Nothing Special   »   [go: up one dir, main page]

Decklite Access Solutions

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 22

Introduction to New Technology of

Decklite Working Platforms


SAFE ACCESS SOLUTIONS

Presented by:

David Heaney
& Mathew Tang

Date: 21st May 2013


Presentation Outline
• Objectives
• Introduction
• Applications
• Benefits
• Implementation & Evidence
• Findings from offshore trial AMDP15/24
Brunei Fields
• Decklite vs Scaffold
• Decklite Design Certification
• Decklite Training & facility in Miri
• Way Forward
Objectives

To introduce you to the New Technology of


Decklite Working Platforms

To provide Safer Access for all Personnel

To provide Training to Multi Skill Personnel

To provide a safe alternative to conventional


access methods

To provide a commercial advantage for the Client


Introduction

DECKLITE IS A STRUCTURALLY ENGINEERED PLATFORM TO PROVIDE SAFE ACCESS


• A modular decking system to provide fast access to hard-to-reach areas.
• A safe alternative for clients worker, easy & safe to deploy thereby reducing
risk exposure (erection manhours) and increasing efficiency.
• Can be deployed where conventional scaffold is impracticable or too costly.
• Much reduced manpower, deck space, weight & storage compared to
scaffold.
• Direct access to the work zone with no build-up or down.
• Provides safe housing for dropped objects (DROPS) and minimal fallout.
• A safe system that withstands high winds & wave piercing situations in long,
or short term and extreme weather conditions.
• Hence offers the same safe access for the maintenance crews as traditional
scaffolding.

Challenge Session with Technical Authority and Field Engineer was conducted on : 15th
May 2013
Applications

Decklite Working Platform is a rigging deck module system to provide access


and/or maintenance of offshore oil platforms and the like as well as other
structures such as buildings and bridges.
• Below cellar decks of offshore platforms
• Heli-decks undersides, jack-up undersides, semi-submersible
undersides
• Platform jackets, drill derricks, bridge work applications
• Communication towers
• Inside tanks of FPSO’s and tankers, inside onshore storage tanks
• Under roofing
• Below production decks of offshore platforms
• Above a work force to prevent the risk of falling objects, as fall
protection below a work area.
Benefits of Decklite

 Takes less time and fewer people to erect.

 Reduce man power by a factor of 50%. Less Risk Exposure.

 Access directly to the working area with no build-up or down.

 Decklite will reduce manpower and floating resource costs.

 Short turnaround time of shutdowns.

 Decklite can also be used while Plant is operational.

 Soft Fall characteristics.

 Drop Object & Safe Splash Zone.


Implementation & Evidence

Decklite™ Implementation Report

1. Site specific surveys and design of support arrangements: Decklite is a


Modular System and can be installed in most areas immediately.
2. Awareness training of Maintenance Crew: Decklite provides in house
Training & Education.
3. Deployment of Decklite by small dedicated crew: Utilize the Trained
Client Contractors to work Together Towards New Technology.
4. Execution of Maintenance Tasks by Trained Crew: A multi skilled
access and maintenance team to complete the works quickly and
efficiently.
5. Demob of Decklite: 210 square meters of Decklite (1 modular kit) can
be deployed in 2 standard Barrung Boxes.
Implementation & Evidence

Findings from trial AMDP15/24-April 2010

Cost saving on POB cost:

Estimated Actual
Manhours: 1098 (17 days) Manhours: 979 (13 days)
Manpower: 17 pack Manpower: 13 pack
Cost per day POB: B$300 Cost per day POB: B$300
Total Cost POB: B$86,700 Total Cost POB: B$50,700

Cost saving of : B$36,000


Implementation & Evidence

Decklite vs Scaffold
Implementation & Evidence

Decklite vs Scaffold
Decklite Design Certification

• GL Design Certificate
• Wade Design Structural Certificate
• Decklite Calculation Package
• Decklite’s Structure Design:
• Design Validation
• GL Certifications
• Modular Panel Design
• Panel Layout Design
• Suspension Design
• Strut Design
• System Elevation & Section
APPROVED AND CERTIFIED WORLD WIDE

Fully Engineered
and Structurally
Certified to 250
kg every square
meter

Germanischer Lloyd
Complies to all Design Appraisal
Health & Safety and Certification for
requirements for Decklite Design
the Oil & Gas
Industry

Decklite Panels All materials &


are tested to components
destruction tested & proven
Decklite Training

All staff/client/contractor personnel who require access to


Decklite Working Platforms will be required to complete a
training course. …..
Decklite –CERSB MIRI Training Facility
DECKLITE COURSE 1
COURSE 1: CONTRACTORS, CLIENT PERSONNEL, INSPECTORS, MANAGEMENT

Course
No. Description Certificate

Course 1 Decklite Familiarization & Safety Induction

A one day course of familiarization to access the DWP such as double hook up
harness, Working at Height regulations and safety induction to carry out work on
the DWP without a Rope Access Certificate.

All personnel shall be supervised by a Decklite Supervisor (Course 3 Certified).

Attendees / Candidates:
Contractor and/or Client Personnel

Onsite Decklite Familiarization & Safety Induction

A brief on site induction for visitors who require access to the DWP (Decklite
Working Platform) such as inspectors and management an onsite course can be
conducted by a Decklite Supervisor (Course 3 Certified) and carried out at the job
site. The personnel shall be supervised at all times whilst accessing the DWP by
the Decklite Supervisor.

Attendees / Candidates:
Inspectors, management, visitors.
DECKLITE COURSE 2
COURSE 2: ROPE ACCESS IRATA LEVEL 1

Course
No. Description Certificate

Course 2
TNT Team – Multi Skilled Access
To carry out work whilst utilizing rope access skills. Install, Maintain,
Dismantle the DWP (Decklite Working Platform) & carry out skills of
trade on the DWP. Install, Maintain, and Dismantle the DSA (Decklite
Safety Accessories). To assist with the Deckroom Hotwork Enclosure.
Attendees / Candidates:
Certified Level 1 IRATA Rope Access
DECKLITE COURSE 3
COURSE 3: ROPE ACCESS LEVEL 3 IRATA

Course
No. Description Certificate

Course 3
Decklite Supervisor / Qualified Decklite Level 3 Technician
Supervisor – Full knowledge of the DWP HSE Guidelines &
Checklists. DWP installation, Maintain, Dismantle whilst using ropes.
Head of personnel / supervisor under the Decklite License
Agreement
Attendees / Candidates:
Certified Level 3 IRATA Rope Access
First Aid Certified
PROVEN OFFSHORE
Way Forward

• To seek SKO TRC Committee for the approval and


endorsement on this new technology.
• Offshore Pilot Trail for 3 months
• To pilot trial this concept to SKO maintenance programme
for risers, jacket leg column and bracings.
• Cost plus strategy will be used to engaged Decklite
Working Platform for the work.
• To establish long term contract should this approach is
proven to be safer and cost effective.