Shinko Turbine: Operation & Maintenance
Shinko Turbine: Operation & Maintenance
Shinko Turbine: Operation & Maintenance
OPERATION
&
MAINTENANCE
STEAM FLOW DIAGRAM
DRAIN SEPARATOR HIGH PRESSURE STEAM
EXPANSION JOINT
STRAINER
DRAIN
GOVERNOR VALVE
GOV.V.CASING
GOVERNOR
STEAM SENTINEL VALVE
CHEST
TO ATMOS
TRIP DEVICE
REDUCTION
STEAM TURBINE GEAR
TRIP DEVICE
TURBINE CASING DRAIN
EXPANSION
JOINT EXHAUST STEAM
TO ATMOS
OIL FLOW DIAGRAM
OF STEAM TURBINE
PRIM LO PUMP LOW LO
START & STOP PRESS.TRIP
ELECTRIC SOURCE
PG PG PG
TURBINE
CONTROL
PANEL
PRESSURE
REGULATING VALVE
TRIP
GOVERNOR SERVO MOTOR
VALVE
OIL FILTER w
JIS 5K
32A F.F
TG
TG GOVERNOR
C.W.OUTLET STEAM
CHEST M
OIL COOLER
S
C.W.INLET
TRIP
TG TG DEVICE
STEAM TURBINE REDUCTION LS
TG GEAR LS
TG
SHAFT
TG TG
END
DRIVEN
M
MAIN LO
COOLER
PRIM LO
PUMP
LUBE OIL RESERVOIR
LG
( BUILT IN COMMON BED )
TURBINE - CONSTRUCTION
TURBINE - CONSTRUCTION
GOVERNOR VALVE IS
DOUBLE SEAT TYPE
TO PREVENT
UNBALANCE BY THE
EFFECT OF STEAM
PRESSURE AND ALSO
ACTS AS AN
EMERGENCY STOP
VALVE SO THAT THIS
VALVE CLOSSES TO
STOP THE TURBINE
WHEN EMERGENCY
TRIP DEVICES WORK.
TURBINE - CONSTRUCTION
TURBINE GLAND IS
PROVIDED WITH
LABYRINTH PACKING.
IN CASE THE
EXHAUST STEAM
SUPPLIED TO
PROCESS, AN EJECTOR
DRIVEN BY A PART OF
EXHAUST STEAM
ACTUATES AND
PREVENT STEAM
LEAKAGE FROM
GLAND.
TURBINE - CONSTRUCTION
IN CONSIDERATION OF
ECONOMICAL TURBINE
OPERATION, A HAND
VALVE IS PROVIDED AND
ITS FULLY OPENED
DURING GENERATOR
OPERATION UNDER THE
RATED POINT AND
CLOSED UNDER 85-90% OF
LOAD TO PREVENT
TURBINE EFFICIENCY GO
DOWN.
REFER TO FIG.C1101-MS 52
TURBINE - CONSTRUCTION
3.4-STOPPING
DECREASE THE LOAD ON THE
TURBINE GRADUALLY.
CLOSE THE INLET STEAM
VALVE.ALSO STOPPING IS
POSSIBLE WHEN THE
REMOTE STOP OR THE HAND
TRIP ON THE TURBINE IS
ACTUATED.
WHEN SPEED DECREASES
AND OIL PRESSURE FALLS
BELOW 0.45KG/CM²G THE
PRIMING L.O. PUMP STARTS
AUTOMATICALLY,KEEPING
OIL PRESSURE ABOVE
0.3KG/CM²G.
TURBINE -OPERATION
CORROSION CORROSION
PROTECTIVE PIECE PROTECTIVE PIECE (IF
ON L.O. COOLER FITTED,THE PIECE IS
SHOWN IN THE SPARE
LIST AS ITS SPARE) IS TO
BE CHECKED EVERY 3
MONTHS AND
REPLACED IF ANY
4.2-ADJUSTMENT FOR ACCESSORIES & EMERGENCY TRIP
AS ALL PARTS OF THE TURBINE HAVE BEEN ADJUSTED AT
THE SHOP TRIAL, IT IS IMPORTANT TO AVOID
UNNECESSARY READJUSTMENT. HOWEVER, IF
READJUSTMENT IS REQUIRED PROCEED AS FOLLOWS:
SPEED GOVERNOR (WOODWARD GOVERNOR) REFER TO
THE SEPARATE INTRUCTION MANUAL OF WOODWARD
GOVERNOR. HOWEVER, THE ADJUSTMENT OF THE
INTERIOR IS VERY COMLICATED AND, THEREFORE, MUST
BE DO BY EXPERT. NEVER OPEN THE SEALED GOVERNOR
PART FOR THE ADJUSTMENT.
L.O PRESSURE ADJ.VALVE
L.O PRESSURE ADJ.VALVE
REPLACEMENT
LOCATION
AFTER INITIAL NORMAL
START OPERATION
L.O TANK WITHIN 3 EVERY 1 YEAR
MONTHS
WOODWARD WITHIN 3 EVERY 1 YEAR
GOVERNOR MONTHS
LUBRICANTS
ISO VG 68 (INTERNATIONAL STANDARD ORGANIZATION) FOR LUBRICATING
OIL FOR THE BEARING,THE REDUCTION GEAR AND THE
WOODWARD GOVERNOR ARE RECOMMENDABLE.
THE BRAND NAMES OF THE OILS EQUIVALENT TO THE RECOMMENDABLE ONE ARE SHOWN IN TABLE .
NO 1 2 3 4 5 6 7 8
STANDARD 0.15 – 0.2 0.2-0.3 0.2-0.3
CLEARANCE ( OVERALL ( OVERALL 0.10 – 0.14
( ON DIAMETER ) CLEARANCE ) CLEARANCE )
LIMIT OF
USE 0.23 0.4 0.24
NO 9 10 11 12 13 14 15 BACKLASH
STANDARD
CLEARANCE
0.15-0.19 0.23-0.26 0.2 – 0.24 2.2 –2.8 0.22-0.49
LIMIT OF
USE
0.29 0.36 0.34 1.5 – 3.5 -
TROUBLE SHOOTING
TROUBLES CAUSES REMEDIES
4. HIGH TEMPRATURE OF
COOLING WATER TO L.O 4. DECREASE COOLING WATER TEMPRATURE.
COOLER
TROUBLE SHOOTING
TROUBLES CAUSES REMEDIES