A risk assessment method for metro shield tunnel construction based on interval numberZhang et al., 2020
- Document ID
- 6565485654069304069
- Author
- Zhang Y
- Zhang J
- Guo H
- Zhou Y
- Ma G
- Wang C
- Publication year
- Publication venue
- Geotechnical and Geological Engineering
External Links
Snippet
In recent years, metro construction is flourishing in China. In the construction process of the metro shield tunnel, there are various complex potential risk factors fraught with many uncertainties. Therefore, it is crucial to conduct a risk assessment on urban metro shield …
- 238000010276 construction 0 title abstract description 46
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM | |
Yan et al. | Risk assessment for construction of urban rail transit projects | |
Ding et al. | Safety risk identification system for metro construction on the basis of construction drawings | |
Qian et al. | Safety risk management of underground engineering in China: Progress, challenges and strategies | |
Cheng et al. | Analytical review and evaluation of civil information modeling | |
Zhou et al. | Building information modelling review with potential applications in tunnel engineering of China | |
Zhang et al. | Real-time safety risk identification model during metro construction adjacent to buildings | |
Song et al. | Bi‐objective mountain railway alignment optimization incorporating seismic risk assessment | |
Pan et al. | Research on coupling degree model of safety risk system for tunnel construction in subway shield zone | |
Zhang et al. | A risk assessment method for metro shield tunnel construction based on interval number | |
Xiang et al. | Assessment of vulnerability to waterlogging in subway stations using integrated EWM-TOPSIS | |
Lin et al. | An extended TODIM-based model for evaluating risks of excavation system | |
Jiao et al. | Resilience assessment of metro stations against rainstorm disaster based on cloud model: a case study in Chongqing, China | |
Luo et al. | Research on Construction Safety Risk Assessment of New Subway Station Close‐Attached Undercrossing the Existing Operating Station | |
Moshtaghian et al. | Integration of risk management within the building information modeling (BIM) framework | |
Zhou et al. | A BIM-based identification and classification method of environmental risks in the design of Beijing subway | |
Li et al. | Managing safety hazards in metro subway projects under complex environmental conditions | |
Chen et al. | Research on the impact of underground excavation metro on surface traffic safety and assessment method | |
Romanova et al. | Management and monitoring of urban environment in the integrated development of underground space | |
Wang et al. | A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns | |
Sihombing et al. | Risk identification in tunnel construction project: A literature review | |
Wang et al. | Risk Assessment of EPB Shield Construction Based on the Nonlinear FAHP Method | |
Lei | Risk assessment model of underground engineering based on Delphi-AHP | |
Guo et al. | Coupling Simulation of Human-Environmental Safety Risk Factors in Metro Construction–a Case Study of Rongjiazhai Station at Xi’an Metro Line 5 in China | |
ZAKU et al. | Decision Tree Analysis in Project Risk Management: A Systematic Review |