Safety Induction-JGC
Safety Induction-JGC
Safety Induction-JGC
SAFETY INDUCTION
1.1. General
JCF CLIENT
Scope Of Work
Civil Work Hazard External Hazard
Piping Falling / Droped Clorine PT. PD 2,
Mechanical object Hazardous
Electrical Falling down disposal PT.TJ,
Instrument Mechanic Electric snake.
Commissioning Fire Explosion
2. JIND HSE Policy
2.2. Drugs And Alcohol Policy
PT. JGC Indonesia not to tolerate any form of Drugs and Alcohol abuse.
Line manager and supervisor are responsible for ensuring that this policy is
implemented and maintained.
Using drugs, alcohols, carrying weapon, and smoking inside site office
and site area are strictly prohibited.
Zero Injury
Zero Illness
Zero Property Damage
Zero Environmental Damage
4. HSE PERFORMANCE / KPI AND SITE HSE PROGRAM
HSSE Training
HSSE Induction, PTW System, WAH, CSE, HOT Work, etc
HSSE Meeting
Construction HSE Meeting, Tool Box Meeting
HSSE Inspection
Equipments and Tools Inspection, PPE inspection, etc.
HSSE Patrol
HSSE Committee patrol, etc
HSSE Award
Individual HSE award, Work Group HSE Award, Subcontractor HSE
Award
HSSE Audit
HSE MS Audit, Permit to Work System Audit
HSE CYCLE
5. SUSPENTION, TERMINATION AND ZERO TOLERANCE
5.1. Suspention
If in the performance of the WORK, any unsafe practices or conditions or
acts contrary to the proper execution or safety of personnel and the
WORK, the JIND has the right to suspend the WORK.
5.2. Termination
JIND has the right to terminate all or any part of the WORK if there
are any failure to meet the requirements to the section 1654- Health,
Safety, Security and Environment.
All employees of the Contractor and subcontractors must be fit for their
functions as regards their state of health in compliance with the laws.
Skrap besi
Sampah Plastik, material beton, potongan
makanan, karet pipa, plat besi,
kertas , karton
kaleng
Titik Pengumpulan
disetiap kantor lapangan
kontraktor dan
subkontraktor
7.3.2 Hazardous Waste
Semua Titik
minyak, bahan Pengumpulan
kimia, dan cat minimal 1 buah
yang telah tong B3 untuk
HAZARDOUS rusak setiap
WASTE Subcontractor.
7.3.3. Housekeeping
All driver shall comply with JCF traffic safety rules and traffic local
regulation.
All drivers and passengers shall make following the 7 golden rules
for Safe Driving and Safe Riding as their top priority during all
journeys or trips.
All vehicles shall not be allowed to operated at JCF PROJECT SITE and
the INSTALLATION SITE areas until the JCF or JIND authorized
person has confirmed in writing by the completion and sign off of the
Facilities, Equipment and Tools Acceptance Status as part of
GO/NO GO Criteria achieved.
8. SITE ACCESS CONTROL
8.1.Personnel Access
8.2.Visitor Access
Visitors who have business or are entering JCF construction site shall
left their government ID card (KTP) or others identity to
JCF/CONTRACTOR security on duty at entering gate. The daily
visitor badge will be issued by JCF/CONTRACTOR Security on duty
after having confirmed that the person to be visited is available for
the visit.
8. SITE ACCESS CONTROL
8.3.Vehicle Access
8.4.Material Access
All vehicle transportation materials to/from the job site are required
to have an approved Material/Equipment Entry and Removal
Authorization.
8.5. Site Working Hours
ER Flow
MUSTER
POINT
EVACUATION ROUTE
EVACUATHION ROUTE
EVACUATION ROUTE
EVACUATION ROUTE
EVACUATION ROUTE
9.3. Incident Report
3. IMPLEMENTATION & OPERATION
JCF Project