Nothing Special   »   [go: up one dir, main page]

0% found this document useful (0 votes)
40 views6 pages

Coal Handling Plant: Gadarwara Super Thermal Power Project

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1/ 6

GADARWARA SUPER THERMAL POWER PROJECT

STAGE-I: 2X800MW

COAL HANDLING PLANT


CHP LAYOUT
Wagon Tipplers
& Apron feedrs

B TP-1 TP-11 TP-12 TP-13


IR Boxen Wagon

S/R-2
Coal

YARD-4
Unloading
YARD-1

YARD-2

YARD-3

YARD-4
Area
TP-5 TP-6

S/R-1

CRUSHER TP-2 TP-3 TP-4


Towards
Bunkers
GADARWARA SUPER THERMAL POWER PROJECT
STAGE-I: 2X800MW, COAL HANDLING POINT

MAJOR
NOS CAPACITY BRIEF SEPECIFICATION
EQUIPMENTS

Wagon tippler 03 25 Tips/Hr Side discharge type

Apron feeder 03 2400 TPH Pan & Chain type

Coal Crusher 04 1320 TPH Ring Granulator


GADARWARA SUPER THERMAL POWER PROJECT
STAGE-I: 2X800MW, COAL HANDLING POINT

MAJOR
NOS CAPACITY BRIEF SEPECIFICATION
EQUIPMENTS
Unidirectional, rail mounted,
A) Stacker Reclaimer 02 2400 TPH
slewing, luffing & hydraulic
bucket wheel type.

04 5 Lakh MT 1.25 Lakh MT each yard


B) Coal Yard
C) Coal conveyors
system
1. Total length of
- 12.5 KM Total 27 No of Conveyors
conveyors
2. Belt speed - - 3.4 M/S
GADARWARA SUPER THERMAL POWER PROJECT
STAGE-I: 2X800MW, COAL HANDLING POINT

Environment Friendly Equipments

EQUIPMENTS NOS BRIEF SEPECIFICATION

Dust Suppression system 02 1) For Coal yard


(M/s Eagle) SET
2) Wagon Tippler area
Dry Fog Dust Suppression 02 For all conveyors system
Syatem SET
(F.Harley)
Dust Extraction system 01 For Crusher house
(M/s Ricoh)
GADARWARA SUPER THERMAL POWER PROJECT
STAGE-I: 2X800MW, COAL HANDLING POINT

Belt Protection & Safety equipments


 Pull Cord’s Switches
 Chute Block Switches
 Zero Speed Switches
 Belt Sway Switches
 Siren Hooters
 PA System
 CCTV Camera’s

You might also like