Zou, 2016 - Google Patents
Mechanical Underground Excavation in RockZou, 2016
- Document ID
- 9219922644080782663
- Author
- Zou D
- Publication year
- Publication venue
- Theory and Technology of Rock Excavation for Civil Engineering
External Links
Snippet
Mechanical methods for underground excavation have the most advantage of less disturbance to the surround environment, especially in the urban area and complex ground conditions. Drilling and Breaking method, roadheader, raise boring machines, tunnel and …
- 238000009412 basement excavation 0 title abstract description 54
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/003—Drilling with mechanical conveying means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Portable drilling rigs, truck-or skid-mounted, with their own drive
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hartman et al. | SME mining engineering handbook | |
Maidl et al. | Mechanised shield tunnelling | |
Maidl et al. | Hardrock tunnel boring machines | |
CN103835661B (en) | A kind of local excavation pre support mine shaft rising boring technique | |
Bäppler | New developments in TBM tunnelling for changing grounds | |
CN110656947A (en) | Method for tunneling raised section of seabed bedrock | |
Phadke et al. | Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM) | |
Zou et al. | Mechanical Underground Excavation in Rock | |
Dammyr | Pressurized TBM-shield tunneling under the subsidence sensitive grounds of Oslo: possibilities and limitations | |
Warren et al. | Comparison of earth pressure balance and slurry tunnel boring machines used for tunnelling in chalk | |
Grasso et al. | Construction methods | |
Singh | Design and analysis of a micro tunnel boring machines (TBM) | |
Visser | Shaft sinking methods based on the townlands ore replacement project-rise boring | |
Ferreira | Mechanised mine development utilising rock cutting and boring through raise and blind boring techniques | |
Çopur | Overview of roadheader applications in Turkish mining and civil construction industries | |
Ergun et al. | Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul | |
Robbins | Machine tunnelling in the twenty-first century | |
Meyer | Tunnel Boring in highly fractured ground | |
Gagné et al. | Tunnel Boring below Montreal: A Case Study of Urban Tunneling through Hard Limestone | |
Bennet et al. | Tunnels | |
Sunuwar | Challenges of shaft excavation in Nepal Himalaya: case study from hydropower projects | |
Mathy et al. | TBM vs. MTBM: Geotechnical considerations | |
Bäckblom et al. | KBS-3H-Excavation of two horizontal drifts at the Aespoe Hard Rock Laboratory during year 2004-2005. Work description, summary of results and experience | |
Herrenknecht | The Role of Slurry Microtunnelling for Pipeline Installations in Hard Rock Conditions | |
Zhu et al. | Risks and Solutions of Shield Tunneling in Strata with Boulders |