. As a result, the applicant and each authorized person can know the progress of the procedure and the contents of the applicant's application at any time, and prohibition of unrelated persons from viewing the authority database and the applicant's application contents. , Confidentiality is maintained. Further, the workers listed in the worker column of the authority database are prevented from browsing the contents of the authority database and the input data by the applicant before the time to work comes.
【0080】さらにまた、サーバ側端末装置1は、権限
データベースを作成した後には、申請者本人宛にこの権
限データベースの内容を例えばeメールの形式で通知す
ることとしても良い。これにより、申請者本人が当該シ
ステムに直接アクセスしない場合でも、各権限者の数等
について知ることが可能となる。Further, after the server-side terminal device 1 has created the authority database, the server-side terminal device 1 may notify the content of the authority database to the applicant in the form of e-mail, for example. As a result, even when the applicant does not directly access the system, it is possible to know the number of each authorized person.
【0081】(クライアント側端末装置)図5は、クラ
イアント側端末装置の構成を説明するブロック図であ
る。なお、図5には依頼元端末装置2Aのみの構成につ
いて示しているが、他の依頼元端末装置2B等及び依頼
先端末装置3(3A,3B,・・・3n)についてはこ
れと同様の構成であり、説明を省略する。(Client-side Terminal Device) FIG. 5 is a block diagram for explaining the configuration of the client-side terminal device. Although FIG. 5 shows only the configuration of the request source terminal device 2A, other request source terminal devices 2B and the like and the request destination terminal devices 3 (3A, 3B,... 3n) have the same configuration. This is a configuration, and the description is omitted.
【0082】クライアント側端末装置は、図5に示すよ
うに、この端末装置全体の制御を行う制御部21と、ハ
ードディスクドライブ等からなる外部記憶部22と、モ
デム等からなる送受信部23と、CRT或いは液晶ディ
スプレイ等からなる表示部24と、キーボードやマウス
等による操作入力部25とを備えている。なお、制御部
21につき、サーバ側端末装置1の制御部11と区別す
るため、以下の説明ではCPU21と呼ぶ。As shown in FIG. 5, the client side terminal device includes a control unit 21 for controlling the entire terminal device, an external storage unit 22 such as a hard disk drive, a transmitting / receiving unit 23 such as a modem, and a CRT. Alternatively, a display unit 24 including a liquid crystal display or the like and an operation input unit 25 such as a keyboard and a mouse are provided. Note that the control unit 21 is referred to as a CPU 21 in the following description to distinguish it from the control unit 11 of the server-side terminal device 1.
【0083】クライアント側端末装置では、所定のOS
(operating system)や、インターネット等の通信網4
と接続してデータ通信を行うためのプログラム等が外部
記憶部22に格納され、これをCPU21が読み出して
実行する。In the client terminal device, a predetermined OS
(Operating system) or communication network 4 such as the Internet
A program or the like for performing data communication by connecting to the PC is stored in the external storage unit 22, and the CPU 21 reads and executes the program.
【0084】送受信部23は、通信網4を介してサーバ
側端末装置1から送られてきたデータを受信する。受信
されたデータは、CPU21に入力される。また、送受
信部23は、操作入力部25の操作に基づいてCPU2
1から出力されたデータを、通信網4を介してサーバ側
端末装置1に送信する。The transmission / reception unit 23 receives data transmitted from the server terminal 1 via the communication network 4. The received data is input to the CPU 21. Further, the transmission / reception unit 23 is configured to execute the CPU 2 based on the operation of the operation input unit 25.
1 is transmitted to the server side terminal device 1 via the communication network 4.
【0085】表示部24は、サーバ側端末装置1に各種
データを送信するための画面や、サーバ側端末装置1か
ら送信された各種データについての画面を表示する。こ
こで、表示部24に表示される画面には、例えばサーバ
側端末装置1との接続を図るための初期入力画面(図1
1)、作業者の行おうとする作業についての選択を行う
ための作業選択画面(図12)、申請者が行う申請内容
のデータを入力するための申請書の雛形を表示した申請
データ入力画面(図13)などがある。なお、表示部2
4に表示される各種画面の詳細については後述する。The display unit 24 displays a screen for transmitting various data to the server-side terminal device 1 and a screen for various data transmitted from the server-side terminal device 1. Here, the screen displayed on the display unit 24 includes, for example, an initial input screen (FIG. 1) for establishing a connection with the server-side terminal device 1.
1), an operation selection screen (FIG. 12) for selecting an operation to be performed by an operator, and an application data input screen (a template of an application form for inputting data of application contents to be performed by the applicant) ( FIG. 13). The display unit 2
Details of the various screens displayed in 4 will be described later.
【0086】操作入力部25は、キー入力やマウスクリ
ック等により、サーバ側端末装置1に送信する各種デー
タについての入力操作を行うものである。The operation input section 25 performs an input operation for various data to be transmitted to the server-side terminal device 1 by key input, mouse click, or the like.
【0087】(クライアント側端末装置で行われる処理
の概要)以下、図6乃至図18を参照して、クライアン
ト側端末装置を用いて行う作業者の操作、及び、クライ
アント側端末装置の表示部24に表示される画面等につ
いて説明する。(Outline of Processing Performed by Client-Side Terminal Device) Hereinafter, with reference to FIGS. 6 to 18, an operation performed by the worker using the client-side terminal device and the display unit 24 of the client-side terminal device will be described. Will be described.
【0088】ここで、図6乃至図10は、クライアント
側端末装置の操作入力部25の操作により行われるデー
タ入力操作や、クライアント側端末装置によるデータ送
受信処理等について説明するフローチャートであり、図
11乃至図18は、クライアント側端末装置の表示部2
4に表示される各種画面について示す図である。FIGS. 6 to 10 are flowcharts for explaining a data input operation performed by operating the operation input unit 25 of the client-side terminal device, a data transmission / reception process by the client-side terminal device, and the like. To FIG. 18 show the display unit 2 of the client-side terminal device.
FIG. 4 is a diagram showing various screens displayed in FIG.
【0089】クライアント側端末装置では、まず、ステ
ップS11で、インターネットの所定のアドレス(サイ
ト)にアクセスして、ビジネスプロセス管理システム
(以下、単にシステムという。)に接続する。システム
に接続すると、表示部24に作業者の認証情報(IDと
パスワード)の入力を求める初期入力画面が表示され、
図11に示すように、この初期入力画面にIDとパスワ
ードを入力して不図示のOKボタンをマウスクリックす
る又は不図示のリターンキーを押すことにより、これら
の情報が認証データとしてサーバ側端末装置1に送信さ
れる(ステップS12)。First, in step S11, the client terminal accesses a predetermined address (site) on the Internet and connects to a business process management system (hereinafter simply referred to as a system). When connected to the system, an initial input screen for inputting the authentication information (ID and password) of the worker is displayed on the display unit 24,
As shown in FIG. 11, by inputting an ID and a password on this initial input screen and clicking an OK button (not shown) with a mouse or pressing a return key (not shown), these information are used as authentication data as server-side terminal devices. 1 (step S12).
【0090】次に、上述したサーバ側端末装置1の認証
処理(ステップS1)により正規のユーザと認められる
と、当該作業者のクライアント側端末装置には、図12
に示すような作業選択画面が表示される。この実施の形
態では、図12に示すように、作業選択画面として、画
面右側に申請書の雛形についての情報が表示され、画面
左側に当該作業者の作業状況についての情報が表示され
る。Next, when the server-side terminal device 1 is recognized as a legitimate user by the authentication process (step S1), the worker-side client-side terminal device shown in FIG.
Is displayed as shown in FIG. In this embodiment, as shown in FIG. 12, as a work selection screen, information on a template of an application is displayed on the right side of the screen, and information on the work status of the worker is displayed on the left side of the screen.
【0091】ここで、作業選択画面における当該作業者
の作業状況についての情報としては、図12に示すよう
に、当該作業者が作成途中である「作成中の申請書」に
ついての項目及びその件数と、他の作業者により作成及
び提出されて当該作業者が権限者として作業しなければ
ならない「処理待の申請書」の項目及びその件数と、当
該作業者が既に作成及び提出した申請書についてのその
後の状況を確認するための「提出済の申請書」の項目及
びその件数が表示される。As shown in FIG. 12, the information on the work status of the worker on the work selection screen includes, as shown in FIG. And the number and number of “Applications pending processing” that must be prepared and submitted by another worker and that worker must work as an authorized person, and the applications that the worker has already created and submitted The items of the “Submitted Application Form” and the number of cases are displayed to confirm the subsequent situation.
【0092】また、この例では、申請書の雛形について
の情報として、会社の人事部に提出する申請書に関する
「人事申請一覧」の項目と、会社の総務部に提出する申
請書に関する「総務申請一覧」の項目と、会社の経理部
に提出する申請書に関する「経理申請一覧」の項目が表
示される。In this example, as the information on the template of the application form, the item of “list of personnel application” concerning the application form to be submitted to the human resources department of the company and the “general application "List" and "Accounting application list" related to the application to be submitted to the accounting department of the company are displayed.
【0093】そして、作業者は、この作業選択画面に表
示されたいずれかの項目をマウスクリックすることで、
いずれかの作業を行うよう選択する(ステップS1
3)。ここで、作業の選択枝としては、申請書の新規
作成を行う場合(図7のステップS21乃至ステップS
23)と、作成中の申請書の更新を行う場合(図8の
ステップS31乃至ステップS33)と、処理待ちの
申請書の処理を行う場合(図9のステップS41乃至ス
テップS43)と、提出済の申請書の状況確認を行う
場合(図10のステップS51乃至ステップS52)
と、がある。The operator clicks any item displayed on this work selection screen with the mouse,
Select to perform any of the operations (Step S1)
3). Here, as an option of the operation, a case where a new application form is created (steps S21 to S21 in FIG. 7)
23), when updating the application form being created (steps S31 to S33 in FIG. 8), when processing an application waiting for processing (steps S41 to S43 in FIG. 9), To check the status of the application form (steps S51 to S52 in FIG. 10)
There is.
【0094】(申請書の新規作成を行う場合)まず、
申請書の新規作成を行う場合の図7のステップS21
乃至ステップS23の処理について説明する。(When creating a new application form)
Step S21 in FIG. 7 when creating a new application form
The processing from step S23 to step S23 will be described.
【0095】クライアント側端末装置(依頼元端末装置
2)では、ステップS21で、図12に示す作業選択画
面右側の申請書の雛型についてのいずれかの項目がマウ
スクリックされると、当該項目に関する申請書の雛型が
表示部24に表示され、当該雛型にデータを入力できる
状態となる。In the client-side terminal device (request source terminal device 2), in step S21, when any item of the application form template on the right side of the work selection screen shown in FIG. The template of the application form is displayed on the display unit 24, and data can be input to the template.
【0096】ここでは、「総務申請一覧」の「文具購
買」をマウスクリックして、総務部に提出すべき申請書
として購買申請書の雛型をステップS21で選択した場
合について説明する。この場合には、表示部24の表示
が、図12の作業選択画面から、図13に示すような購
買申請書の雛型の画面表示に切り替わる。そして、この
画面に表示された入力データの各欄に図14のように必
要なデータを入力し、保存ボタン24aをマウスクリッ
クして一時保存する(ステップS22)か、或いは、提
出ボタン24bをマウスクリックして上司である課長へ
の提出処理を行う(ステップS23)ことにより、当該
クライアント側端末装置での操作が終了する。Here, a case will be described in which “stationery purchase” in the “general affairs application list” is clicked with the mouse and a purchase application template is selected in step S21 as an application to be submitted to the general affairs department. In this case, the display of the display unit 24 is switched from the work selection screen of FIG. 12 to a screen display of a purchase application form template as shown in FIG. Then, input necessary data as shown in FIG. 14 in each field of the input data displayed on this screen, and temporarily save by clicking the save button 24a with the mouse (step S22), or click the submit button 24b with the mouse. By clicking and submitting to the manager (section S23), the operation on the client side terminal device ends.
【0097】このとき、一時保存の場合には当該入力デ
ータがクライアント側端末装置の外部記憶部22あるい
はサーバ側端末装置の外部記憶部12に保存され、提出
処理の場合には当該入力データがサーバ側端末装置1に
送信されることになる。そして、図3で説明したよう
に、当該入力データに基づいて、サーバ側端末装置1に
より依頼元企業の権限者の選定(ステップS3)及び依
頼先企業及びその権限者の選定(ステップS4)が行わ
れ、さらに、これら各選定結果に基づく権限データベー
スが作成される(ステップS5)ことになる。At this time, in the case of temporary storage, the input data is stored in the external storage unit 22 of the client side terminal device or the external storage unit 12 of the server side terminal device. This is transmitted to the side terminal device 1. Then, as described with reference to FIG. 3, based on the input data, the server-side terminal device 1 selects the authorized person of the requesting company (Step S3) and the requested company and the authorized person (Step S4). Then, an authority database based on each of these selection results is created (step S5).
【0098】(作成中の申請書の更新を行う場合)次
に、作成中の申請書の更新を行う場合の図8のステッ
プS31乃至ステップS33の処理について説明する。(When Updating an Application Form Under Creation) Next, the processing of steps S31 to S33 in FIG. 8 when updating an application form under creation will be described.
【0099】クライアント側端末装置(依頼元端末装置
2)では、ステップS31で図12に示す作業選択画面
の「作成中の申請書」をクリックすると、当該作業者が
作成途中で保存した申請書(この例では3件)について
の選択画面(図示せず)となり、この選択画面でいずれ
の申請書について作成するかを選択すると、クライアン
ト側端末装置の外部記憶部22またはサーバ側端末装置
の外部記憶部12から該当するデータが読み出されて、
表示部24が例えば図14と同様の画面になり、各欄へ
の必要なデータの入力が可能な状態となる。そして、作
業者は、例えば図15のようにデータを追加入力して、
上述と同様に、保存の場合には外部記憶部22または外
部記憶部12に保存され(ステップS32)、提出処理
の場合には当該入力データがサーバ側端末装置1に送信
される(ステップS33)ことになる。この後にサーバ
側端末装置1が行う処理についてはステップS3乃至ス
テップS5で上述した通りである。In the client-side terminal device (request source terminal device 2), in step S31, when the user clicks on “application being created” on the work selection screen shown in FIG. In this example, a selection screen (not shown) for three cases is displayed. When the user selects which application form to create on this selection screen, the external storage unit 22 of the client-side terminal device or the external storage of the server-side terminal device is selected. The corresponding data is read from the unit 12,
The display unit 24 becomes, for example, a screen similar to that shown in FIG. 14, and is in a state where necessary data can be input to each column. Then, the worker additionally inputs data, for example, as shown in FIG.
As described above, in the case of storage, the input data is stored in the external storage unit 22 or the external storage unit 12 (step S32), and in the case of the submission process, the input data is transmitted to the server-side terminal device 1 (step S33). Will be. The processing performed by the server-side terminal device 1 after this is as described above in steps S3 to S5.
【0100】(処理待ちの申請書の処理を行う場合)
次に、処理待ちの申請書の処理を行う場合の図9のス
テップS41乃至ステップS43の処理について説明す
る。(When processing a pending application)
Next, the processing of steps S41 to S43 in FIG. 9 in the case of performing the processing of the application waiting for processing will be described.
【0101】クライアント側端末装置(この場合は、次
の手続順序の権限者が使用する依頼元端末装置2又は依
頼先端末装置3)では、ステップS41で図12に示す
作業選択画面の「処理待の申請書」をマウスクリックす
ると、図16に示すように、処理待ちの申請書の一覧が
表示部24に表示される。ここで、作業する申請書(こ
の例では一番上の段の申請書)をマウスクリックで選択
すると(ステップS42)、図17に示すように、選択
した申請書についての雛型が、入力データ入りで表示部
24に表示される。これに対して、当該権限者が承認ボ
タン24c又は否認ボタン24dをマウスクリックす
る、或いは一部否認のため入力データを変更して承認ボ
タン24cをマウスクリックする等の操作を行うと(ス
テップS43)、当該結果が手続完了の旨のデータとし
てサーバ側端末装置1に送信される。この後は、サーバ
側端末装置1で上述のステップS7以下の処理が行われ
ることになる。In the client side terminal device (in this case, the request source terminal device 2 or the request destination terminal device 3 used by the authorized person in the next procedure order), in step S41, the “processing wait” is displayed on the work selection screen shown in FIG. When the mouse clicks on “Application Form”, a list of application forms waiting to be processed is displayed on the display unit 24, as shown in FIG. Here, when the application form to be worked on (in this example, the application form at the top row) is selected by mouse click (step S42), the template for the selected application form is input data as shown in FIG. It is displayed on the display unit 24 upon entering. On the other hand, when the authorized person performs an operation such as a mouse click on the approval button 24c or the denial button 24d, or an input data change for partial denial and a mouse click on the approval button 24c (step S43). The result is transmitted to the server-side terminal device 1 as data indicating the completion of the procedure. After that, the above-described processing in step S7 and subsequent steps is performed in the server-side terminal device 1.
【0102】なお、権限者により申請者の申請の否認又
は一部否認が行われた場合にサーバ側端末装置1が行う
処理の詳細については後述する。The details of the processing performed by the server-side terminal device 1 when the request of the applicant is denied or partially denied by the authorized person will be described later.
【0103】(提出済の申請書の状況確認を行う場
合)次に、提出済の申請書の状況確認を行う場合の図
10のステップS51乃至ステップS52の処理につい
て説明する。(When the Status of Submitted Application is Confirmed) Next, the processing of steps S51 to S52 in FIG. 10 when the status of the submitted application is confirmed will be described.
【0104】クライアント側端末装置(依頼元端末装置
2及び依頼先端末装置3)では、ステップS51で、図
12に示す作業選択画面の「提出済の申請書」をマウス
クリックすると、ステップS52で、図18に示すよう
に、当該作業者が既に作成し提出した申請書の一覧(こ
の例では2件分)と、各申請についてのその後の進行状
況についての情報が、表示部24で表示される。In the client side terminal device (the request source terminal device 2 and the request destination terminal device 3), in step S51, when the "submitted application" on the work selection screen shown in FIG. 12 is clicked with the mouse, in step S52, As shown in FIG. 18, a list of applications already created and submitted by the worker (in this example, two applications) and information on the subsequent progress of each application are displayed on the display unit 24. .
【0105】(各端末装置間で行われる作業及び処理)
次に、図19乃至図30を参照して、サーバ側端末装置
1とクライアント側端末装置とで行われる作業及び処理
の詳細について説明する。以下は、依頼元企業となる株
式会社2nの社員である山田一郎が、同会社の総務部に
文具の購入についての購買申請を行う場合について説明
する。(Work and processing performed between terminal devices)
Next, with reference to FIG. 19 to FIG. 30, details of operations and processes performed between the server-side terminal device 1 and the client-side terminal device will be described. The following describes a case where Ichiro Yamada, an employee of 2n Co., Ltd., which is a requesting company, makes a purchase application for the purchase of stationery to the general affairs department of the company.
【0106】図19乃至図22に、各作業者が行う作業
及び各端末機で行われる処理の流れを示す。FIGS. 19 to 22 show the work performed by each worker and the flow of processing performed by each terminal.
【0107】まず、申請者となる山田一郎は、クライア
ント側端末装置(依頼元端末装置2)の操作入力部25
を操作して、上述のようにインターネットの所定アドレ
ス(サイト)にアクセスしてシステムに接続し(ステッ
プS61、ステップS11)、表示部24に表示された
初期入力画面に図11のようにIDとパスワードを入力
して、これらを認証データとしてサーバ側端末装置1に
送信する(ステップS62)。First, Ichiro Yamada, who is the applicant, operates the operation input unit 25 of the client-side terminal device (request source terminal device 2).
Is operated to access a predetermined address (site) on the Internet as described above to connect to the system (step S61, step S11), and the initial input screen displayed on the display unit 24 displays the ID and the ID as shown in FIG. A password is input, and these are transmitted to the server-side terminal device 1 as authentication data (step S62).
【0108】サーバ側端末装置1は、送受信部13で認
証データを受信すると、制御部11が、外部記憶部12
に格納された前記認証プログラムを読み出して作業者を
特定し(ステップS63)、正規のユーザ(作業者)で
あるとの認証を行った後にステップS64に進む。な
お、この認証の処理については、図3のステップS1で
説明した通りである。When the transmitting / receiving unit 13 receives the authentication data, the server side terminal device 1
Is read out to identify the worker (step S63), and after authenticating that the user is a legitimate user (worker), the process proceeds to step S64. Note that the authentication processing is as described in step S1 of FIG.
【0109】次のステップS64では、サーバ側端末装
置1は、外部記憶部12に格納されたデータから、当該
作業者の「作業の状況」と「申請書類の雛型の種類」に
ついてのデータを読み出して、依頼元端末装置2に送信
する。そして、当該データを受信した依頼元端末装置2
では、図12で上述した作業選択画面が表示部24に表
示される(ステップS65、ステップS13)ので、作
業者(申請者)である山田一郎は、総務部に購買申請書
を提出するために、作業選択画面の申請書の雛型の総務
申請一覧の中の「購買申請」の項目をマウスクリックで
選択する(ステップS66、ステップS21)。In the next step S 64, the server-side terminal device 1, based on the data stored in the external storage unit 12, stores data on the “work status” and “type of application document template” of the worker. Read it out and send it to the requesting terminal device 2. Then, the request source terminal device 2 that has received the data
Then, the work selection screen described above with reference to FIG. 12 is displayed on the display unit 24 (step S65, step S13), so that the worker (applicant) Ichiro Yamada is required to submit a purchase application form to the general affairs department. Then, the item of "purchase application" in the list of general affairs applications of the application form on the work selection screen is selected with a mouse click (steps S66 and S21).
【0110】これにより、作業者の山田一郎により選択
された項目についてのデータが雛型要求データとしてサ
ーバ側端末装置1に送信され、この雛型要求データを受
信したサーバ側端末装置1は、外部記憶部12に格納さ
れたデータから、購買申請書の雛型のデータを読み出し
て(ステップS67)、当該雛型のデータを依頼元端末
装置2に返送する(ステップS68)。As a result, the data on the item selected by the worker, Ichiro Yamada, is transmitted to the server-side terminal device 1 as template request data. From the data stored in the storage unit 12, the model data of the purchase application form is read (step S67), and the model data is returned to the requesting terminal device 2 (step S68).
【0111】そして、この雛型のデータを受信したクラ
イアント側端末装置では、図13で上述した購買申請書
の雛型の画面が表示部24に表示される(ステップS6
9)ので、申請者である山田一郎は、図14に示すよう
に必要なデータを入力し、提出ボタン24bをマウスク
リックして、サーバ側端末装置1に入力データとして送
信する(ステップS70、ステップS23)。Then, in the client-side terminal device receiving the template data, the template screen of the purchase application form described above with reference to FIG. 13 is displayed on the display unit 24 (step S6).
9) Therefore, the applicant, Ichiro Yamada, inputs necessary data as shown in FIG. 14, clicks the submit button 24b with a mouse, and transmits the input data to the server-side terminal device 1 (step S70, step S70). S23).
【0112】ここで、購買申請書の雛型にデータ入力す
る欄としては、図14に示すように、購買する物品の
「品目」を入力する欄、購買する物品の「コード」を入
力する欄、購買する物品の「個数」及びその「単位」を
入力する欄、購買する物品の納期を希望する日時を入力
する欄、及び、その他の連絡事項等についての「備考」
欄が設けられている。なお、この入力例では、図14に
示すように、申請者の山田一郎が購買申請する文具とし
て、筆ペン5ダースとボールペン5ダースとし、200
0年3月15日を希望納期としている。As shown in FIG. 14, the fields for inputting data into the model of the purchase application form include a field for inputting the “item” of the article to be purchased and a field for inputting the “code” of the article to be purchased. , A column to enter the "quantity" of purchased goods and its "unit", a column to enter the date and time when you want the delivery date of the purchased goods, and "remarks" for other communication items
A column is provided. In this input example, as shown in FIG. 14, as the stationery for which the applicant, Ichiro Yamada, applies for purchase, five dozen brush pens and five dozen ball pens are used.
The desired delivery date is March 15, 0.
【0113】続いて、入力データを受信したサーバ側端
末装置1では、受信した入力データと外部記憶部12に
格納されたデータに基づいて、図3のステップS3乃至
ステップS5の手順により、依頼元企業の権限者の選定
(ステップS3)及び依頼先企業及びその権限者の選定
(ステップS4)の処理を行い、さらに、これら各選定
結果に基づいて、図4で上述した権限一覧表と進行状態
表の該当する欄へのデータ登録を行うことにより、権限
データベースを作成し(ステップS71、ステップS
5)、作成した権限データベースを外部記憶部12に格
納する。Subsequently, the server-side terminal device 1 that has received the input data, based on the received input data and the data stored in the external storage unit 12, performs the procedure of the step S3 to step S5 in FIG. The process of selecting the authorized person of the company (step S3) and the requesting company and the authorized person (step S4) are performed, and further, based on each of these selection results, the authority list and the progress status described above with reference to FIG. An authority database is created by registering data in the corresponding column of the table (step S71, step S71).
5) The created authority database is stored in the external storage unit 12.
【0114】図23には、申請者である山田一郎からの
入力データが2000年3月5日にサーバ側端末装置1
に送信された場合の権限データベースの各欄へのデータ
登録例を示している。この例では、山田一郎の所属する
依頼元企業2nの権限者として、課長橋本吾郎が承認権
者として、部長Cも承認権者として、総務課長Dが決裁
権者としてそれぞれ選択され、また、山田一郎の所属し
ない依頼先企業3n(例えば文具販売会社)の権限者と
して、責任者Qが受注承認権者として、発送担当Rが発
送権者として、それぞれ選択され、以後はこの順で各種
権限に基づく手続が行われることになる。このような権
限データベースの作成により、申請者山田一郎が行った
申請に対して、複数の企業にまたがる権限者、手続順
序、及び手続内容が自動的に割り当てられることにな
る。FIG. 23 shows that the input data from the applicant, Ichiro Yamada, was sent to the server-side terminal 1 on March 5, 2000.
9 shows an example of data registration in each column of the authority database when the data is transmitted to the authority database. In this example, the section manager Goro Hashimoto is selected as the authority of the requesting company 2n to which Ichiro Yamada belongs, the section manager C is also the approval authority, and the general affairs section manager D is the approval authority. As the authority of the requested company 3n (for example, stationery sales company) to which Ichiro does not belong, the responsible person Q is selected as the order approval authority, and the shipping charge R is selected as the shipping authority, and thereafter, various authorities are assigned in this order. Based procedures will be conducted. By creating such an authority database, the authority, the order of the procedures, and the contents of the procedures across a plurality of companies are automatically assigned to the application made by the applicant Ichiro Yamada.
【0115】なお、図23に示すように、権限データベ
ースが作成された段階では、各権限者による作業がなさ
れていないので、進行状態表の作業日付欄は空欄となっ
ている。As shown in FIG. 23, at the stage when the authority database is created, no work is performed by each authorized person, so the work date column of the progress status table is blank.
【0116】そして、サーバ側端末装置1は、次の手続
順序の権限者(この場合は課長の橋本吾郎)宛に、手続
を行うべき旨の通知を送信する(ステップS72、ステ
ップS6)。Then, the server-side terminal device 1 transmits a notification to the effect that the procedure should be performed to the authorized person in the next procedure order (in this case, the section manager Goro Hashimoto) (steps S72 and S6).
【0117】この通知の送信により、次の手続順序の権
限者である橋本吾郎がクライアント側端末装置(依頼元
端末装置2)でシステムにアクセスしてID等を入力し
た場合には、上述した作業選択画面が当該端末装置の表
示部24に表示され(図12参照)、この作業選択画面
の「処理待ちの申請書」の項目の件数欄に、山田一郎が
申請した購買申請についての1件が追加され、さらに、
橋本吾郎によりこの「処理待ちの申請書」の項目がマウ
スクリックされることで、図16に示す処理待ちの申請
書の一覧が表示部24に表示される(ステップS7
3)。By transmitting this notification, if Goro Hashimoto, who is the authority of the next procedure order, accesses the system at the client terminal device (request source terminal device 2) and inputs an ID or the like, the above-described operation is performed. A selection screen is displayed on the display unit 24 of the terminal device (see FIG. 12). In the work selection screen, one of the purchase applications applied by Ichiro Yamada is displayed in the number column of the item of “application waiting for processing”. Added,
When the item of the “application waiting for processing” is clicked with a mouse by Goro Hashimoto, a list of application waiting for processing shown in FIG. 16 is displayed on the display unit 24 (step S7).
3).
【0118】図16の例では、山田一郎による購買申請
についての件が最上段に表示されており、この最上段の
欄をマウスクリックで選択すると、図17に示すよう
に、選択した山田一郎による購買申請についての雛型及
び入力データが表示部24に表示される(ステップS7
4)。そして、権限者である橋本吾郎が山田一郎による
購買申請の内容を確認して画面の承認ボタン24cをマ
ウスクリックすることにより、承認した旨が手続完了の
旨のデータとしてサーバ側端末装置1に送信される(ス
テップS75)。In the example shown in FIG. 16, the item about the purchase application by Ichiro Yamada is displayed at the top, and when this top column is selected with a mouse click, as shown in FIG. The template and the input data of the purchase application are displayed on the display unit 24 (step S7).
4). Then, Goro Hashimoto, who is the authorized person, confirms the contents of the purchase application by Ichiro Yamada and clicks the approval button 24c on the screen with a mouse to transmit the approval to the server-side terminal device 1 as data indicating the completion of the procedure. Is performed (step S75).
【0119】この手続完了の旨のデータを受信したサー
バ側端末装置1では、権限データベースの進行状態表を
書き換えて外部記憶部22に格納することにより、当該
権限データベースを更新し、さらに次の手続順序の権限
者(この場合は部長C)宛に、手続を行うべき旨の通知
を送信する(ステップS76)。ここで、進行状態表の
書き換えについては、図24に示すように、橋本吾郎か
らの手続完了の旨のデータを受信した日時(例えば20
00年3月8日)を、橋本吾郎の作業日付欄に登録する
ようにする。The server-side terminal device 1 that has received the data indicating that the procedure has been completed updates the authority database by rewriting the progress status table of the authority database and storing it in the external storage unit 22. A notification to the effect that the procedure should be performed is transmitted to the authority of the order (in this case, the manager C) (step S76). Here, regarding the rewriting of the progress status table, as shown in FIG. 24, the date and time when data indicating the completion of the procedure from Goro Hashimoto was received (for example, 20
March 8, 2000) is registered in the work date column of Goro Hashimoto.
【0120】以下は、上述したステップS73乃至ステ
ップS76の処理が繰り返される(ステップS77)こ
とにより、山田一郎が行った購買申請について、進行状
態表に記載された複数の企業にまたがる各権限者により
処理が行われる。すなわち、この例では、課長橋本吾郎
による承認、部長Cによる承認、総務課長Dによる決裁
がこの順で行われ、これら各処理が行われる毎に、各権
限者の使用するクライアント側端末装置から手続完了の
旨のデータが送信され、当該手続完了の旨のデータがサ
ーバ側端末装置1で受信される度に、権限データベース
の進行状態表が書き換えられて(図25参照)、外部記
憶部22に格納される。Thereafter, the processing of steps S73 to S76 described above is repeated (step S77), so that the authority applied to the purchase application made by Yamada Ichiro spans a plurality of companies described in the progress status table. Processing is performed. That is, in this example, the approval by the section manager Goro Hashimoto, the approval by the section manager C, and the approval by the general affairs section manager D are performed in this order, and every time these processes are performed, a procedure is performed from the client-side terminal device used by each authorized person. Each time data indicating the completion of the procedure is transmitted, and the data indicating the completion of the procedure is received by the server-side terminal device 1, the progress status table of the authority database is rewritten (see FIG. 25) and stored in the external storage unit 22. Is stored.
【0121】そして、各権限者の中で最後に手続を行う
者、すなわち、権限一覧表に記載された各権限者のうち
の最下欄の者(この例では発送担当R)からの手続完了
の旨のデータがクライアント側端末装置(依頼先端末装
置3)から送信されると(ステップS78)、当該デー
タを受信したサーバ側端末装置1は、図25に示すよう
に、権限データベースの進行状態表の作業日時欄に受信
日時(この例では2000年3月12日)のデータを登
録して権限データベースを更新するとともに、申請事項
についての最終結果を示すデータを受信したものとし
て、申請者である山田一郎宛に当該最終結果についての
通知(この例では発送が行われた旨)を送信し(ステッ
プS80)、山田一郎から当該最終結果についての確認
信号の受信を待つ状態となる。Then, the person who performs the procedure last among the authorized persons, that is, the procedure completed by the person at the bottom of the authorized persons listed in the authority list (in this example, the dispatcher R) is completed. Is transmitted from the client-side terminal device (request-destination terminal device 3) (step S78), the server-side terminal device 1 that has received the data, as shown in FIG. The data of the reception date and time (March 12, 2000 in this example) is registered in the work date and time column of the table, the authority database is updated, and the data indicating the final result of the application matter is received. A notification about the final result is transmitted to a certain Yamada Ichiro (in this example, the fact that the shipment has been performed) (step S80), and the reception of a confirmation signal about the final result from Ichiro Yamada is waited. To become.
【0122】この通知の送信により、次の山田一郎がク
ライアント側端末装置でシステムにアクセスしてID等
を入力した場合には、上述した作業選択画面が当該端末
装置の表示部24に表示され(図12参照)、この作業
選択画面の「処理待の申請書」の項目の件数欄に、山田
一郎が申請した購買申請についての1件が追加される
(ステップS81)。When the following transmission of this notification causes the next Ichiro Yamada to access the system on the client-side terminal device and input an ID or the like, the above-described work selection screen is displayed on the display section 24 of the terminal device ( In the work selection screen, one case concerning the purchase application filed by Ichiro Yamada is added to the number column of the item of “application for processing” (step S81).
【0123】また、山田一郎が図12で上述した作業選
択画面の「提出済の申請書」をマウスクリックすると
(ステップS51)、権限データベースの進行状態表の
記載に基づいたその時点での手続の状態が表示部24に
表示される(ステップS52)ので(図18参照)、山
田一郎は、2000年3月15日に文具(筆ペン5ダー
スとボールペン5ダース)が発送されていることを知る
ことができる。When Ichiro Yamada clicks the "submitted application form" with the mouse on the work selection screen described above with reference to FIG. 12 (step S51), the procedure at that time based on the description of the progress status table in the authority database is performed. Since the state is displayed on the display unit 24 (step S52) (see FIG. 18), Yamada Ichiro knows that stationery (five dozen brush pens and five dozen ballpoint pens) has been sent out on March 15, 2000. be able to.
【0124】そして、山田一郎は、後日に発送担当Rの
発送した当該文具が手元に届けられることにより、これ
を受領して納品を確認すると、クライアント側端末装置
を操作してシステムに接続し、上述した作業選択画面の
「処理待の申請書」、及び該当する購買申請書の項目を
順次マウスクリックして(ステップS82)、表示部2
4に表示された画面上で、当該購買申請書の最終結果と
して、納品を確認した旨のデータ入力を行い、当該入力
データを、最終結果についての確認信号としてサーバ側
端末装置1に送信する(ステップS83)。Then, Yamada Ichiro receives the stationery sent out by the dispatcher R at a later date, receives it, and confirms the delivery. When the stationery is delivered and operated, the client-side terminal device is operated to connect to the system. The mouse button is clicked on the “application waiting to be processed” on the work selection screen and the corresponding purchase application form in order (step S82), and the display unit 2 is displayed.
As a final result of the purchase application form, data input indicating that the delivery has been confirmed is input on the screen displayed in FIG. 4, and the input data is transmitted to the server-side terminal device 1 as a confirmation signal of the final result ( Step S83).
【0125】そして、サーバ側端末装置1は、申請者で
ある山田一郎からの最終結果についての確認信号を受信
すると、図26に示すように、権限データベースの進行
状態表の山田一郎の作業日付欄に、当該確認信号を受信
した日時(例えば2000年3月15日)のデータを登
録して、一連の処理を終了する。When the server side terminal device 1 receives the confirmation signal about the final result from the applicant, Ichiro Yamada, as shown in FIG. 26, the work date column of Ichiro Yamada in the progress status table of the authority database, as shown in FIG. Then, the data of the date and time when the confirmation signal is received (for example, March 15, 2000) is registered, and a series of processing is ended.
【0126】以上のような処理が行われることにより、
実施の形態では、申請者が行った一の申請に対して、複
数の企業にまたがる権限者、手続順序、及び手続内容が
自動的に割り当てられ、また、申請者及び各権限者によ
る書類を作成する手間から解放され、さらには「申請か
ら納品確認」までの一連の作業を完全に閉じたループと
して処理することが可能となるので、複数の企業にまた
がる一連のビジネスプロセスの全体を統合して管理する
ことが可能となる。By performing the above processing,
In the embodiment, the authority, the order of the procedures, and the details of the procedure are automatically assigned to one application made by the applicant, and the documents are prepared by the applicant and each authority. It is possible to process a series of work from “application to delivery confirmation” as a completely closed loop, so that a whole series of business processes spanning multiple companies can be integrated It becomes possible to manage.
【0127】(権限者により申請が否認された場合)こ
の実施の形態では、申請者の申請がいずれかの権限者に
より否認された場合には、権限データベースの進行状態
表が所定の前の状態まで戻されるとともに、その旨が申
請者宛に通知されるようになっている。(In the case where the application is denied by the authorized person) In this embodiment, when the application of the applicant is rejected by any one of the authorized persons, the progress status table of the authority database is set to a predetermined previous state. And will be notified to the applicant.
【0128】具体的には、サーバ側端末装置1の制御部
11は、クライアント側端末装置において図17の表示
画面から否認ボタン24dがマウスクリックされること
に基づいて(ステップS43)、送受信部13でいずれ
かの権限者からの申請を否認する旨の申請否認データを
受信すると、権限データベースの進行状態表の作業日付
欄の記載を所定の前の状態まで戻すとともに、当該権限
者により申請が否認された旨を例えばeメールの形式で
申請者宛に通知するように送受信部13を制御する。More specifically, the control unit 11 of the server-side terminal device 1 executes the transmission / reception unit 13 based on the mouse-click of the denial button 24d from the display screen of FIG. 17 in the client-side terminal device (step S43). Upon receiving application rejection data to deny an application from one of the authorized persons, the work date column in the progress table of the authority database is returned to the previous state and the application is rejected by the relevant authority The transmission / reception unit 13 is controlled so as to notify the applicant in the form of e-mail, for example.
【0129】これを図27及び図28に示す具体例に則
して説明すると、例えば山田一郎の申請した購買申請に
ついて、まず課長の橋本吾郎が2000年3月8日に承
認し(図27(a)、図28(a))、続いて部長Cも
同年3月9日に承認し(図27(b)、図28
(b))、この後に総務課長Dが否認した場合には、図
27(c)及び図28(c)に示すように、進行状態表
の作業日付欄の記載が図28(a)の状態、すなわち橋
本吾郎が承認した段階の状態まで戻される。これによ
り、部長Cがシステムに接続すると、この山田一郎の申
請した購買申請についての件が図12の作業選択画面の
「処理待の申請書」に追加され、総務課長Dの直前の権
限者である部長Cが再び処理可能な状態となる。この場
合には、サーバ側端末装置1は、当該購買申請が総務課
長Dによって否認された旨を例えばeメールの形式で部
長C宛に通知するようにする。This will be described with reference to specific examples shown in FIGS. 27 and 28. For example, a purchase application filed by Ichiro Yamada is first approved by the section manager Goro Hashimoto on March 8, 2000 (FIG. 27 ( a), FIG. 28 (a)), and also the director C was approved on March 9 of the same year (FIG. 27 (b), FIG. 28).
(B)) After that, if the general affairs section manager D denies the request, the work date column in the progress status table is changed to the state shown in FIG. 28 (a) as shown in FIGS. 27 (c) and 28 (c). That is, the state is returned to the state approved by Goro Hashimoto. As a result, when the manager C connects to the system, the matter about the purchase application applied by Ichiro Yamada is added to the “application for processing” on the work selection screen in FIG. A certain manager C is ready to process again. In this case, the server-side terminal device 1 notifies the department manager C that the purchase application has been rejected by the general affairs section manager D, for example, in the form of e-mail.
【0130】なお、参考までに、仮に総務課長Dが例え
ば2000年3月10日に承認した場合についての各表
の状態を図28(d)に示す。この場合には、次の手続
順序の権限者である依頼者企業の責任者Qがシステムに
接続すると、この購買申請についての件が図12の作業
選択画面の「処理待の申請書」に追加される。For reference, FIG. 28D shows the state of each table in the case where the general affairs section manager D approves, for example, on March 10, 2000. In this case, when the manager Q of the requesting company, which is the authority of the next procedure, connects to the system, the matter of this purchase application is added to the “application for processing” on the work selection screen in FIG. Is done.
【0131】なお、申請が否認された場合に作業日付欄
をいかなる状態まで戻すかについては、この実施の形態
では、申請を否認した権限者(上述の例では総務課長
D)の直前の権限者(上述の例では部長C)が作業可能
な状態まで戻すことになっているが、設定により、例え
ば作業日付欄を全部リセットして白紙状態にして再度申
請者による申請をやり直すこととしても良い。In this embodiment, as to what state the work date column is returned to when the application is rejected, the authority immediately before the authority who rejected the application (the general affairs section manager D in the above example) is used. Although (the manager C in the above example) returns to the state in which the work can be performed, depending on the setting, for example, the work date column may be entirely reset to a blank state, and the applicant may apply again.
【0132】また、権限データベースには、申請を否認
した理由についての権限者からのコメントを記載する理
由欄が設けられることとしても良い。これにより、申請
者が同じ申請事項について再び申請を行うときには、理
由欄の記載を参考にして、例えば申請する文具の1個あ
たりの単価を安いものにする、或いは申請する文具の個
数を減らす等の策を講じることが可能となる。Further, the authority database may be provided with a reason column for describing a comment from the authority regarding the reason for denying the application. In this way, when the applicant reapplies for the same application items, referring to the description in the reason column, for example, reduce the unit price per stationery to be applied, or reduce the number of stationery to apply, etc. Can be taken.
【0133】(権限者により申請内容の一部が否認され
た場合)さらに、この実施の形態では、権限者により申
請者の申請内容の一部を否認できるようになっており、
この場合にも権限データベースの進行状態表が所定の前
の状態まで戻されるとともに、その旨が申請者宛に通知
されるとともに、申請者の申請内容についての入力デー
タが権限者の要求に応じて変更されるようになってい
る。(Case where Part of Application Content is Denied by Authorized Person) Further, in this embodiment, a part of the application content of the applicant can be denied by the authorized person.
In this case as well, the progress status table of the authority database is returned to the predetermined previous state, the fact is notified to the applicant, and the input data on the application content of the applicant is made in accordance with the request of the authority. It has been changed.
【0134】具体的には、サーバ側端末装置1の制御部
11は、クライアント側端末装置において図17の表示
画面から入力データを変更して承認ボタン24cがマウ
スクリックされることに基づいて(ステップS43)、
送受信部13でいずれかの権限者からの、申請を一部否
認する旨の申請一部否認データを受信すると、その旨
を、進行状態表に記載して、少なくとも申請者宛に通知
するとともに、申請一部否認データに応じて入力データ
を変更し、当該権限者により申請が一部否認され入力デ
ータが変更された旨を、申請者宛、及び当該申請につい
ての各権限者宛に、例えばeメールの形式で通知するよ
うに送受信部13を制御する。More specifically, the control unit 11 of the server-side terminal device 1 changes the input data from the display screen of FIG. 17 in the client-side terminal device and, based on the mouse click of the approval button 24c (step S43),
When the transmission / reception unit 13 receives the application partial rejection data indicating that the application is partially rejected from any of the authorized persons, this is described in the progress status table, and at least addressed to the applicant, Change the input data according to the application partial rejection data, and inform the applicant and the respective authorities regarding the application that e.g. e. The transmission / reception unit 13 is controlled so as to be notified in a mail format.
【0135】これを図29及び図30に示す具体例に則
して説明すると、例えば図29(a)及び図30(a)
に示すように、購買申請書の雛型に、山田一郎が5ダー
スの筆ペン及び5ダースのボールペンを入力データとし
て入力してサーバ側端末装置1に送信すると、最初の権
限者である橋本吾郎の作業時には、購買申請書について
はこれと同一の画面が表示部24に表示される(図29
(b)、図30(b))。そして、この表示画面から、
図30(c)に示すように、橋本吾郎が雛型の入力デー
タについて、ボールペンの申請個数を5ダースから2ダ
ースに変更して承認ボタン24cをマウスクリックす
る。This will be described with reference to the specific examples shown in FIGS. 29 and 30. For example, FIGS. 29 (a) and 30 (a)
As shown in the figure, when Ichiro Yamada inputs five dozen brush pens and five dozen ball pens as input data to the template of the purchase application form and sends it to the server-side terminal device 1, Goro Hashimoto, the first authorized person, 29, the same screen is displayed on the display unit 24 for the purchase application form (FIG. 29).
(B), FIG. 30 (b)). And from this display screen,
As shown in FIG. 30C, Goro Hashimoto changes the application number of ballpoint pens from 5 dozens to 2 dozens for the input data of the template, and clicks the approval button 24c with the mouse.
【0136】すると、次の手続順序の権限者(部長C)
がシステムに接続した際に、この購買申請が、入力デー
タが変更された状態で「処理待の申請書」に追加され
る。また、この場合には、入力データが変更された旨
(購入品についての申請個数が減らされた旨)の通知
が、申請者である山田一郎宛、及び、権限一覧表に記載
された各権限者宛に送信される。Then, the authority (manager C) of the next procedure order
When is connected to the system, this purchase application is added to the "application for processing" with the input data changed. In this case, the notification that the input data has been changed (the number of applications for purchased items has been reduced) is sent to the applicant, Ichiro Yamada, and to each authority listed in the authority list. Sent to the person.
【0137】以上のように、この実施の形態では、申請
者が入力した申請事項についての入力データが、権限者
の要求に応じて変更できるようになっており、上述の例
では、申請者山田一郎の申請事項に対して、権限者の橋
本吾郎が、購入申請されたボールペンの個数を5ダース
から2ダースに減らすことを条件に承認することが可能
となる。As described above, in this embodiment, the input data on the application items input by the applicant can be changed according to the request of the authorized person. Goro Hashimoto, an authorized person, can approve Ichiro's application on the condition that the number of ballpoint pens requested for purchase be reduced from 5 dozens to 2 dozens.
【0138】なお、基礎データの内容を変更する権限を
いずれの権限者に与えるか、基礎データのいずれの内容
を変更可能とするか等についてのルールは、例えばif
〜then〜構文のプログラムにより個別に設定すれば
良い。[0138] Rules regarding which authority is granted to change the contents of the basic data and which contents of the basic data can be changed are, for example, if
What is necessary is just to set individually by the program of ~ then ~ syntax.
【0139】以上のように、実施の形態のビジネスプロ
セス管理システムによれば、上述した依頼元企業内の決
裁のために使用される申請書等、依頼元企業から依頼先
企業への企業間契約と情報伝達のために使用される発注
書等、依頼先企業内の決裁のために使用される受注書
等、依頼先企業から依頼元企業への企業間契約と情報伝
達のために使用される納品書等の各書類が不要となり、
各文書の配送等に関する工数が削減され、手続の簡易
化、迅速化が図られる。As described above, according to the business process management system of the embodiment, the inter-company contract from the requesting company to the requesting company, such as the application form used for the above-mentioned decision in the requesting company. Orders used for information communication with clients, orders received for approval within the client company, etc. Used for inter-company contracts and information transmission from client companies to client companies Each document such as a delivery note becomes unnecessary,
The man-hours related to the delivery of each document are reduced, and the procedure is simplified and speeded up.
【0140】また、図31及び図32に示すように、依
頼元企業と依頼先企業とによる複数の企業でデータベー
スを結果的に共有することが可能となり、依頼元企業と
依頼先企業は、自社に関係あるデータだけをデータベー
スから引き出すことが可能となる。これにより、企業内
の手順の流れだけでなく、「発注と受注」、「発送と納
品確認」といった複数の企業間の取引を一元管理して、
「申請から納品確認」までの一連のビジネスプロセスの
全体を完全に閉じたループとして処理することが可能と
なる。As shown in FIGS. 31 and 32, the database can be eventually shared between the requesting company and the requesting company, and the requesting company and the requesting company can use their own databases. Can be extracted from the database. In this way, it is possible to centrally manage not only the flow of procedures within a company, but also transactions between multiple companies such as "ordering and receiving orders" and "shipping and delivery confirmation"
It is possible to process the entire series of business processes from “application to delivery confirmation” as a completely closed loop.
【0141】[0141]
【発明の効果】以上詳細に説明したように、本発明によ
れば、複数の企業にまたがる一連のビジネスプロセスの
全体を統合して管理することが可能なビジネスプロセス
管理システムを提供することが可能となる。As described above in detail, according to the present invention, it is possible to provide a business process management system capable of integrating and managing a whole series of business processes spanning a plurality of companies. Becomes
【図1】本発明を適用したビジネスプロセス管理システ
ムの全体構成を説明する図である。FIG. 1 is a diagram illustrating an overall configuration of a business process management system to which the present invention has been applied.
【図2】サーバ側端末装置の構成を説明するブロック図
である。FIG. 2 is a block diagram illustrating a configuration of a server-side terminal device.
【図3】サーバ側端末装置が行う処理の概要を説明する
ためのフローチャートである。FIG. 3 is a flowchart illustrating an outline of a process performed by a server-side terminal device.
【図4】サーバ側端末装置が作成する権限データベース
について説明する図である。FIG. 4 is a diagram illustrating an authority database created by a server-side terminal device.
【図5】クライアント側端末装置の構成を説明するブロ
ック図である。FIG. 5 is a block diagram illustrating a configuration of a client-side terminal device.
【図6】クライアント側端末装置で行われるデータ入力
操作及び処理について説明するフローチャートであり、
作業者がシステムに接続して、作業を選択する段階まで
の手順等を示す。FIG. 6 is a flowchart illustrating a data input operation and a process performed by the client-side terminal device;
The procedure and the like up to the stage where an operator connects to the system and selects an operation will be described.
【図7】クライアント側端末装置(依頼元端末装置)で
行われるデータ入力操作及び処理について説明するフロ
ーチャートであり、作業者が申請書の新規作成を行う場
合の手順等を示す。FIG. 7 is a flowchart illustrating a data input operation and a process performed by a client-side terminal device (request source terminal device), illustrating a procedure when an operator newly creates an application form;
【図8】クライアント側端末装置(依頼元端末装置)で
行われるデータ入力操作及び処理について説明するフロ
ーチャートであり、作業者が作成中の申請書の更新を行
う場合の手順等を示す。FIG. 8 is a flowchart illustrating a data input operation and a process performed by a client-side terminal device (request source terminal device), and illustrates a procedure when an operator updates an application form being created;
【図9】クライアント側端末装置(依頼元端末装置及び
依頼先端末装置)で行われるデータ入力操作及び処理に
ついて説明するフローチャートであり、作業者が処理待
ちの申請書の処理を行う場合の手順等を示す。FIG. 9 is a flowchart illustrating a data input operation and a process performed by a client-side terminal device (a request source terminal device and a request destination terminal device), and a procedure when an operator processes an application waiting for processing; Is shown.
【図10】クライアント側端末装置(依頼元端末装置及
び依頼先端末装置)で行われる操作及び処理について説
明するフローチャートであり、提出済の申請書の状況確
認を行う場合の手順等を示す。FIG. 10 is a flowchart illustrating operations and processes performed by a client-side terminal device (a request source terminal device and a request destination terminal device), and illustrates a procedure for checking the status of a submitted application;
【図11】クライアント側端末装置の表示部に表示され
る初期入力画面の例について示す図である。FIG. 11 is a diagram illustrating an example of an initial input screen displayed on a display unit of the client-side terminal device.
【図12】クライアント側端末装置の表示部に表示され
る作業選択画面の例について示す図である。FIG. 12 is a diagram illustrating an example of a work selection screen displayed on a display unit of the client-side terminal device.
【図13】クライアント側端末装置の表示部に表示され
る購買申請書の雛形の例について示す図である。FIG. 13 is a diagram illustrating an example of a template of a purchase application form displayed on a display unit of the client-side terminal device.
【図14】図13の購買申請書の雛形にデータを入力し
た状態を示す図である。FIG. 14 is a diagram showing a state in which data has been input to the template of the purchase application form in FIG. 13;
【図15】図14の状態からさらにデータを追加入力し
た状態を示す図である。FIG. 15 is a diagram illustrating a state in which data is additionally input from the state of FIG. 14;
【図16】クライアント側端末装置の表示部に表示され
る処理待ちの申請書一覧の画面について示す図である。FIG. 16 is a diagram showing a screen of a list of application forms waiting to be displayed, which is displayed on the display unit of the client-side terminal device.
【図17】次の手続順序の権限者が使用するクライアン
ト側端末装置の表示部に表示される購買申請書の雛形の
画面について示す図である。FIG. 17 is a diagram showing a purchase application form template screen displayed on the display unit of the client-side terminal device used by the authorized person in the next procedure order.
【図18】作業者が既に作成及び提出した申請書につい
て、その後の進行状況についての一覧を表示する画面に
ついて示す図である。FIG. 18 is a diagram showing a screen for displaying a list of the progress of an application already created and submitted by an operator.
【図19】各作業者が行う作業及びサーバ側端末装置と
クライアント側端末装置間で行われる処理及びデータの
流れを説明するためのチャート図である。FIG. 19 is a chart for explaining the work performed by each worker, the processing performed between the server-side terminal device and the client-side terminal device, and the flow of data.
【図20】各作業者が行う作業及びサーバ側端末装置と
クライアント側端末装置間で行われる処理及びデータの
流れを説明するためのチャート図である。FIG. 20 is a chart for explaining the work performed by each worker, the processing performed between the server-side terminal device and the client-side terminal device, and the flow of data.
【図21】各作業者が行う作業及びサーバ側端末装置と
クライアント側端末装置間で行われる処理の流れを説明
するためのチャート図である。FIG. 21 is a chart for explaining the work performed by each worker and the flow of processing performed between the server-side terminal device and the client-side terminal device.
【図22】各作業者が行う作業及びサーバ側端末装置と
クライアント側端末装置間で行われる処理の流れを説明
するためのチャート図である。FIG. 22 is a chart for explaining the work performed by each worker and the flow of processing performed between the server-side terminal device and the client-side terminal device.
【図23】申請者の入力データに基づいて権限データベ
ースが作成された状態を示す図である。FIG. 23 is a diagram showing a state in which an authority database is created based on input data of an applicant.
【図24】申請者の次の手続順序の権限者による作業が
なされ、権限データベースが更新された状態を示す図で
ある。FIG. 24 is a diagram showing a state in which work has been performed by an authority in the order of the applicant's next procedure and the authority database has been updated.
【図25】全ての権限者による作業がなされ、権限デー
タベースが更新された状態を示す図である。FIG. 25 is a diagram showing a state in which work has been performed by all authorized persons and the authority database has been updated.
【図26】申請者からの確認データに基づいて基権限デ
ータベースが更新され、進行状態表が全て記載された状
態を示す図である。FIG. 26 is a diagram showing a state in which the basic authority database has been updated based on confirmation data from the applicant, and a progress status table has been completely written.
【図27】申請者の申請がいずれかの権限者により否認
された場合について説明する図である。FIG. 27 is a diagram illustrating a case where an application of the applicant is rejected by any authority.
【図28】申請者の申請がいずれかの権限者により否認
された場合について説明する図である。FIG. 28 is a diagram illustrating a case where an application of the applicant is rejected by any authority.
【図29】申請者の申請内容の一部がいずれかの権限者
により否認された場合について説明する図である。FIG. 29 is a diagram illustrating a case where a part of the application content of the applicant is rejected by any authority.
【図30】申請者の申請内容の一部がいずれかの権限者
により否認された場合について説明する図である。FIG. 30 is a diagram illustrating a case where a part of the application content of the applicant is rejected by any authority.
【図31】依頼元企業と依頼先企業とでデータベースを
共有している状態について説明する図である。FIG. 31 is a diagram illustrating a state where a database is shared between a requesting company and a requested company.
【図32】本発明の概要を説明する図であり、ある社員
が文具購買を申請する場合に企業内及び企業間で行われ
る処理について説明するための図である。FIG. 32 is a diagram illustrating an outline of the present invention, and is a diagram for describing processing performed within a company and between companies when a certain employee applies for stationery purchase.
【図33】ある社員が文具購買を申請する場合に企業内
及び企業間で行われる処理についての発明者の分析結果
を示す流れ図である。FIG. 33 is a flowchart showing an analysis result of the inventor on a process performed in a company and between companies when a certain employee applies for stationery purchase.
1 サーバ側端末装置 2,3 クライアント側端末装置 2(2A,2B,2C,2D,・・2n) 依頼元端末
装置 3(3A,3B,3C,3D,・・3n) 依頼先端末
装置 4 通信網 11 制御部 12 外部記憶部 13 送受信部 14 表示部 15 操作入力部 21 制御部(CPU) 22 外部記憶部 23 送受信部 24 表示部 25 操作入力部1 server side terminal device 2, 3 client side terminal device 2 (2A, 2B, 2C, 2D,... 2n) requesting terminal device 3 (3A, 3B, 3C, 3D,... 3n) requesting terminal device 4 communication Network 11 control unit 12 external storage unit 13 transmission / reception unit 14 display unit 15 operation input unit 21 control unit (CPU) 22 external storage unit 23 transmission / reception unit 24 display unit 25 operation input unit
───────────────────────────────────────────────────── フロントページの続き (72)発明者 猪谷 亘 東京都中央区日本橋箱崎町24番1号 アッ トワーク株式会社内 (72)発明者 平塚 百代 東京都中央区日本橋箱崎町24番1号 アッ トワーク株式会社内 (72)発明者 小金 綾子 東京都中央区日本橋箱崎町24番1号 アッ トワーク株式会社内 (72)発明者 坪井 有子 東京都中央区日本橋箱崎町24番1号 アッ トワーク株式会社内 Fターム(参考) 5B049 CC32 FF03 FF09 GG04 GG06 GG08 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Wataru Inotani 24-1, Nihonbashi-Hakozakicho, Chuo-ku, Tokyo Inside Atwork Co., Ltd. Inside (72) Inventor Ayako Kogane 24-1, Nihonbashi-Hakozakicho, Chuo-ku, Tokyo Atwork Inc. (72) Inventor Yuko Tsuboi Inside 24-1, Nihonbashi-Hakozakicho, Chuo-ku, Tokyo Atwork Inc. F term (reference) 5B049 CC32 FF03 FF09 GG04 GG06 GG08
Claims (16)
請事項について手続を行う複数の企業内の複数の権限者
による各手続を経て、当該申請事項についての最終結果
が前記申請者に受領されるまでの各手続についての進行
状態を、データベースを管理するサーバ側端末装置と、
前記申請者及び前記権限者により操作され、前記サーバ
側端末装置に対するデータの送受信が可能なクライアン
ト側端末装置とを用いて管理するビジネスプロセス管理
システムであって、 前記クライアント側端末装置は、前記申請者の所属する
企業の構成員によって使用される少なくとも1の依頼元
端末装置と、前記申請者の申請の依頼先となる企業の構
成員によって使用される少なくとも1の依頼先端末装置
とからなり、 前記サーバ側端末装置は、前記申請者からの前記申請事
項についての入力データを受信すると、当該入力データ
及び前記データベースのデータに基づいて、申請事項に
ついての最終結果が前記申請者に受領されるまでの手続
を行う全ての権限者及び当該権限者の手続順序を規定し
た権限一覧表と前記権限一覧表に規定された権限者によ
る手続の進行状態について示す進行状態表とを含む権限
データベースを作成して記憶するとともに、次の手続順
序の権限者宛に手続を行うべき旨の通知を送信し、か
つ、次の手続順序の権限者からの手続完了の旨のデータ
を受信する度に、前記権限データベースを更新するとと
もに、さらに次の手続順序の権限者宛に手続を行うべき
旨の通知を送信することを繰り返し、申請事項について
の最終結果を示すデータを受信すると、前記申請者宛に
当該最終結果についての通知を送信し、前記申請者から
当該最終結果についての確認信号を受信すると、処理を
終了することを特徴とするビジネスプロセス管理システ
ム。[Claim 1] With respect to an application by an applicant, through each procedure by a plurality of authorities in a plurality of companies that perform procedures for the application, until the final result of the application is received by the applicant. A server-side terminal device that manages the progress status of each procedure of the database,
A business process management system that is operated by the applicant and the authorized person and manages using a client-side terminal device capable of transmitting and receiving data to and from the server-side terminal device, the client-side terminal device comprising: At least one requesting terminal device used by a member of the company to which the applicant belongs, and at least one requesting terminal device used by a member of the company to which the applicant applies for the application, The server-side terminal device, upon receiving the input data on the application matter from the applicant, based on the input data and the data of the database, until a final result on the application matter is received by the applicant. A list of authorities specifying all the authorities who carry out the above procedures and the order of the relevant authorities, and the authorities listed above And create and store an authority database including a progress table showing the progress of the procedures by the authorized authority, and send a notification to the authority in the next procedure order that the procedure should be performed; and Whenever the data of the completion of the procedure is received from the authority of the order of the procedure, the authority database is updated, and further, a notification that the procedure should be performed is transmitted to the authority of the next procedure. Repeatedly, upon receiving data indicating the final result of the application matter, transmitting a notification about the final result to the applicant, and ending the process upon receiving a confirmation signal about the final result from the applicant. Business process management system.
の権限者からの手続完了の旨のデータを受信する度に、
当該手続が完了した旨を前記進行状態表に記載して前記
権限データベースを更新することを特徴とする請求項1
記載のビジネスプロセス管理システム。2. The server-side terminal device receives the data indicating the completion of the procedure from the authority in the next procedure order every time
2. The system according to claim 1, further comprising the step of updating the authority database by writing the completion of the procedure in the progress table.
Business process management system described.
よる申請内容に応じた権限者の選定ルールについてのデ
ータを予め格納し、前記入力データを受信すると、前記
選定ルールに基づいて権限一覧表を作成することを特徴
とする請求項1又は2記載のビジネスプロセス管理シス
テム。3. The server-side terminal device stores in advance data on an authority selection rule according to the content of an application by the applicant, and upon receiving the input data, an authority list based on the selection rule. 3. The business process management system according to claim 1, wherein
る情報及び各作業者に関する情報が記載されることを特
徴とする請求項1乃至3のいずれか1記載のビジネスプ
ロセス管理システム。4. The business process management system according to claim 1, wherein the authority database contains information about a company and information about each worker.
び各手続の日時が記載されることを特徴とする請求項1
乃至4のいずれか1記載のビジネスプロセス管理システ
ム。5. The progress table according to claim 1, wherein at least application and date and time of each procedure are described.
A business process management system according to any one of claims 1 to 4.
うちのいずれかからの、申請を否認する旨の申請否認デ
ータを受信すると、前記進行状態表の記載を所定の更新
前の状態まで戻すとともに、その旨を前記申請者及び/
又は更新前の状態の手続順序の権限者宛に通知すること
を特徴とする請求項1乃至5のいずれか1記載のビジネ
スプロセス管理システム。6. The server-side terminal device, upon receiving application rejection data for rejecting an application from any of the authorized persons, updates the description of the progress status table to a state before a predetermined update. And the applicant and / or
6. The business process management system according to claim 1, wherein a notification is sent to an authorized person of the procedure order in a state before the update.
記権限者からの、申請を一部否認する旨の申請一部否認
データを受信すると、その旨を、前記進行状態表に記載
して少なくとも前記申請者宛に通知するとともに、前記
申請一部否認データに応じて前記入力データを変更する
ことを特徴とする請求項1乃至5のいずれか1記載のビ
ジネスプロセス管理システム。7. The server-side terminal device, upon receiving application partial rejection data for partially rejecting an application from any one of the authorized persons, describes the fact in the progress status table. The business process management system according to any one of claims 1 to 5, wherein at least the notification is sent to the applicant, and the input data is changed according to the application partial denial data.
タベースの作成後には、前記申請者からの前記権限デー
タベースのデータの送信を要求する旨の送信要求データ
を受信すると、当該権限データベースのデータを当該申
請者宛に送信することを特徴とする請求項1乃至7のい
ずれか1記載のビジネスプロセス管理システム。8. When the server-side terminal device receives transmission request data requesting transmission of data of the authority database from the applicant after creating the authority database, the server-side terminal device transmits the data of the authority database. 8. The business process management system according to claim 1, wherein the business process management system transmits the request to the applicant.
らの前記申請事項についての入力データを受信するに先
立って、前記入力データを入力するための雛型について
のデータを前記申請者宛に送信することを特徴とする請
求項1乃至8のいずれか1記載のビジネスプロセス管理
システム。9. The server-side terminal device sends data on a template for inputting the input data to the applicant before receiving input data on the application matter from the applicant. 9. The business process management system according to claim 1, wherein the transmission is performed.
ータベースを更新する度に、当該権限データベースのデ
ータを前記申請者宛に送信することを特徴とする請求項
1乃至9のいずれか1記載のビジネスプロセス管理シス
テム。10. The server-side terminal device according to claim 1, wherein each time the authority database is updated, data of the authority database is transmitted to the applicant. Business process management system.
ータ又は前記手続完了の旨のデータの受信に先立って、
前記申請者又は前記権限者となりうる者についての認証
を行うことを特徴とする請求項1乃至10のいずれか1
記載のビジネスプロセス管理システム。11. The server-side terminal device, prior to receiving the input data or the data indicating the completion of the procedure,
11. The authentication according to claim 1, wherein authentication is performed for the applicant or the potential authority.
Business process management system described.
ータベースのデータを前記申請者宛に送信するに先立っ
て、前記申請者についての認証を行うことを特徴とする
請求項8記載のビジネスプロセス管理システム。12. The business process management according to claim 8, wherein the server-side terminal device authenticates the applicant before transmitting the data of the authority database to the applicant. system.
又は前記権限者となりうる者についての認証情報を予め
格納し、データ入力者についての認証データを受信する
と、受信した前記認証データと予め格納した前記認証情
報とを照合することにより、前記申請者又は前記権限者
となりうる者についての認証を行うことを特徴とする請
求項11又は12記載のビジネスプロセス管理システ
ム。13. The server-side terminal device stores in advance authentication information on the applicant or the person who can be the authorized person, and upon receiving authentication data on a data entry person, stores the received authentication data in advance. 13. The business process management system according to claim 11, wherein the authentication is performed on the applicant or the person who can be the authorized person by comparing the authentication information with the authentication information.
サーバ側端末装置とデータの送受信を行う送受信手段
と、前記送受信手段で前記サーバ側端末装置に送信する
データを入力する操作入力手段と、前記送受信手段で受
信した前記サーバ側端末装置からのデータを表示する表
示手段とを備えたことを特徴とする請求項1乃至13の
いずれか1記載のビジネスプロセス管理システム。14. The client-side terminal device includes: a transmission / reception unit for transmitting / receiving data to / from the server-side terminal device; an operation input unit for inputting data to be transmitted to the server-side terminal device by the transmission / reception unit; 14. The business process management system according to claim 1, further comprising: display means for displaying data from the server-side terminal device received by the means.
ビジネスプロセスを管理するアウトソーシング企業内に
配置されたことを特徴とする請求項1乃至14のいずれ
か1記載の記載のビジネスプロセス管理システム。15. The business process management system according to claim 1, wherein the server-side terminal device is disposed in an outsourcing company that manages a business process between companies. .
体携帯端末装置であることを特徴とする請求項1乃至1
5のいずれか1記載の記載のビジネスプロセス管理シス
テム。16. The terminal device according to claim 1, wherein the client terminal device is a mobile portable terminal device.
5. The business process management system according to any one of 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000220481A JP2002041741A (en) | 2000-07-21 | 2000-07-21 | Business process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000220481A JP2002041741A (en) | 2000-07-21 | 2000-07-21 | Business process management system |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002041741A true JP2002041741A (en) | 2002-02-08 |
Family
ID=18715087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000220481A Pending JP2002041741A (en) | 2000-07-21 | 2000-07-21 | Business process management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002041741A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009230447A (en) * | 2008-03-24 | 2009-10-08 | Meidensha Corp | Power interruption plan management system and power interruption plan management method |
CN107274078A (en) * | 2017-06-02 | 2017-10-20 | 深圳齐心集团股份有限公司 | A kind of stationery management system based on big data |
WO2018218675A1 (en) * | 2017-06-02 | 2018-12-06 | 深圳齐心集团股份有限公司 | Big data-based stationery management system |
CN113010877A (en) * | 2020-12-31 | 2021-06-22 | 国网浙江省电力有限公司信息通信分公司 | Permission adjusting method and device suitable for SAP system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08161395A (en) * | 1994-12-09 | 1996-06-21 | Toshiba Corp | Electronic approving device |
JPH1049598A (en) * | 1996-08-02 | 1998-02-20 | N T T Data Tsushin Kk | Electronic decision system and work flow service system |
JPH1049603A (en) * | 1996-08-06 | 1998-02-20 | Hitachi Ltd | Work flow management system |
JPH10340300A (en) * | 1997-06-09 | 1998-12-22 | Oki Electric Ind Co Ltd | Work flow management device |
JPH11250152A (en) * | 1998-02-27 | 1999-09-17 | Osk:Kk | Electronic approval system and recording medium recorded with program for the system |
JP2000132596A (en) * | 1998-10-21 | 2000-05-12 | Ntt Data Corp | Electronic trade transaction system and center therefor |
-
2000
- 2000-07-21 JP JP2000220481A patent/JP2002041741A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08161395A (en) * | 1994-12-09 | 1996-06-21 | Toshiba Corp | Electronic approving device |
JPH1049598A (en) * | 1996-08-02 | 1998-02-20 | N T T Data Tsushin Kk | Electronic decision system and work flow service system |
JPH1049603A (en) * | 1996-08-06 | 1998-02-20 | Hitachi Ltd | Work flow management system |
JPH10340300A (en) * | 1997-06-09 | 1998-12-22 | Oki Electric Ind Co Ltd | Work flow management device |
JPH11250152A (en) * | 1998-02-27 | 1999-09-17 | Osk:Kk | Electronic approval system and recording medium recorded with program for the system |
JP2000132596A (en) * | 1998-10-21 | 2000-05-12 | Ntt Data Corp | Electronic trade transaction system and center therefor |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009230447A (en) * | 2008-03-24 | 2009-10-08 | Meidensha Corp | Power interruption plan management system and power interruption plan management method |
CN107274078A (en) * | 2017-06-02 | 2017-10-20 | 深圳齐心集团股份有限公司 | A kind of stationery management system based on big data |
WO2018218675A1 (en) * | 2017-06-02 | 2018-12-06 | 深圳齐心集团股份有限公司 | Big data-based stationery management system |
CN113010877A (en) * | 2020-12-31 | 2021-06-22 | 国网浙江省电力有限公司信息通信分公司 | Permission adjusting method and device suitable for SAP system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6996601B1 (en) | Process for managing change within an enterprise | |
US6954737B2 (en) | Method and apparatus for work management for facility maintenance | |
US7181420B2 (en) | Methods and systems for online self-service receivables management and automated online receivables dispute resolution | |
JP5160860B2 (en) | Purchasing business system, purchasing business processing method, and purchasing business processing program | |
US20050080649A1 (en) | Systems and methods for automating the capture, organization, and transmission of data | |
JP2002526819A (en) | Cross application timesheet | |
US20020147626A1 (en) | System for and method of implementing a shared strategic plan of an organization | |
EP2915065A1 (en) | Systems and methods for collecting, classifying, organizing and populating information on electronic forms | |
Hadikusumo et al. | Construction material procurement using internet-based agent system | |
US20030065519A1 (en) | Method and system for generating legal agreements | |
JP4292342B2 (en) | Approval route determination method and program in electronic approval system | |
KR100339643B1 (en) | System and method for trading business management in Internet web | |
US20060293960A1 (en) | Interoperable account junctions and omnicompetent value trusts | |
JP2020166855A (en) | Matching support system, server, and matching support method | |
KR20070024140A (en) | System of searching and managing work process and work process map, and method thereof | |
JP2002041741A (en) | Business process management system | |
JP4262655B2 (en) | Workflow system and workflow system management method | |
JP4887735B2 (en) | Information processing apparatus, information processing system, and program | |
JP2003323531A (en) | Application data processing device | |
JP4056253B2 (en) | Business processing support system, server device, and recording medium on which server program is recorded | |
JPH10187859A (en) | Business processing method, system and device, and storage medium storing business processing program | |
JP7082435B2 (en) | Information input system | |
JP5655456B2 (en) | Contract information processing apparatus, contract information processing method, and contract information processing system | |
KR100920798B1 (en) | Managing system for total providers | |
JP6541850B2 (en) | Labor property information management apparatus, method, and computer program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20050810 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050810 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070720 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100208 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100216 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100416 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20100518 |