CN106651186A - City planning management control processing method and system - Google Patents
City planning management control processing method and system Download PDFInfo
- Publication number
- CN106651186A CN106651186A CN201611227446.3A CN201611227446A CN106651186A CN 106651186 A CN106651186 A CN 106651186A CN 201611227446 A CN201611227446 A CN 201611227446A CN 106651186 A CN106651186 A CN 106651186A
- Authority
- CN
- China
- Prior art keywords
- land use
- planning
- key element
- planned land
- restricted area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 18
- 238000003672 processing method Methods 0.000 title claims abstract description 9
- 230000000007 visual effect Effects 0.000 claims abstract description 8
- 238000012800 visualization Methods 0.000 claims description 31
- 238000012545 processing Methods 0.000 claims description 7
- 238000007689 inspection Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 5
- 238000013461 design Methods 0.000 description 11
- 230000002093 peripheral effect Effects 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a city planning management control processing method and system. The method comprises the steps of obtaining a planning land and all surrounding elements of the planning land; obtaining corresponding surrounding element boundaries according to regulations of the surrounding elements so as to obtain a planning region, a limited region and an unlimited region of the planning land; and dividing the unlimited region into a plurality of small regions, then obtaining corresponding controlled building heights of the small regions according to the distances between the small regions and the surrounding element boundaries, and finally generating three-dimensional visual graphs with the corresponding controlled building heights in a visual modeling mode by the small regions. According to the method and the system, the regions of the planning land are defined and are represented through the three-dimensional visual graphs, so that an existing building planning scheme can be checked very conveniently and intuitively.
Description
Technical field
The present invention relates to urban planning field, more particularly to a kind of urban planning management and control processing method and system.
Background technology
The concrete meaning of urban design typically refers to the design work using city as research object on building circle, between city
City's planning, a kind of design between Landscape Architecture and architectural design.Urban design will be dissolved in three-dimensional city space coordinate
Various contradictions, and set up new solid shape system;And regulatory plan is then biased toward with the two of the medium in soil region
Dimensional plane is planned.Therefore, the two shows different form dimensions, the abstractness and digitization relative to urban planning, city
Design is more concrete, graphical, visualization.
But, at present existing urban design major part is all rested on drawing, and it is also simply right that part forms threedimensional model
The three-dimensional modeling of the achievement of design itself and computer show, for the series of rules in Urban Design Achievement only stays in text
WD, this for subsequently based on urban design carry out urban planning examination & approval bring certain difficulty;And for inspection city
When whether the various construction of planning close regulation, judge generally in the form of manual measurement, both waste of manpower resource, and do not have
There is intuitive.
The content of the invention
In order to overcome the deficiencies in the prior art, an object of the present invention is to provide a kind of urban planning management and control process side
Method, it can realize more thering is intuitive, convenience in urban planning management and control and inspection.
An object of the present invention employs the following technical solutions realization:
The invention provides a kind of urban planning management and control processing method, including:
Obtain all of periphery key element of planned land use and planned land use;
The border of corresponding periphery key element is drawn according to the regulation of each periphery key element, so as to draw the rule of the planned land use
Partition domain;
Specify the restricted area that the planned land use is drawn with the border according to default urban planning administration;
The non-restricted area of the planned land use is drawn according to the planning region of planned land use and the restricted area of planned land use;
Non- restricted area is divided into multiple zonules, is then obtained with the frontier distance of periphery key element according to each zonule
Go out the corresponding control building height in the zonule, most at last each zonule is generated with corresponding by way of visual modeling
The three-dimensional visualization figure of control building height.
Preferably, the periphery key element at least includes the one kind or many in road, river, public lawn, bridge and building
Kind.
Preferably, also include:Three-dimensional building programme is added in the three-dimensional visualization figure, when the three-dimensional is built
When building programme and overlapping with the three-dimensional visualization figure, then the three-dimensional building programme is qualified.
In order to overcome the deficiencies in the prior art, the second object of the present invention is to provide a kind of urban planning management and control processing system
System, it can realize more thering is intuitive, convenience in urban planning management and control and inspection.
The second object of the present invention employs the following technical solutions realization:
Present invention also offers a kind of urban planning management and control processing system, including:
Planned land use acquisition module, for obtaining all of periphery key element of planned land use and planned land use;
Planning region acquisition module, for drawing the border of corresponding periphery key element according to the regulation of each periphery key element,
So as to draw the planning region of the planned land use;
Restricted area acquisition module, for showing that the planning is used according to default urban planning administration regulation and the border
The restricted area on ground;
Non- restricted area acquisition module, for being drawn with the restricted area of planned land use according to the planning region of planned land use
The non-restricted area of the planned land use;
Visualized graphs module, for non-restricted area to be divided into multiple zonules, then according to each zonule with
The frontier distance of periphery key element draws the corresponding control building height in the zonule, and most at last each zonule is built by visualization
The mode of mould is generated with the three-dimensional visualization figure of corresponding control building height.
Preferably, the periphery key element at least includes the one kind or many in road, river, public lawn, bridge and building
Kind.
Preferably, also include:Inspection module, for three-dimensional building programme to be added to the three-dimensional visualization figure
In, when the three-dimensional building programme overlaps with the three-dimensional visualization figure, then the three-dimensional building programme is qualified.
Compared to existing technology, the beneficial effects of the present invention is:The present invention marks off the regional of planned land use to come,
And showed by three-dimensional visualization figure such that it is able to easily, intuitively to existing architectural planning examine
Test.
Description of the drawings
Fig. 1 provides the method flow diagram of an embodiment for the present invention;
One of area schematic of planned land use that Fig. 2 is provided for the present invention;
The two of the area schematic of the planned land use that Fig. 3 is provided for the present invention;
Fig. 4 provides the system module figure of an embodiment for the present invention.
Specific embodiment
Below, with reference to accompanying drawing and specific embodiment, the present invention is described further:
As shown in figure 1, the invention provides a kind of urban planning management and control processing method, it is comprised the following steps:
S1:Obtain the periphery key element of planned land use and planned land use;The periphery key element at least include road, building,
River, bridge and public lawn, space etc. are therein one or more.
Specifically, in order to ensure environment, the security problems of Architectural Equipment, government part is defined between Architectural Equipment
Distance and height.Such as, how far residential building, office building can built apart from the border of road;How far may be used on the border in river
To repair roads, build office building etc., these are all statutory regulations, when in use, can be entered into system.The system
Refer to processing system provided by the present invention.Therefore, for developer, when developing in one piece of planned land use, first
It is to be understood that the peripheral facility (could also say that periphery key element) of planned land use, will can develop in planned land use
Calculate in region.The peripheral facility includes that road, building building, public lawn, river, bridge etc. are therein a kind of or many
Kind.In other words, for one piece of planned land use, the environmental facility around it potentially includes various, naturally it is also possible to be one kind, than
It is park green land that such as three sides are all road, another side.The planned land use may include coordinate, size of planned land use etc.
Essential information.
S2:The border of corresponding periphery key element is drawn according to the regulation grade of each periphery key element, so as to draw the planning
The planning region of land used.
Calculate the planning region of planned land use, it is necessary to find out each border of the periphery key element of the planned land use.
Different its area size of periphery key element, height etc. are all different, that is to say that its regulation grade is different, and its width, size, height are
It is different.Such as road:The grade of road is different, and its width is also just different.Want the border for getting the road:Obtaining first should
The medium line of road, then learns the width of road according to the grade of the road, so as to draw the border of the road.Same
Reason, draws the border of other periphery key elements:Public lawn for another example, its area occupied is also it is believed that so as to obtain
Go out the border of the park green land;The border of all of periphery key element is finally drawn, being then combined on all of border can
To determine the planning region of the planned land use.
S3:Specify the restricted area that the planned land use is drawn with the border according to default urban planning administration.
The restricted area refers to the region for not thinking to allow to take in the urban planning administration of statutory regulation, such as distance
Building can not be carried out in 50 meters of road boundary, do not allow to repair the roads in 30 meters of river etc..The border is periphery
Border between key element and planned land use, that is to say the border of whole planned land use.
S4:The non-restricted area of the planned land use is drawn according to the planning region of planned land use and the restricted area of planned land use
Domain.
The non-restricted area that is to say the region that developer develops, and recognize in the urban planning administration for being statutory regulation
For the region that can be taken, that is to say that the non-restricted area that is to say in planning region and remove restricted area.
S5:Non- restricted area is divided into multiple zonules, then according to the border of each zonule and periphery key element away from
From the corresponding control building height in the zonule is drawn, most at last each zonule is generated with right by way of visual modeling
The three-dimensional visualization figure of the control building height answered.
In non-restricted area, developer can be with development architecture facility;Again for the regulation of urban planning environment, with week
The difference of the frontier distance of side key element, the height of its facility built also has defined.Such as, apart from 100 meters of road boundary
Within the height of building must not exceed 10 meters, and the height of the building within 200 meters of road boundary must not exceed
30 meters.So as to learn, in non-restricted area, non-restricted area is divided according to the difference apart from periphery key element frontier distance
For multiple zonules, the depth of building in each zonule is different, then by each zonule three-dimensional visualization figure
To show, and periphery key element is also represented with visual figure, so as to form the three-dimensional visible figure of the planned land use.
When three-dimensional visualization figure is set up, corresponding three-dimensional visualization figure can be set up according to the program element three-dimensional visualization table of comparisons
Shape, program element here namely refers to the peripheral facility key element that the present invention is previously mentioned.Such as, in urban transportation facility
Intersection available point is to represent, road network can be represented with face, the distance of underground pedestrian road gateway and bus makes
Represented with buffering suface, thus can according to default facility key element and three-dimensional visualization figure by the planned land use and
Planned land use peripheral facility is showed by three-dimensional visualization graph direct.
Further, the three-dimensional visualization figure be given by the present invention can be applied in programme evaluation, will be existing
Some three-dimensional building programmes are added in the three-dimensional visualization figure, when three-dimensional building programme and three-dimensional visualization figure
It is then to illustrate that the existing three-dimensional building programme is qualified that shape overlaps.Such as, some building has exceeded in planned land use
The height for being controlled in the region, it is misaligned, then illustrate that the building is unqualified.
As shown in Figures 2 and 3, wherein A represents non-restricted area, and B represents restricted area, and it is (drawn in this figure that D represents road
Periphery key element is road), C represents the border of road, and wherein A+B that is to say the whole planning region of the planned land use.This is with regard to table
It is bright, wherein can not take in B regions, can take in a-quadrant.As shown in figure 3, A is divided into A1, A2 and A3.Due to A1,
A2, A3 are different apart from the distance of border C, then specify:The height of the control building in A1 regions must not exceed 20 meters, A2 regions
Control building height must not exceed 30 meters, and the building height that controls in A3 regions is 50 meters.So, three-dimensional visualization figure is being carried out
When, the pattern height in A1 regions is set into 20 meters, and the pattern height in A2 regions is set to 30 meters, the figure in A3 regions is high
Degree is set to 50 meters, and the key element to periphery and border etc. also generate corresponding figure, ultimately form a three-dimensional visualization
Figure, so as to each planning element in programme can be caused to show in the way of 3-D graphic, more intuitively changes.
As shown in figure 4, present invention also offers a kind of urban planning management and control processing system, including:
Planned land use acquisition module, for obtaining all of periphery key element of planned land use and planned land use;
Planning region acquisition module, for drawing the border of corresponding periphery key element according to the regulation of each periphery key element,
So as to draw the planning region of the planned land use;
Restricted area acquisition module, for showing that the planning is used according to default urban planning administration regulation and the border
The restricted area on ground;
Non- restricted area acquisition module, for being drawn with the restricted area of planned land use according to the planning region of planned land use
The non-restricted area of the planned land use;
Visualized graphs module, for non-restricted area to be divided into multiple zonules, then according to each zonule with
The frontier distance of periphery key element draws the corresponding control building height in the zonule, and most at last each zonule is built by visualization
The mode of mould is generated with the three-dimensional visualization figure of corresponding control building height.
Preferably, the periphery key element at least includes the one kind or many in road, river, public lawn, bridge and building
Kind.
Preferably:Inspection module, for three-dimensional building programme to be added in the three-dimensional visualization figure, when this
When three-dimensional building programme overlaps with the three-dimensional visualization figure, then the three-dimensional building programme is qualified.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various
It is corresponding to change and deformation, and all these change and deformation should all belong to the protection domain of the claims in the present invention
Within.
Claims (6)
1. a kind of urban planning management and control processing method, it is characterised in that include:
Obtain all of periphery key element of planned land use and planned land use;
The border of corresponding periphery key element is drawn according to the regulation of each periphery key element, so as to draw the planning region of the planned land use
Domain;
Specify the restricted area that the planned land use is drawn with the border according to default urban planning administration;
The non-restricted area of the planned land use is drawn according to the planning region of planned land use and the restricted area of planned land use;
Non- restricted area is divided into multiple zonules, then this is drawn according to the frontier distance of each zonule and periphery key element
The corresponding control building height in zonule, most at last each zonule is generated with corresponding control by way of visual modeling
The three-dimensional visualization figure of building height.
2. urban planning management and control processing method as claimed in claim 1, it is characterised in that the periphery key element at least includes road
One or more in road, river, public lawn, bridge and building.
3. urban planning management and control processing method as claimed in claim 1, it is characterised in that also include:By three-dimensional building planning side
Case is added in the three-dimensional visualization figure, when the three-dimensional building programme overlaps with the three-dimensional visualization figure,
Then the three-dimensional building programme is qualified.
4. a kind of urban planning management and control processing system, it is characterised in that include:
Planned land use acquisition module, for obtaining all of periphery key element of planned land use and planned land use;
Planning region acquisition module, for drawing the border of corresponding periphery key element according to the regulation of each periphery key element, so as to
Draw the planning region of the planned land use;
Restricted area acquisition module, for drawing the planned land use with the border according to default urban planning administration regulation
Restricted area;
Non- restricted area acquisition module, for drawing the rule according to the planning region of planned land use and the restricted area of planned land use
Draw the non-restricted area of land used;
Visualized graphs module, for non-restricted area to be divided into multiple zonules, then according to each zonule and periphery
The frontier distance of key element draws the corresponding control building height in the zonule, and most at last each zonule passes through visual modeling
Mode is generated with the three-dimensional visualization figure of corresponding control building height.
5. urban planning management and control processing system as claimed in claim 4, it is characterised in that the periphery key element at least includes road
One or more in road, river, public lawn, bridge and building.
6. urban planning management and control processing system as claimed in claim 4, it is characterised in that also include:Inspection module, for by three
Dimension architectural planning is added in the three-dimensional visualization figure, when the three-dimensional building programme and the three-dimensional visualization
When figure overlaps, then the three-dimensional building programme is qualified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227446.3A CN106651186A (en) | 2016-12-27 | 2016-12-27 | City planning management control processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227446.3A CN106651186A (en) | 2016-12-27 | 2016-12-27 | City planning management control processing method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106651186A true CN106651186A (en) | 2017-05-10 |
Family
ID=58832778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611227446.3A Pending CN106651186A (en) | 2016-12-27 | 2016-12-27 | City planning management control processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106651186A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107909292A (en) * | 2017-12-08 | 2018-04-13 | 华北水利水电大学 | A kind of urban planning management and control processing system and method |
CN111709077A (en) * | 2020-06-15 | 2020-09-25 | 广州城市信息研究所有限公司 | Visual space quantitative analysis method |
CN113919037A (en) * | 2021-10-27 | 2022-01-11 | 东南大学建筑设计研究院有限公司 | Digital test and verification method for feasibility of form control elements in city design guide rule |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060025971A1 (en) * | 2004-07-28 | 2006-02-02 | Blue Ridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
CN102004963A (en) * | 2010-12-02 | 2011-04-06 | 张磊 | Digital city generation method and system |
CN102360474A (en) * | 2011-10-27 | 2012-02-22 | 上海同城信息科技有限公司 | Method and system for discriminating data in regulatory adjustment |
CN105205283A (en) * | 2015-10-14 | 2015-12-30 | 广西大学 | Rule modeling method integrating city design indexes and construction control indexes |
-
2016
- 2016-12-27 CN CN201611227446.3A patent/CN106651186A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060025971A1 (en) * | 2004-07-28 | 2006-02-02 | Blue Ridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
CN102004963A (en) * | 2010-12-02 | 2011-04-06 | 张磊 | Digital city generation method and system |
CN102360474A (en) * | 2011-10-27 | 2012-02-22 | 上海同城信息科技有限公司 | Method and system for discriminating data in regulatory adjustment |
CN105205283A (en) * | 2015-10-14 | 2015-12-30 | 广西大学 | Rule modeling method integrating city design indexes and construction control indexes |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107909292A (en) * | 2017-12-08 | 2018-04-13 | 华北水利水电大学 | A kind of urban planning management and control processing system and method |
CN111709077A (en) * | 2020-06-15 | 2020-09-25 | 广州城市信息研究所有限公司 | Visual space quantitative analysis method |
CN111709077B (en) * | 2020-06-15 | 2023-02-07 | 广州城市信息研究所有限公司 | Visual space quantitative analysis method |
CN113919037A (en) * | 2021-10-27 | 2022-01-11 | 东南大学建筑设计研究院有限公司 | Digital test and verification method for feasibility of form control elements in city design guide rule |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022047958A1 (en) | Artificial intelligence-based urban road network automatic generation method | |
KR101659779B1 (en) | Method for Constructing Three Dimentional Drawing of GIS | |
CN106407540B (en) | A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology | |
CN111199066B (en) | Construction site virtual construction restoration method based on BIM+GIS | |
CN108399652A (en) | Method, apparatus, storage medium and the terminal device of City Buried Pipeline three-dimension monitor model foundation | |
CN106503381B (en) | BIM-GIS technology-based virtual construction site construction method for underground excavation station of subway | |
CN111125820B (en) | BIM+GIS-based construction site space virtual construction method | |
CN105427370A (en) | Method for informationization management and planning design of electric-power underground pipeline | |
CN110990919A (en) | Three-dimensional GIS route selection design analysis method for urban rail transit | |
CN107944203A (en) | A kind of visual architectural design method of wind-velocity streamline | |
CN112685820A (en) | Digital power station delivery method, medium and equipment based on BIM and GIS | |
Zhou et al. | A BIM-based identification and classification method of environmental risks in the design of Beijing subway | |
CN106651186A (en) | City planning management control processing method and system | |
CN113936265A (en) | Parking space automatic identification method based on building general plane positioning diagram | |
Murata | 3D-GIS application for urban planning based on 3D city model | |
CN117436174A (en) | Urban ventilation corridor construction method and system based on CFD and circuit theory | |
CN111091235A (en) | Method and device for determining incoming and outgoing line paths of substation area of transformer substation | |
CN112328666A (en) | Intelligent building supervision operation and maintenance system based on cloud platform technology | |
Drozd et al. | Use of BIM tools for organization of the construction site in the aspect of work safety | |
CN115510607A (en) | Three-electricity migration and transformation design method based on three-dimensional live-action modeling technology | |
AU2021105175A4 (en) | Auxiliary planning auditing method for underground pipelines based on three-dimensional GIS technology | |
CN110889158A (en) | Method and device for determining external drainage system of substation area of transformer substation | |
Zhang | Application of BIM Technology in Road Engineering Design | |
CN114048542B (en) | Visualization method and system for highway engineering data space | |
Chen et al. | The application of BIM technology in the design of airport pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |