CN206783321U - 一种超高温石墨化炉 - Google Patents

一种超高温石墨化炉 Download PDF

Info

Publication number
CN206783321U
CN206783321U CN201621486797.1U CN201621486797U CN206783321U CN 206783321 U CN206783321 U CN 206783321U CN 201621486797 U CN201621486797 U CN 201621486797U CN 206783321 U CN206783321 U CN 206783321U
Authority
CN
China
Prior art keywords
furnace
level preheating
graphitizing
preheating furnace
stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621486797.1U
Other languages
English (en)
Inventor
闵永刚
齐方亚
刘屹东
杨文斌
何婷婷
翁立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huimai Material Technology (Guangdong) Co.,Ltd.
Original Assignee
Nanjing Xinyue Material Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Xinyue Material Science & Technology Co Ltd filed Critical Nanjing Xinyue Material Science & Technology Co Ltd
Priority to CN201621486797.1U priority Critical patent/CN206783321U/zh
Application granted granted Critical
Publication of CN206783321U publication Critical patent/CN206783321U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon And Carbon Compounds (AREA)
  • Furnace Details (AREA)

Abstract

本实用新型公开一种超高温石墨化炉,包括通过运料轨道依次连接的送料系统、一级预热炉、二级预热炉、炭化炉、石墨化炉、冷却炉以及收料系统;并在一级预热炉、二级预热炉、炭化炉、石墨化炉一级冷却炉中相邻两个炉之间设置保温密封系统,将相邻两个炉密封隔绝,用于分别对一级预热炉内、所述二级预热炉内、所述炭化炉内、所述石墨化炉内通入氮气或氩气。利用阶段性升降温,降低了石墨化过程中降温消耗的时间,而且利用进出料系统使得石墨化过程能连续进行,整个工艺实施过程无需频繁停炉以进行物料的冷却和取放,工艺流程连续高效,并使得整个碳化加工过程更加稳定可靠,产品规格适应性强,无需后续拼接等操作,大大提高了产品利用率和适用性。

Description

一种超高温石墨化炉
技术领域
本实用新型涉及一种超高温石墨化炉,属于高温加热装置。
背景技术
超高温石墨化炉广泛用于碳纤维、鳞片石墨、碳材料结构件(制品)、C/C复合材料制品、碳素材料和其他石墨材料的高温石墨化。目前在超高温石墨化过程中往往采用的是间歇式过程,效率低下,而且超高温炉升降温的范围大,耗时耗能。
实用新型内容
针对上述问题本实用新型将高温炉划分为不同的升温区间,缩短了升温范围,减小了大范围降温造成的时间的浪费,提高了石墨化效率。
为此,本实用新型提供一种超高温石墨化炉,包括通过运料轨道依次连接的送料系统、一级预热炉、二级预热炉、炭化炉、石墨化炉、冷却炉以及收料系统;并在所述一级预热炉、所述二级预热炉、所述炭化炉、所述石墨化炉、所述冷却炉中相邻两个炉之间设置保温密封系统,将相邻两炉密封隔绝;并分别用于对所述一级预热炉内、所述二级预热炉内、所述炭化炉内、所述石墨化炉内通入氮气或氩气。
优选地,一级预热炉、二级预热炉、炭化炉、石墨化炉、冷却炉各炉之间通过保温密封系统相互密封隔绝。
优选地,保温密封系统中用的隔热保温材料为陶瓷纤维材料、石墨碳毡、石墨箔及碳碳复合材料中任意一种。
优选地,一级预热炉、二级预热炉、炭化炉炉中通过注气通道、排气通 道通入N2进行保护。
优选地,石墨化炉、冷却炉炉中通过注气通道、排气通道通入Ar2进行保护。
优选地,石墨化可以通过送料系统、运料轨道、收料系统实现自动进料过程。
优选地,加热棒材料为钼丝或石墨棒
优选地,一级预热炉、二级预热炉、炭化炉的加热温度区间是室温-2300℃,石墨化炉加热温度区间是室温-3200℃。
本实用新型设计了进出料系统,实现进出料的快速进行。并且设计了运料轨道,无论是片材还是粉末都能实现进出料过程。
本实用新型在内壳体与外壳体之间设计了具有容纳冷却水的冷却水通道,能够实现对高温炉的快速降温过程。
本实用新型创新性的通过在炉内运输材料,避免了热量过多的损失,产生的能源的浪费。
本实用新型设计了氮气和氩气保护系统,提高了石墨化的效率和产品的质量。
本实用新型设计与超高温石墨化工艺相结合,通过实验设备实现送料、预热1、预热2、碳化、石墨化、冷却和收料工艺步骤,整个工艺实施过程无需频繁停炉以进行物料的冷却和取放,工艺流程连续高效,并使得整个碳化加工过程更加稳定可靠,且产品规格适应性强,无需后续拼接等操作,大大提高了产品利用率和适用性。
附图说明
附图1为本次实用新型的一个参考实例示意图。
附图1中,1-一级预热炉;2-保温密封系统;3-二级预热炉;4-炭化炉;5-石墨化炉;6-冷却炉;7-送料系统;8-运料轨道;9-炉体;10-石墨化样品;11-加热棒;12-水道;13-注气通道;14-排气通道;15-保温密封板;16-收料系统。
具体实施方式
本实用新型的核心是与石墨化工艺相结合而提供一种超高温石墨化设备,该超高温石墨化设备的超高温石墨化加工过程较为连续高效。
为了使本技术领域的人员更好地理解本实用新型方案,下面结合附图来进一步详细说明具体实施方案。
本实用新型石墨化样品10由送料系统7送料系统,通过运料轨道8原料通道到达一级预热炉1,炉内设置加热棒11,一级预热炉1关闭保温密封系统2通入氮气保护,在一级预热炉1中加热由室温到达1200℃,之后打开保温密封系统2;进入二级预热炉3中加热由1200到1500℃;到炭化炉4碳化炉中加热保温由1500到1800℃实现碳化过程;之后进入石墨化炉5,温度由1800至2850℃,通入氦保护气,在超高温的环境下实现碳材料结构的变化,由sp3变为sp2过程,最后进入冷却炉6冷却炉冷却至室温;通过收料系统16收集石墨化产品。
保温密封系统中设置保温密封板15,一级预热炉包括炉体9,设置在炉体内的加热棒11。
本实用新型将加热过程分为几个阶段,使得各炉子不需要降温至室温,减小升降温区间。由于在超高温加热过程是十分缓慢的,通过缩短炉子的升降温区间,大大缩减了加热所消耗的时间。因此本设计具有很高的工作效率。
本实用新型中通过送料系统,当材料进入下一级炉子时,由上一级的炉子中的材料进行补充,能够保证各个炉子都能够得到不停的应用,使得能够连续工作。
本实用新型通过水道12水循环通道,可以快速将各高温炉降至特定的加热初始温度,可以根据材料性能,设计不同工艺,实现在不同加热温度区间的调整,和设计特定不同阶段的加热速率与保温时间。
本实用新型设计在各个炉体9上设计有注气通道13、排气通道14进出气口,通过外连接进出气系统,可以实现不同惰性气体保护的要求。
在一级预热炉1与二级预热炉3之间,和二级预热炉3与炭化炉4之间的保温密封系统2中的密封和保温材料选用的是特种钢材料;在炭化炉4与石墨化炉5,和石墨化炉5与冷却炉6之间的保温密封系统2中密封和保温材料需要承受3200℃的温度所以选用的是石墨材料。

Claims (4)

1.一种超高温石墨化炉,其特征在于:包括通过运料轨道(8)依次连接的送料系统(7)、一级预热炉(1)、二级预热炉(3)、炭化炉(4)、石墨化炉(5)、冷却炉(6)以及收料系统(16);并在所述一级预热炉(1)、所述二级预热炉(3)、所述炭化炉(4)、所述石墨化炉(5)、所述冷却炉(6)中相邻两个炉之间设置保温密封系统,将相邻两炉密封隔绝;并分别用于对所述一级预热炉(1)内、所述二级预热炉(3)内、所述炭化炉(4)内、所述石墨化炉(5)内通入氮气或氩气。
2.根据权利要求1所述的超高温石墨化炉,其特征在于:所述保温密封系统(2)中用的隔热保温材料为陶瓷纤维材料、石墨碳毡、石墨箔及碳碳复合材料中任意一种。
3.根据权利要求1所述的超高温石墨化炉,其特征在于:所述一级预热炉、二级预热炉、炭化炉以及石墨化炉中的任一个炉上开设注气通道(13)和排气通道(14),与该所述炉对应的所述保温密封系统通过所述注气通道(13)向该所述炉内通入所述氮气或氩气。
4.根据权利要求1-3中任一项所述的超高温石墨化炉,其特征在于,所述一级预热炉内设有加热棒;所述加热棒为钼丝或石墨棒。
CN201621486797.1U 2016-12-31 2016-12-31 一种超高温石墨化炉 Active CN206783321U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621486797.1U CN206783321U (zh) 2016-12-31 2016-12-31 一种超高温石墨化炉

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621486797.1U CN206783321U (zh) 2016-12-31 2016-12-31 一种超高温石墨化炉

Publications (1)

Publication Number Publication Date
CN206783321U true CN206783321U (zh) 2017-12-22

Family

ID=60704525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621486797.1U Active CN206783321U (zh) 2016-12-31 2016-12-31 一种超高温石墨化炉

Country Status (1)

Country Link
CN (1) CN206783321U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751184A (zh) * 2018-08-21 2018-11-06 北京中石伟业科技股份有限公司 一种石墨导热膜碳化和石墨化连续生产系统及方法
CN113074835A (zh) * 2021-04-02 2021-07-06 西安理工大学 一种石墨炭化系统智能电子监测终端
CN113091816A (zh) * 2021-04-02 2021-07-09 西安理工大学 一种基于物联网的石墨炭化系统的数据采集系统

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751184A (zh) * 2018-08-21 2018-11-06 北京中石伟业科技股份有限公司 一种石墨导热膜碳化和石墨化连续生产系统及方法
CN113074835A (zh) * 2021-04-02 2021-07-06 西安理工大学 一种石墨炭化系统智能电子监测终端
CN113091816A (zh) * 2021-04-02 2021-07-09 西安理工大学 一种基于物联网的石墨炭化系统的数据采集系统

Similar Documents

Publication Publication Date Title
CN206783321U (zh) 一种超高温石墨化炉
CN101451279B (zh) 一种新型复合高温碳化炉
CN104555990A (zh) 一种碳化石墨化连续型高温炉及使用方法
US11029090B2 (en) Industrial furnace and method of utilizing heat therefrom
CN106744917A (zh) 一种超高温石墨化炉
CN102797075A (zh) 连续石墨化超高温管式炉
CN209960963U (zh) 热处理窑炉
CN203216257U (zh) 一种氮化钒微波、电混合加热合成烧成推板窑
CN108018474A (zh) 一种用偏钒酸铵连续化制备氮化钒的方法
CN106288767B (zh) 一种碳碳复合材料高温连续加热炉
CN201772726U (zh) 一种钒氮合金生产专用高温高真空烧结炉
CN203699918U (zh) 一种碳化石墨化连续型高温炉
CN216115333U (zh) 一种对推式节能窑炉
CN206457419U (zh) 一种碳碳复合材料加工设备及系统
CN103105060B (zh) 一种氮化钒微波、电混合加热合成烧成推板窑
CN113983810A (zh) 一种对推式节能窑炉
CN108120287A (zh) 一种薄板推进式静态烧成窑炉
CN209974308U (zh) 一种用于石墨烯连续制备的微波还原膨化设备
CN104451204A (zh) 一种废汞触媒汞回收干馏装置
CN210826466U (zh) 一种提高预氧化炉温场均匀性的装置
CN109970051B (zh) 一种用于石墨烯连续制备的微波还原膨化设备
CN206019284U (zh) 一种碳碳复合材料高温连续加热炉
CN206974174U (zh) 一种节能工业电炉
CN206019285U (zh) 一种全封闭气体保护阶梯温度加热炉
CN109506459A (zh) 一种加热炉

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210318

Address after: No. 201-2, Hongling Road, Xiaotang, Shishan nonferrous metal Park, Nanhai District, Foshan City, Guangdong Province, 528000

Patentee after: Huimai Material Technology (Guangdong) Co.,Ltd.

Address before: Zijin kechuangkao special community, No.3 Hengda Road, Xingang Development Zone, Qixia District, Nanjing City, Jiangsu Province, 210038

Patentee before: NANJING XINYUE MATERIAL SCIENCE & TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An ultra high temperature graphitization furnace

Effective date of registration: 20210511

Granted publication date: 20171222

Pledgee: Shunde Guangdong rural commercial bank Limited by Share Ltd. Daliang branch

Pledgor: Huimai Material Technology (Guangdong) Co.,Ltd.

Registration number: Y2021980003464

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220622

Granted publication date: 20171222

Pledgee: Shunde Guangdong rural commercial bank Limited by Share Ltd. Daliang branch

Pledgor: Huimai Material Technology (Guangdong) Co.,Ltd.

Registration number: Y2021980003464

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An ultra high temperature graphitization furnace

Effective date of registration: 20220623

Granted publication date: 20171222

Pledgee: Guangdong Shunde Rural Commercial Bank Co.,Ltd. science and technology innovation sub branch

Pledgor: Huimai Material Technology (Guangdong) Co.,Ltd.

Registration number: Y2022980008663