CRPO
CRPO
CRPO
Noted Note
Note [1]:
[2]: Modification only conductors
Existing wellhead to topside facilities, new new
shall remain; and retrofit
slipoverrisers,
jacketJ-tubes, riser, to
and topside andbeJ-tube supports, etc.
installed
Note [3]: Existing wellhead conductor and jacket shall be used. Entire Top side will be new
Note [4]: A completely new platform is proposed
IFB
Go by reference packag PIC Remark
e
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2 Hưng
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2 Hưng
EY306 MRJN TP-2A Platform Upgrade 2 Hưng
EY301 MRJN TP-4 Platform Upgrade 2 Hưng
Noted Note [1]: Modification only to topside facilities, new and retrofit risers, J-tubes, riser, and J-tube supports, etc.
Note [2]: Existing wellhead conductors shall remain; new slipover jacket and topside to be installed
Note [3]: Existing wellhead conductor and jacket shall be used. Entire Top side will be new
Note [4]: A completely new platform is proposed
IFB
Go by reference packag Remark
e
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY154 MRJN 162 & MRJN 176 10-Well WHP 2
EY202 MRJN 224-229 WHP Upgrade (SSS) 2
EY154 MRJN 162 & MRJN 176 10-Well WHP 2
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY151 MRJN 17-22 (4L-6W) Slipover Deck
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
EY251 MRJN TP-1 Auxiliary Platform 2
3
3
EY306 MRJN TP-2A Platform Upgrade 2
3
1,2
EY308 MRJN CGI TP Platform Upgrade 2
1
1
1
EY301 MRJN TP-4 Platform Upgrade 2