Phadke et al., 2017 - Google Patents
Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM)Phadke et al., 2017
View PDF- Document ID
- 2707361669453762858
- Author
- Phadke V
- Titirmare N
- Publication year
- Publication venue
- International Journal of Civil Engineering (IJCE)
External Links
Snippet
Tunnels have played a vital role in the evolution and Sustenance of man-kind through the ages. History has seen the evolution of tunneling starting with cave formation, for water management, under ground transportation, mineral extraction and for warfare purposes …
- 238000010276 construction 0 title abstract description 42
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C25/00—Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Maidl et al. | Mechanised shield tunnelling | |
Phadke et al. | Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM) | |
US11591908B2 (en) | Method and system of constructing an underground tunnel | |
CN105317459A (en) | Subarea filling method used for controlling large-area falling disaster of hard roof | |
CN111997639B (en) | Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine | |
Goel | Experiences and lessons from the use of TBM in the Himalaya–A review | |
CN113803074A (en) | Construction method of tunnel structure for artificial and mechanical combined obstacle removal of water-rich sand layer | |
Hansen | The history of TBM tunnelling in Norway | |
Clarke et al. | OVERCOMING GROUND DIFFICULTIES AT TOOTING BEC.(WINNER OF 1995 TELFORD MEDAL). | |
Hulme et al. | Bored tunneling for Singapore metro | |
Prakash et al. | Associated Risk and Rectification during TBM Tunnelling [J] | |
Underwood | Machine tunneling on Missouri River dams | |
Klados | Experiences with hard rock shielded TBMs in special conditions | |
Zou et al. | Mechanical Underground Excavation in Rock | |
Peila et al. | Construction methods | |
Klenowski et al. | Development of support systems for longwall mining in the Bowen Basin, Central Queensland | |
Çopur | Overview of roadheader applications in Turkish mining and civil construction industries | |
Sandbak et al. | Ground support strategies for weak ground masses at the Turquoise Ridge Joint Venture, Nevada | |
Zhu et al. | Protection of Ground Buildings (Structures) and Treatment Technologies of Underground Obstacles | |
Ujlayan et al. | Tunnelling Experiences on Jammu-Udhampur Rail Link | |
Thorpe | Design and construction of a sprayed-concrete-lined quarry tunnel in the UK | |
Kadkade | Techniques of Excavation and New Equipment for Tunnelling | |
BADURDEEN et al. | Large diameter pipe roof box excavation for passenger linkway tunnel | |
Sunuwar | Challenges of shaft excavation in Nepal Himalaya: case study from hydropower projects | |
Friant et al. | Pipetron Tunnel Construction Issues |