default search action
James J. Jiang
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j121]Yang Lei, Xiaosong Wu, James J. Jiang:
Shared Mental Models and Boundary Management Activities in New Product Development: A Perspective on Multiteam Systems. IEEE Trans. Engineering Management 71: 1073-1085 (2024) - [j120]Yujuan Zheng, James J. Jiang, Wayne Huang, Xiaosong Wu, Haitao Ren:
Coordination Resistance in Cross-Functional NPD Projects: The Moderating Role of Temporal Leadership. IEEE Trans. Engineering Management 71: 2138-2152 (2024) - [j119]Jacob Chia-An Tsai, Gary Klein, Carol S. Saunders, James J. Jiang:
Information Elaboration and Coopetition: Participation in the Replacement of Legacy Systems. IEEE Trans. Engineering Management 71: 2683-2697 (2024) - [j118]Yang Lei, Xiaosong Wu, Ying Kong, James J. Jiang:
An Empirical Investigation of the Antecedents and Consequences of Integration Team Ambidexterity in Multiteam Systems-Based Projects. IEEE Trans. Engineering Management 71: 9630-9643 (2024) - 2023
- [j117]Jianru Zhang, Ju'e Guo, Randi Jiang, Xiaosong Wu, James J. Jiang:
The moderating role of enterprise social media functionalities on employees' social-related use during work time. Inf. Manag. 60(3): 103770 (2023) - [j116]Jacob Chia-An Tsai, James J. Jiang, Gary Klein, Shin-Yuan Hung:
Task Conflict Resolution in Designing Legacy Replacement Systems. J. Manag. Inf. Syst. 40(3): 1009-1034 (2023) - 2022
- [j115]Vivian Hanzhuo Ma, Shulin Liu, Gary Klein, Wei (Wayne) Huang, James J. Jiang:
Social interdependencies as facilitators of cooperative learning in new product development: The moderating effect of technological novelty. Expert Syst. Appl. 195: 116619 (2022) - [j114]Jacob Chia-An Tsai, James J. Jiang, Gary Klein, Shin-Yuan Hung:
Legacy information system replacement: Pursuing quality design of operational information systems. Inf. Manag. 59(2): 103592 (2022) - [j113]Jacob Chia-An Tsai, Xiaosong (Jason) Wu, Gary Klein, James J. Jiang:
Goal Equivocality and Joint Account of Meaning Creation in an Enterprise System Program. Inf. Syst. Manag. 39(1): 82-97 (2022) - [j112]Jae Kyu Lee, James J. Jiang, Patrick Y. K. Chau, Brian Fitzgerald, Atreyi Kankanhalli, Matthew L. Nelson, Wei (Wayne) Huang, Kwok Kee Wei, Choon-Ling Sia, Doug Vogel, Michael D. Myers, Guy G. Gable, Kathy Ning Shen, Chih-Ping Wei, Shin-Yuan Hung, Keng Leng Siau, David Liang:
Journey with Ting-Peng Liang in Pacific Asia Information Systems Field. Pac. Asia J. Assoc. Inf. Syst. 14(1): 2 (2022) - [c18]Zih-An Shen, Chwan-Ming Jimmy Wang, Jacob C. Tsai, Jason Wu, Jamie Y. T. Chang, James J. Jiang:
The Impacts of Reward Systems on the Inter-Team Cooperation in Information Technology NPD. PACIS 2022: 132 - 2021
- [c17]Andrew Burton-Jones, James J. Jiang, Hans-Dieter Zimmermann, Sajda Qureshi, Dorothy E. Leidner, Robert M. Davison, Doug Vogel:
PACIS Panel - Meet the Editors. PACIS 2021: 250 - [c16]Jae Kyu Lee, Doug Vogel, David Liang, Chih-Ping Wei, Shin-Yuan Hung, Brian Fitzgerald, Matthew L. Nelson, Choon Ling Sia, Kwok-Kee Wei, Michael D. Myers, Keng Leng Siau, Kathy Ning Shen, James J. Jiang, Guy G. Gable:
PACIS TP Liang Tribute Session. PACIS 2021: 253 - 2020
- [j111]Yujuan Zheng, Shan Liu, Wayne Wei Huang, James Jiunn-Yih Jiang:
Inter-organizational cooperation in automotive new product development projects. Ind. Manag. Data Syst. 120(1): 79-97 (2020) - [j110]James J. Jiang, Wayne Wei Huang, Gary Klein, Jacob Chia-An Tsai:
The Career Satisfaction of IT Professionals With Mixed Job Demands. IEEE Trans. Engineering Management 67(1): 30-41 (2020)
2010 – 2019
- 2019
- [j109]Jamie Y. T. Chang, James J. Jiang, Gary Klein, Eric T. G. Wang:
Enterprise system programs: Goal setting and cooperation in the integration team. Inf. Manag. 56(6) (2019) - [j108]James J. Jiang, Gary Klein, Jamie Y. T. Chang:
Teamwork behaviors in implementing enterprise systems with multiple projects: Results from Chinese firms. J. Syst. Softw. 157 (2019) - [j107]James J. Jiang:
Editorial introduction. Pac. Asia J. Assoc. Inf. Syst. 11(1): 1 (2019) - [j106]James J. Jiang, Ting-Peng Liang, Jacob Chia-An Tsai:
Knowledge Profile in PAJAIS: A Review of Literature and Future Research Directions. Pac. Asia J. Assoc. Inf. Syst. 11(1): 6 (2019) - [j105]James J. Jiang, Jacob Chia-An Tsai:
Getting Published in PAJAIS: A Practical Guide from the Editors Perspective. Pac. Asia J. Assoc. Inf. Syst. 11(2): 1 (2019) - [j104]James J. Jiang, Jacob Chia-An Tsai:
Constructing an Effective Abstract: Guidelines and New Standards in PAJAIS. Pac. Asia J. Assoc. Inf. Syst. 11(3): 1 (2019) - [j103]James J. Jiang, Jacob Chia-An Tsai:
Why Are Papers Desk Rejected at PAJAIS?: A Practical Guide to Avoiding Rejection. Pac. Asia J. Assoc. Inf. Syst. 11(4): 1 (2019) - [c15]Vivian Hanzhuo Ma, Wei Huang, Yujuan Zheng, Xiaosong Wu, Gary S. Klein, James J. Jiang:
Program management: A comprehensive literature review for future research directions. PACIS 2019: 135 - [e1]Kwok Kee Wei, Wayne Wei Huang, Jae Kyu Lee, Dongming Xu, James J. Jiang, Hee-Woong Kim:
23rd Pacific Asia Conference on Information Systems, PACIS 2019, X'ian, China, July 8-12, 2019. 2019 [contents] - 2018
- [j102]L. G. Pee, James J. Jiang, Gary Klein:
Signaling effect of website usability on repurchase intention. Int. J. Inf. Manag. 39: 228-241 (2018) - [j101]James J. Jiang, Gary Klein, Walter D. Fernández:
From Project Management to Program Management: An Invitation to Investigate Programs Where IT Plays a Significant Role. J. Assoc. Inf. Syst. 19(1): 1 (2018) - [j100]James J. Jiang:
Editorial Introduction. Pac. Asia J. Assoc. Inf. Syst. 10(3): 5 (2018) - [j99]James J. Jiang:
Editorial Introduction. Pac. Asia J. Assoc. Inf. Syst. 10(4): 1 (2018) - [c14]Jamie Yi-Ting Chang, Fei-Fei Cheng, Chin-Shan Wu, James Jiunn-Yih Jiang:
Inter-Team Task Conflict within Enterprise Systems Implementations. PACIS 2018: 45 - [c13]Muhammad Rasheed Khan, Walter D. Fernández, James J. Jiang, Gary Klein:
Building organisational support for an IT-enabled transformation program - the process of coopting. PACIS 2018: 300 - 2017
- [c12]Muhammad Rasheed Khan, Walter D. Fernández, James J. Jiang, Gary Klein:
The shifting sand of program coordination effort: lessons from IT-enabled transformation programs. ACIS 2017: 80 - [c11]Chanyoung Seo, Zixiu Guo, Lin Xiao, James J. Jiang, Gary Klein:
Hedonic Information Systems Quality. PACIS 2017: 189 - 2015
- [j98]Sigi Goode, Chinho Lin, Jacob C. Tsai, James J. Jiang:
Rethinking the role of security in client satisfaction with Software-as-a-Service (SaaS) providers. Decis. Support Syst. 70: 73-85 (2015) - [j97]Neeraj Parolia, Jengchung Victor Chen, James J. Jiang, Gary Klein:
Conflict resolution effectiveness on the implementation efficiency and achievement of business objectives in IT programs: A study of IT vendors. Inf. Softw. Technol. 66: 30-39 (2015) - [c10]James J. Jiang, Jacob Chia-An Tsai, Jamie Y. T. Chang, Houn-Gee Chen, Fei Ren:
The Impacts of Program Goal Ambiguity on Inter-team Integrative Conflict Management during IT Program Implementation: Theory of Controversy. HICSS 2015: 4454-4462 - 2014
- [j96]Sigi Goode, Chinho Lin, Walter D. Fernández, James J. Jiang:
Exploring two explanations of loyalty in application service provision. Eur. J. Oper. Res. 237(2): 649-657 (2014) - [j95]Jamie Y. T. Chang, James J. Jiang, Gary Klein, Eric T. G. Wang:
Do too many goals impede a program? A case study of enterprise system implementation with multiple interdependent projects. Inf. Manag. 51(4): 465-478 (2014) - [j94]Sheng-Pao Shih, Ting Lie, Gary Klein, James J. Jiang:
Information technology customer aggression: The importance of an organizational climate of support. Inf. Manag. 51(6): 670-678 (2014) - [j93]James J. Jiang, Gary Klein:
Special Section: IT Project Management. J. Manag. Inf. Syst. 31(1): 13-16 (2014) - [j92]James J. Jiang, Jamie Y. T. Chang, Houn-Gee Chen, Eric T. G. Wang, Gary Klein:
Achieving IT Program Goals with Integrative Conflict Management. J. Manag. Inf. Syst. 31(1): 79-106 (2014) - [j91]Peggy M. Beranek, Gary Klein, James J. Jiang:
Building User Engagement for Successful Software Projects: Meaningfulness, Safety, and Availability. Pac. Asia J. Assoc. Inf. Syst. 6(3): 1 (2014) - 2013
- [j90]Tzy-Yuan Chou, Seng-cho Timothy Chou, James J. Jiang, Gary Klein:
The organizational citizenship behavior of IS personnel: Does organizational justice matter? Inf. Manag. 50(2-3): 105-111 (2013) - [j89]Sheng-Pao Shih, James J. Jiang, Gary Klein, Eric T. G. Wang:
Job burnout of the information technology worker: Work exhaustion, depersonalization, and personal accomplishment. Inf. Manag. 50(7): 582-589 (2013) - [j88]Neeraj Parolia, Gary Klein, James J. Jiang:
Exploring the Impact of Team based Reward on Project Performance in Outsourced System Development. Int. J. Inf. Technol. Proj. Manag. 4(4): 82-92 (2013) - [j87]Jerry Chih-Ching Chiang, Ming-Hsien Yang, Gary Klein, James Jiunn-Yih Jiang:
Antecedents of organizational citizenship for information technology personnel. Ind. Manag. Data Syst. 113(4): 589-604 (2013) - [j86]Chia-Ping Yu, Houn-Gee Chen, Gary Klein, James J. Jiang:
Risk Dynamics Throughout the System Development Life Cycle. J. Comput. Inf. Syst. 53(3): 28-37 (2013) - [j85]Jamie Y. T. Chang, Eric T. G. Wang, James J. Jiang, Gary Klein:
Controlling ERP consultants: Client and provider practices. J. Syst. Softw. 86(5): 1453-1461 (2013) - [j84]Neeraj Parolia, James J. Jiang, Gary Klein:
The presence and development of competency in IT programs. J. Syst. Softw. 86(12): 3140-3150 (2013) - 2012
- [j83]Christina Ling-Hsing Chang, James J. Jiang, Gary Klein, Houn-Gee Chen:
Career anchors and disturbances in job turnover decisions - A case study of IT professionals in Taiwan. Inf. Manag. 49(6): 309-319 (2012) - [j82]Jerry C. Chiang, James Jiunn-Yih Jiang, Chechen Liao, Gary Klein:
Consequences of Psychological Contract Violations for is Personnel. J. Comput. Inf. Syst. 52(4): 78-87 (2012) - [j81]James J. Jiang, Jacob C. Tsai, Gary Klein, Stacie Petter:
Fully Mediated Effects of Formative Measures Using MIMIC Constructs. Pac. Asia J. Assoc. Inf. Syst. 4(2): 2 (2012) - 2011
- [j80]Sheng-Pao Shih, James J. Jiang, Gary Klein, Eric T. G. Wang:
Learning demand and job autonomy of IT personnel: Impact on turnover intention. Comput. Hum. Behav. 27(6): 2301-2307 (2011) - [j79]Christina Ling-Hsing Chang, Jengchung Victor Chen, Gary Klein, James J. Jiang:
Information system personnel career anchor changes leading to career changes. Eur. J. Inf. Syst. 20(1): 103-117 (2011) - [j78]Tzy-Yuan Chou, James J. Jiang, Gary Klein, Seng-cho Timothy Chou:
Organizational Citizenship Behavior of Information System Personnel: The Influence of Leader-Member Exchange. Inf. Resour. Manag. J. 24(4): 77-93 (2011) - [c9]Jamie Y. T. Chang, Eric T. G. Wang, James J. Jiang, Gary Klein:
Coordination among ERP consultants: controlling mechanisms. ECIS 2011: 191 - [c8]Yuzhu Li, James J. Jiang, Gary Klein:
The Impacts Of Communication On IT Program External Environments And IT Product Quality. PACIS 2011: 113 - 2010
- [j77]Jack Shih-Chieh Hsu, Houn-Gee Chen, James J. Jiang, Gary Klein:
The Role of User Review on Information System Project Outcomes: A Control Theory Perspective. Int. J. Inf. Technol. Proj. Manag. 1(1): 1-14 (2010) - [j76]Kuo-Chung Chang, Tsong Shin Sheu, Gary Klein, James J. Jiang:
User commitment and collaboration: Motivational antecedents and project performance. Inf. Softw. Technol. 52(6): 672-679 (2010) - [j75]J. T. Shim, Tsong Shin Sheu, Houn-Gee Chen, James J. Jiang, Gary Klein:
Coproduction in successful software development projects. Inf. Softw. Technol. 52(10): 1062-1068 (2010) - [j74]Yuzhu Li, Kuo-Chung Chang, Houn-Gee Chen, James J. Jiang:
Software development team flexibility antecedents. J. Syst. Softw. 83(10): 1726-1734 (2010) - [j73]Ting-Peng Liang, James J. Jiang, Gary S. Klein, Julie Yu-Chih Liu:
Software Quality as Influenced by Informational Diversity, Task Conflict, and Learning in Project Teams. IEEE Trans. Engineering Management 57(3): 477-487 (2010) - [c7]Aleck C. H. Lin, James J. Jiang, Gary Klein:
Persistence Influence for IT Outsourcing: Small and Medium Firms Perspectives of Their Application Service Providers. PACIS 2010: 19
2000 – 2009
- 2009
- [j72]Ting-Peng Liang, Andrew J. Czaplewski, Gary Klein, James J. Jiang:
Technical opinion - Leveraging first-mover advantages in internet-based consumer services. Commun. ACM 52(6): 146-148 (2009) - [j71]Girish H. Subramanian, Gary Klein, James J. Jiang, Chien-Lung Chan:
Balancing four factors in system development projects. Commun. ACM 52(10): 118-121 (2009) - [j70]Julie Yu-Chih Liu, Gary Klein, Jengchung V. Chen, James J. Jiang:
The Negative Impact of Conflict on the Information System Development Process, Product, and Project. J. Comput. Inf. Syst. 49(4): 98-104 (2009) - [j69]Houn-Gee Chen, James J. Jiang, Gary Klein, Jengchung V. Chen:
Reducing software requirement perception gaps through coordination mechanisms. J. Syst. Softw. 82(4): 650-655 (2009) - [j68]James J. Jiang, Gary Klein, Shelly P. J. Wu, Ting-Peng Liang:
The relation of requirements uncertainty and stakeholder perception gaps to project management performance. J. Syst. Softw. 82(5): 801-808 (2009) - [j67]Gary Klein, James J. Jiang, Paul H. Cheney:
Resolving Difference Score Issues in Information Systems Research. MIS Q. 33(4): 811-826 (2009) - [j66]Jyun-Cheng Wang, Gary Klein, James J. Jiang, Paul H. Cheney:
Management Information Systems Research Networks: Creating and Sharing Diverse Knowledge. Pac. Asia J. Assoc. Inf. Syst. 1(1): 10 (2009) - [c6]Yuzhu Li, James J. Jiang, Gary Klein:
The Role of Team Learning in Enabling Shared Leadership in ISD Teams. AMCIS 2009: 182 - 2008
- [j65]Eric T. G. Wang, Pei-Hung Ju, James J. Jiang, Gary Klein:
The effects of change control and management review on software flexibility and project performance. Inf. Manag. 45(7): 438-443 (2008) - [j64]Richard Discenza, Debbie B. Tesch, Gary Klein, James J. Jiang:
User involvement to enhance expertise in system development. Int. J. Internet Enterp. Manag. 5(4): 373-389 (2008) - [j63]Stuart D. Galup, Gary Klein, James J. Jiang:
The Impacts of Job Characteristics on is Employee Satisfaction: A Comparison between Permanent and Temporary Employees. J. Comput. Inf. Syst. 48(4): 58-68 (2008) - [j62]Eric T. G. Wang, Sheng-Pao Shih, James J. Jiang, Gary Klein:
The consistency among facilitating factors and ERP implementation success: A holistic view of fit. J. Syst. Softw. 81(9): 1609-1621 (2008) - [j61]Chien-Lung Chan, James J. Jiang, Gary Klein:
Team Task Skills as a Facilitator for Application and Development Skills. IEEE Trans. Engineering Management 55(3): 434-441 (2008) - 2007
- [j60]Michael Boyd, Shi-Ming Huang, James J. Jiang, Gary Klein:
Discrepancies between desired and perceived measures of performance of IS professionals: Views of the IS professionals themselves and the users. Inf. Manag. 44(2): 188-195 (2007) - [j59]Neeraj Parolia, Stephen Goodman, Yuzhu Li, James J. Jiang:
Mediators between coordination and IS project performance. Inf. Manag. 44(7): 635-645 (2007) - [j58]Eric T. G. Wang, Chia-Chin Lin, James J. Jiang, Gary Klein:
Improving enterprise resource planning (ERP) fit to organizational process through knowledge transfer. Int. J. Inf. Manag. 27(3): 200-212 (2007) - [j57]James J. Jiang, Gary Klein, Philip Beck, Eric T. G. Wang:
Lack of Skill Risks to Organizational Technology Learning and Software Project Performance. Inf. Resour. Manag. J. 20(3): 32-45 (2007) - [j56]James J. Jiang, Gary Klein, Eric T. G. Wang:
Relationship of Skill Expectation Gap Between IS Employees and Their Managers with User Satisfaction. Inf. Resour. Manag. J. 20(3): 63-75 (2007) - [j55]Girish H. Subramanian, James J. Jiang, Gary Klein:
Software quality and IS project performance improvements from software development process maturity and IS implementation strategies. J. Syst. Softw. 80(4): 616-627 (2007) - [c5]Yuzhu Li, James J. Jiang, Gary Klein:
Reducing Requirement Perception Gaps through Coordination Mechanisms in Software Development Team. AMCIS 2007: 187 - 2006
- [j54]Gary S. Klein, James J. Jiang, Carol Saunders:
Leading the Horse to Water. Commun. Assoc. Inf. Syst. 18: 13 (2006) - [j53]Gary Klein, Peggy M. Beranek, Ben Martz, James J. Jiang:
The relationship of control and learning to project performance. Cybern. Syst. 37(2-3): 137-150 (2006) - [j52]Eric T. G. Wang, Sheng-Pao Shih, James J. Jiang, Gary Klein:
The relative influence of management control and user-IS personnel interaction on project performance. Inf. Softw. Technol. 48(3): 214-220 (2006) - [j51]Eric T. G. Wang, Ta-Chung Ying, James J. Jiang, Gary Klein:
Group cohesion in organizational innovation: An empirical examination of ERP implementation. Inf. Softw. Technol. 48(4): 235-244 (2006) - [j50]James J. Jiang, Gary Klein, Hong-Gee Chen:
The Effects of User Partnering and User Non-Support on Project Performance. J. Assoc. Inf. Syst. 7(2): 6 (2006) - [j49]Craig Van Slyke, J. T. Shim, Richard D. Johnson, James J. Jiang:
Concern for Information Privacy and Online Consumer Purchasing. J. Assoc. Inf. Syst. 7(6): 16 (2006) - [j48]Stephen A. Sivo, Carol S. Saunders, Qing Chang, James J. Jiang:
How Low Should You Go? Low Response Rates and the Validity of Inference in IS Questionnaire Research. J. Assoc. Inf. Syst. 7(6): 17 (2006) - [j47]Eric T. G. Wang, Gary Klein, James J. Jiang:
ERP Misfit: Country of Origin and Organizational Factors. J. Manag. Inf. Syst. 23(1): 263-292 (2006) - [j46]Philip Beck, James J. Jiang, Gary Klein:
Prototyping mediators to project performance: Learning and interaction. J. Syst. Softw. 79(7): 1025-1035 (2006) - [c4]Neeraj Parolia, James J. Jiang:
The Role of Horizontal Coordination in Performance of ISD Projects. AMCIS 2006: 450 - [c3]Eric T. G. Wang, James J. Jiang, Gary Klein, Wm. Benjamin Martz Jr.:
Successful Adoption of ERP Technology as Influenced by Country of Origin. BIS 2006: 187-200 - 2005
- [j45]Henry H. G. Chen, Ruth Miller, James J. Jiang, Gary Klein:
Communication skills importance and proficiency: perception differences between IS staff and IS users. Int. J. Inf. Manag. 25(3): 215-227 (2005) - [j44]Debbie B. Tesch, Ruth Miller, James J. Jiang, Gary Klein:
Perception and expectation gaps of information systems provider skills: the impact on user satisfaction. Inf. Syst. J. 15(4): 343-355 (2005) - [j43]Maosen Zhong, Roger Alan Pick, Gary Klein, James J. Jiang:
Vector Error-Correction Models in a Consumer Packaged Goods Category Forecasting Decision Support System. J. Comput. Inf. Syst. 46(1): 25-34 (2005) - [j42]Eric T. G. Wang, Henry H. G. Chen, James J. Jiang, Gary Klein:
Interaction quality between IS professionals and users: impacting conflict and project performance. J. Inf. Sci. 31(4): 273-282 (2005) - 2004
- [j41]James J. Jiang, Maosen Zhong, Gary Klein, Hong-Gee Chen:
Nonstationary Brand Variables in Category Management: A Cointegration Perspective. Decis. Sci. 35(1): 101-128 (2004) - [j40]Chaitanya Singh, Roger Shelor, James J. Jiang, Gary Klein:
Rental software valuation in IT investment decisions. Decis. Support Syst. 38(1): 115-130 (2004) - [j39]James J. Jiang, Gary Klein, Hsin-Ginn Hwang, Jack Huang, Shin-Yuan Hung:
An exploration of the relationship between software development process maturity and project performance. Inf. Manag. 41(3): 279-288 (2004) - [c2]Huey-Wen Chou, James J. Jiang, Eric T. G. Wang:
Charismatic Leadership Style, Intragroup Conflict, And ERP Implementation Team Performance. PACIS 2004: 27 - 2003
- [j38]James J. Jiang, Gary Klein, Debbie B. Tesch, Houn-Gee Chen:
Closing the user and provider service quality gap. Commun. ACM 46(2): 72-76 (2003) - [j37]Maxwell K. Hsu, Hong-Gee Chen, James J. Jiang, Gary Klein:
Career satisfaction for managerial and technical anchored IS personnel in later career stages. Data Base 34(4): 64-72 (2003) - [j36]Debbie B. Tesch, James J. Jiang, Gary Klein:
The Impact of Information System Personnel Skill Discrepancies on Stakeholder Satisfaction. Decis. Sci. 34(1): 107-129 (2003) - [j35]James J. Jiang, Gary Klein, Craig Van Slyke, Paul H. Cheney:
A Note on Interpersonal and Communication Skills for IS Professionals: Evidence of Positive Influence. Decis. Sci. 34(4): 799-812 (2003) - [j34]James J. Jiang, Gary Klein, Roger Alan Pick:
The impact of IS department organizational environments upon project team performances. Inf. Manag. 40(3): 213-220 (2003) - [j33]Maxwell K. Hsu, James J. Jiang, Gary Klein, Zaiyoung Tang:
Perceived career incentives and intent to leave. Inf. Manag. 40(5): 361-369 (2003) - [j32]Bruce A. Walters, James J. Jiang, Gary Klein:
Strategic information and strategic decision making: the EIS/CEO interface in smaller manufacturing companies. Inf. Manag. 40(6): 487-495 (2003) - [j31]Eldon Y. Li, James J. Jiang, Gary Klein:
The Impact of Organizational Coordination and Climate on Marketing Executives' Satisfaction with Information Systems Services. J. Assoc. Inf. Syst. 4: 4 (2003) - 2002
- [j30]Gary Klein, James J. Jiang, Debbie B. Tesch:
Wanted: project teams with a blend of is professional orientations. Commun. ACM 45(6): 81-87 (2002) - [j29]James J. Jiang, Gary Klein, Richard Discenza:
Pre-project partnering impact on an information system project, project team and project manager. Eur. J. Inf. Syst. 11(2): 86-97 (2002) - [j28]James J. Jiang, Gary Klein:
A Discrepancy Model of Information System Personnel Turnover. J. Manag. Inf. Syst. 19(2): 249-272 (2002) - [j27]James J. Jiang, Gary Klein, Richard Discenza:
Perception differences of software success: provider and user views of system metrics. J. Syst. Softw. 63(1): 17-27 (2002) - [j26]James J. Jiang, Gary Klein, Christopher L. Carr:
Measuring Information System Service Quality: SERVQUAL from the Other Side. MIS Q. 26(2): 145-166 (2002) - 2001
- [j25]Gary Klein, James J. Jiang, Marion G. Sobol:
A new view of IS personnel performance evaluation. Commun. ACM 44(6): 95-102 (2001) - [j24]James J. Jiang, Gary Klein, Jinsheng Roan, Jim T. M. Lin:
IS service performance: self-perceptions and user perceptions. Inf. Manag. 38(8): 499-506 (2001) - [j23]James J. Jiang, Gary Klein, Joseph L. Balloun:
The joint impact of internal and external career anchors on entry-level IS career satisfaction. Inf. Manag. 39(1): 31-39 (2001) - [j22]James J. Jiang, Morgan M. Shepherd, Gary Klein:
The Materiality of Information System Planning Maturity to Project Performance. J. Assoc. Inf. Syst. 2: 5 (2001) - [j21]Gary Klein, James J. Jiang:
Seeking consonance in information systems. J. Syst. Softw. 56(2): 195-202 (2001) - [j20]James J. Jiang, Gary Klein, Richard Discenza:
Information system success as impacted by risks and development strategies. IEEE Trans. Engineering Management 48(1): 46-55 (2001) - 2000
- [j19]James J. Jiang, Gary Klein, Suzanne M. Crampton:
A Note on SERVQUAL Reliability and Validity in Information System Service Quality Measurement. Decis. Sci. 31(3): 725-744 (2000) - [j18]James J. Jiang, Maosen Zhong, Gary Klein:
Marketing Category Forecasting: An Alternative of BVAR-Artificial Neural Networks. Decis. Sci. 31(4): 789-812 (2000) - [j17]James J. Jiang, Waleed A. Muhanna, Gary Klein:
User resistance and strategies for promoting acceptance across system types. Inf. Manag. 37(1): 25-36 (2000) - [j16]James J. Jiang, Gary Klein:
Effects of downsizing policies on IS survivors' attitude and career management. Inf. Manag. 38(1): 35-45 (2000) - [j15]James J. Jiang, Gary Klein:
Side effects of decision guidance in decision support systems. Interact. Comput. 12(5): 469-481 (2000) - [j14]James J. Jiang, Gary Klein:
Supervisor Support and Career Anchor Impact on the Career Satisfaction of the Entry-Level Information Systems Professional. J. Manag. Inf. Syst. 16(3): 219-230 (2000) - [j13]James J. Jiang, Gary Klein:
Software development risks to project effectiveness. J. Syst. Softw. 52(1): 3-10 (2000) - [j12]James J. Jiang, Marion G. Sobol, Gary Klein:
Performance ratings and importance of performance measures for IS staff: the different perceptions of IS users and IS staff. IEEE Trans. Engineering Management 47(4): 424-434 (2000)
1990 – 1999
- 1999
- [j11]James J. Jiang, Gary Klein:
Project selection criteria by strategic orientation. Inf. Manag. 36(2): 63-75 (1999) - [j10]James J. Jiang, Gary Klein:
Risks to different aspects of system success. Inf. Manag. 36(5): 263-272 (1999) - [j9]James J. Jiang, Gary Klein, Joseph L. Balloun, Suzanne M. Crampton:
System analysts' orientations and perceptions of system failure. Inf. Softw. Technol. 41(2): 101-106 (1999) - [j8]James J. Jiang, Gary Klein, Tom Means:
The missing link between systems analysts' actions and skills. Inf. Syst. J. 9(1): 21-34 (1999) - [j7]Gary Klein, James J. Jiang:
User perception of expert system advice. J. Syst. Softw. 48(2): 155-161 (1999) - [j6]James J. Jiang, Gary Klein:
User evaluation of information systems: by system typology. IEEE Trans. Syst. Man Cybern. Part A 29(1): 111-116 (1999) - [c1]Gary Klein, James J. Jiang, Michael Boyd:
Building a Case for Consonance. BIS 1999: 3-12 - 1998
- [j5]James J. Jiang, Gary Klein, Roger Alan Pick:
A marketing category management system: a decision support system using scanner data. Decis. Support Syst. 23(3): 259-271 (1998) - [j4]James J. Jiang, Gary Klein, Joseph L. Balloun:
Perceptions of system development failures. Inf. Softw. Technol. 39(14-15): 933-937 (1998) - 1997
- [j3]Gary Klein, James J. Jiang, Joseph L. Balloun:
Information system evaluation by system typology. J. Syst. Softw. 37(3): 181-186 (1997) - 1996
- [j2]James J. Jiang, Gary Klein:
User Perceptions of Evaluation Criteria for Three System Types. Data Base 27(3): 63-69 (1996) - 1995
- [j1]James J. Jiang, Roger Alan Pick, Gary Klein:
Are you sure you want to use that data in your study? IEEE Trans. Syst. Man Cybern. 25(2): 378-380 (1995)
Coauthor Index
aka: Gary S. Klein
aka: Jacob C. Tsai
aka: Eric T. G. Wang
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-13 17:57 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint