Zhou et al., 2021 - Google Patents
A BIM-based identification and classification method of environmental risks in the design of Beijing subwayZhou et al., 2021
View PDF- Document ID
- 16523301217631674084
- Author
- Zhou M
- Tang Y
- Jin H
- Zhang B
- Sang X
- Publication year
- Publication venue
- Journal of Civil Engineering and Management
External Links
Snippet
The subway project safety risk management in China covers design and construction stages. The traditional method for identifying construction safety risks at the design stage requires that engineers work backward, and it relies on engineers having an accurate …
- 238000010276 construction 0 abstract description 112
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/34—Pipes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sharafat et al. | BIM-based tunnel information modeling framework for visualization, management, and simulation of drill-and-blast tunneling projects | |
Zhou et al. | Building information modelling review with potential applications in tunnel engineering of China | |
Li et al. | An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM | |
Ding et al. | Safety risk identification system for metro construction on the basis of construction drawings | |
Zhou et al. | A BIM-based identification and classification method of environmental risks in the design of Beijing subway | |
Zhou et al. | Developing a versatile subway construction incident database for safety management | |
CN106202723A (en) | A kind of BIM subway work method | |
CN112989532A (en) | BIM-based construction method for changing municipal pipeline of subway station | |
Lin et al. | Automating closed-loop structural safety management for bridge construction through multisource data integration | |
CN112685820A (en) | Digital power station delivery method, medium and equipment based on BIM and GIS | |
Chen et al. | Integrating knowledge management and BIM for safety risk identification of deep foundation pit construction | |
Liu et al. | BIM-based digital platform and risk management system for mountain tunnel construction | |
Luo et al. | A sustainable BIM-based multidisciplinary framework for underground pipeline clash detection and analysis | |
Xiahou et al. | Automatic identification and quantification of safety risks embedded in design stage: a BIM-enhanced approach | |
Xiaer et al. | Design for safety (DFS) and building information modeling (BIM): A review | |
Zhang et al. | A risk assessment method for metro shield tunnel construction based on interval number | |
CN112131692A (en) | Gas pipeline construction method | |
CN102880918A (en) | Deep foundation pit risk assessment method based on data fusion analysis | |
Zhang et al. | Wireless monitoring–based real-time analysis and early-warning safety system for deep and large underground caverns | |
CN117932945B (en) | Visual subway engineering simulation system based on slurry shield BIM technology | |
Meng et al. | Virtual construction technology of tunnel engineering based on BIM platform and measuring robot | |
Wang et al. | A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns | |
CN106651186A (en) | City planning management control processing method and system | |
Tang et al. | Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real‐Time Model | |
CN110634186A (en) | Arch cover method underground excavation construction method based on BIM |