Line Scope From Well Go-by Reference

4"-001-GasLift Subsea Pipeline New MRJN 110/115,309,324 MRJN 46/51


4"-002-GasLift Subsea Pipeline New MRJN 65,78/82,305,323 MRJN 46/51
4"-003-GasLift Subsea Pipeline New MRJN 17/22
4"-004-GasLift Subsea Pipeline New MRJN 52/57
4"-005-GasLift Subsea Pipeline New MRJN 46/51
4"-006-GasLift Subsea Pipeline New MRJN 36/41
4"-007-GasLift Subsea Pipeline New MRJN 121/126
4"-008-GasLift Subsea Pipeline New MRJN 11/16
12"-001-New Oil Subsea Pipeline New MRJN 17/22
16"-001-New Oil Subsea Pipeline New MRJN 52/57
12"-002-New Oil Subsea Pipeline New MRJN 46/51
12"-003-New Oil Subsea Pipeline New MRJN 36/41
12"-004-New Oil Subsea Pipeline New MRJN 121/126
10"-001-New Oil Subsea Pipeline New MRJN 11/16
4"-009-GasLift Subsea Pipeline New LWHH 9/14
4"-010-GasLift Subsea Pipeline New LWHH 3/8
4"-011-GasLift Subsea Pipeline New LWHH 23/28
4"-012-GasLift Subsea Pipeline New LWHH 29/31
4"-013-GasLift Subsea Pipeline New LWHH 15/20,45
4"-014-GasLift Subsea Pipeline New MRJN 740/749
4"-015-GasLift Subsea Pipeline New MRJN 780/789
4"-016-GasLift Subsea Pipeline New MRJN 470/479
4"-017-GasLift Subsea Pipeline New MRJN 640/649
4"-018-GasLift Subsea Pipeline New MRJN 681/690
4"-019-GasLift Subsea Pipeline New MRJN 700/709
4"-020-GasLift Subsea Pipeline New MRJN 710/719
4"-021-GasLift Subsea Pipeline New MRJN 820/829
6"-001-GasLift Subsea Pipeline New MRJN TP7
6"-002-GasLift Subsea Pipeline New MRJN TP14
6"-003-GasLift Subsea Pipeline New MRJN TP10
6"-004-GasLift Subsea Pipeline New MRJN TP13
6"-005-GasLift Subsea Pipeline New MRJN TP1 AUX
6"-006-GasLift Subsea Pipeline New MRJN TP4
30" SL-001 New MRJN TP4
30" SL-002 New MRJN TP1 AUX
8"-Gaslift Supply New MRJN GOSP-4 TP
10" Lean Gas-H Supply New MRJN CGI TP1
10" Gaslift Supply New MRJN TP2
4" DEPR line New MRJN TP2A
Existing gas MRJN CGI TP1
16" Lean Gas line pipeline
Tie-in Legend To Well Type Well Legend
Jacket/Deck Replacement MRJN TP4 Deck Upgrade
Jacket/Deck Replacement MRJN TP4 Deck Upgrade
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP1 AUX New Platform
Jacket/Deck Replacement MRJN TP7 Deck Upgrade
Jacket/Deck Replacement MRJN TP7 Deck Upgrade
Jacket/Deck Replacement MRJN TP7 Deck Upgrade
Jacket/Deck Replacement MRJN TP7 Deck Upgrade
Jacket/Deck Replacement MRJN TP7 Deck Upgrade
Hook-up MRJN TP14 Future
Hook-up MRJN TP14 Future
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN TP10 Deck Upgrade
Deck Upgrade MRJN GOSP-4 TP Deck Upgrade
Deck Upgrade MRJN GOSP-4 TP Deck Upgrade
Deck Upgrade MRJN GOSP-4 TP Deck Upgrade
Deck Upgrade MRJN GOSP-4 TP Deck Upgrade
New Platform MRJN TP2A Deck Upgrade
Deck Upgrade MRJN TP2A Deck Upgrade
Deck Upgrade MRJN TP2A Deck Upgrade
New Platform MRJN TP2A Deck Upgrade
Deck Upgrade MRJN TP2A Deck Upgrade
Tanajib Gas Plant Onshore MRJN TP2 GOSP DE
GOSP DE MRJN TP2A Deck Upgrade
Deck Upgrade MRJN TP2 GOSP DE

Tanajib Gas Plant Onshore MRJN GOSP-4 TP Deck Upgrade


Tie-in
Replace
No Platform Designation Tie-In Jacket Upgrade
Flowline
6 MRJN 17/22 [2]
MTP-1 4L-6W Slipover Yes
New topside
11 MRJN 11/16 [2]
MTP-1 4L-6W Yes
/Slipover
14 MRJN TP-2A (MTP-2A [1]
) TP Deck Extension
17 MRJN TP-4 ( MTP-4 ) TP Upgrade

Noted Note
Note [1]:
[2]: Modification only conductors
Existing wellhead to topside facilities, new new
shall remain; and retrofit
slipoverrisers,
jacketJ-tubes, riser, to
and topside andbeJ-tube supports, etc.
installed

Note [3]: Existing wellhead conductor and jacket shall be used. Entire Top side will be new
Note [4]: A completely new platform is proposed
IFB
Go by reference packag PIC Remark
e
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2 Hưng
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2 Hưng
EY306 MRJN TP-2A Platform Upgrade 2 Hưng
EY301 MRJN TP-4 Platform Upgrade 2 Hưng

tube supports, etc.


Replace
No Platform Designation Tie-In Jacket Upgrade
Flowline
New topside
1 MRJN 110/115,30 [3]
MTP-4 6L-6W No
/Slipover
New topside
2 MRJN 65,78/82 [3]
MTP-4 6L-6W No
/Slipover
3 MRJN 176/185 MTP-4 Std.10-Well Deck Extension No
4 MRJN 224/229, 250 MTP-4 Old SSS Deck Extension No
5 MRJN 162/169, 174/175 [1]
MTP-4 Std.10-Well Deck Extension No
6 MRJN 17/22 [2]
MTP-1 4L-6W Slipover Yes
New topside
7 MRJN 52/57 [3]
MTP-1 6L-6W Yes
/Slipover
New topside
8 MRJN 46/51 [3]
MTP-1 6L-6W Yes
/Slipover
New topside
9 MRJN 36/41 [3]
MTP-1 6L-6W Yes
/Slipover
New topside
10 MRJN 121/126 [3]
MTP-1 6L-6W Yes
/Slipover
New topside
11 MRJN 11/16 [2]
MTP-1 4L-6W Yes
/Slipover
12 LWHH 9/14 [3]
MTP-7 6L-6W New topside No
13 LWHH 3/8 [3]
MTP-7 6L-6W New topside No
14 LWHH 23/28 [2]
MTP-7 UMP Slipover No
15 LWHH 29/34 [2]
MTP-7 UMP Slipover No
16 LWHH 15/20, 45 [2]
MTP-7 UMP Slipover No
17 MRJN 470/479 [1]
MTP-10 SSS Hook-up No
18 MRJN 640/649 [1]
MTP-10 SSS Hook-up No
19 MRJN 681/690 [1]
MTP-10 SSS Hook-up No
20 MRJN 820/829 [1]
MTP-10 SSS Hook-up No
21 MRJN 521/529 [1]
MTP-13 SSS Hook-up No
22 MRJN 730/739 [1]
MTP-13 SSS Hook-up No
23 MRJN 790/799 [1]
MTP-13 SSS Hook-up No
24 MRJN 740/749 [1]
MTP-14 SSS Hook-up No
25 MRJN 780/789 [1]
MTP-14 SSS Hook-up No
26 MTP-1 [1]
TP Upgrade
27 MTP-1 AUX. [4]
TP New Platform
28 MG-2 TP [1]
MG TP Deck Extension
Equipment
29 MG-2 GCP [1]
GCP
Upgrade
30 MRJN TP-2A (MTP-2A [1]
) TP Deck Extension
31 MG-3 TP [1]
MG TP Deck Extension
32 MG-4 TP [1]
MG TP Upgrade
33 MCGI TP1 [1]
CGI TP Upgrade
34 MTP- 10 [1]
TP Upgrade
35 MTP- 13 [1]
TP Upgrade
36 MTP- 14 [1]
TP Upgrade
37 MRJN TP-4 ( MTP-4 ) TP Upgrade

Noted Note [1]: Modification only to topside facilities, new and retrofit risers, J-tubes, riser, and J-tube supports, etc.
Note [2]: Existing wellhead conductors shall remain; new slipover jacket and topside to be installed

Note [3]: Existing wellhead conductor and jacket shall be used. Entire Top side will be new
Note [4]: A completely new platform is proposed
IFB
Go by reference packag Remark
e
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY154 MRJN 162 & MRJN 176 10-Well WHP 2
EY202 MRJN 224-229 WHP Upgrade (SSS) 2
EY154 MRJN 162 & MRJN 176 10-Well WHP 2
EY151 MRJN 17-22 (4L-6W) Slipover Deck 2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY152 MRJN 46-51,303,318 WHP Deck
2
EY151 MRJN 17-22 (4L-6W) Slipover Deck
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
EY251 MRJN TP-1 Auxiliary Platform 2
3
3
EY306 MRJN TP-2A Platform Upgrade 2
3
1,2
EY308 MRJN CGI TP Platform Upgrade 2
1
1
1
EY301 MRJN TP-4 Platform Upgrade 2

tube supports, etc.