Borang Standard VOP
Borang Standard VOP
Borang Standard VOP
CHUKAI DAN KERJA-KERJA BERKAITAN BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : October, 2011
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month (9) This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 153.89 153.89 0.744 0.784 0.040 5.38% 3,847.20 153.89 0.00 3,847.20 0.00 153.89
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : April, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 929.90 1,083.79 0.744 0.784 0.040 5.38% 23,247.60 929.90 3,847.20 27,094.80 153.89 1,083.79
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Mei, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,308.00 2,391.79 0.744 0.784 0.040 5.38% 32,699.92 1,308.00 27,094.80 59,794.72 1,083.79 2,391.79
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Jun, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,560.17 3,951.96 0.744 0.784 0.040 5.38% 39,004.32 1,560.17 59,794.72 98,799.04 2,391.79 3,951.96
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Julai, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,884.91 5,836.87 0.744 0.784 0.040 5.38% 47,122.64 1,884.91 98,799.04 145,921.68 3,951.96 5,836.87
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Ogos, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,591.53 7,428.40 0.744 0.784 0.040 5.38% 39,788.32 1,591.53 145,921.68 185,710.00 5,836.87 7,428.40
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : September, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,620.33 9,048.73 0.744 0.784 0.040 5.38% 40,508.32 1,620.33 185,710.00 226,218.32 7,428.40 9,048.73
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Oktober, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,837.90 10,886.63 0.744 0.784 0.040 5.38% 45,947.44 1,837.90 226,218.32 272,165.76 9,048.73 10,886.63
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : November, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,371.63 12,258.26 0.744 0.784 0.040 5.38% 34,290.64 1,371.63 272,165.76 306,456.40 10,886.63 12,258.26
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Disember, 2003
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 528.53 12,786.79 0.744 0.784 0.040 5.38% 13,213.36 528.53 306,456.40 319,669.76 12,258.26 12,786.79
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Januari, 2004
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,477.64 14,264.43 0.744 0.784 0.040 5.38% 36,940.88 1,477.64 319,669.76 356,610.64 12,786.79 14,264.43
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Febuari, 2004
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,678.45 15,942.88 0.744 0.784 0.040 5.38% 41,961.36 1,678.45 356,610.64 398,572.00 14,264.43 15,942.88
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Mac, 2004
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 2,147.64 18,090.52 0.744 0.784 0.040 5.38% 53,691.12 2,147.64 398,572.00 452,263.12 15,942.88 18,090.52
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : April, 2004
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 1,989.52 20,080.04 0.744 0.784 0.040 5.38% 49,738.00 1,989.52 452,263.12 502,001.12 18,090.52 20,080.04
LAMPIRAN IV Contract No : JPS/P/TG/S/5/02 Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN UTAMA FASA II, SERTA KERJA-KERJA YANG BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE SUMMARY OF PRICE VARIATION FOR STEEL, CEMENT, DIESOLINE, FUEL OIL AND BITUMENS FOR THE MONTH OF : Mei, 2004
MATERIAL
UNIT
CUMULATIVE TOTALS QUANTITIES Last Month This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12)
(2) ROUND STEEL BARS BS 785 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Mycon 60 1/4" (6mm) 3/8" (9mm) 1/2" (12mm) 5/8" - 1" (16 - 25mm) 1 1/8" (29mm) 1 1/4" (32mm) Ordinary Portland Cement BS12 Automative Gas Oil (Diesoline) Fuel Oil (Light/Medium) Bitumens 1. 80/100 Penetration 2. Cut-Back Bitumen
(3)
(4)
(5)
(6)
(8)
(9)
(13)
Metric Ton " " " " " 50 kg bag Litre Litre Metric Ton " TOTAL PRICE VARIATION FOR THE MONTH 578.74 20,658.78 0.744 0.784 0.040 5.38% 14,468.48 578.74 502,001.12 516,469.60 20,080.04 20,658.78
SUMMARY OF PRICE VARIATION FOR Contract No : JPS/P/TG/S/5/02 STEEL, CEMENT, DIESOLINE, FUEL Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN OIL AND BITUMENS FOR THE MONTH UTAMA FASA II, SERTA KERJA-KERJA YANG OF : January, 2003 - May, 2004 BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE UNIT DIFFERENCE PRICE FOR THE AMOUNT % MONTH QUANTITY 0F MATERIAL DELIVERED/ INCORPORATED CONSUMED IN THE MONTH (7) PRICE VATIATION FOR THE MONTH (8)
Disediakan Oleh: Jawatan : Tandatangan : CUMULATIVE TOTALS QUANTITIES Last Month (9) This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12) MAXIMUN QUANTITIES FIXED UNDER CONTRACT
ITEM
MATERIAL
UNIT
(1) 1
(3)
(4)
(5)
(6)
(13)
Litre
0.744
0.764
0.020
2.69%
0.00
0.00
0.00
0.00
0.00
0.00
Litre
0.744
0.764
0.020
2.69%
0.00
0.00
0.00
0.00
0.00
0.00
Litre
0.744
0.784
0.040
5.38%
3,847.20
153.89
0.00
3,847.20
0.00
153.89
Litre
0.744
0.784
0.040
5.38%
23,247.60
929.90
3,847.20
27,094.80
153.89
1,083.79
Litre
0.744
0.784
0.040
5.38%
32,699.92
1,308.00
27,094.80
59,794.72
1,083.79
2,391.79
Litre
0.744
0.784
0.040
5.38%
39,004.32
1,560.17
59,794.72
98,799.04
2,391.79
3,951.96
Litre
0.744
0.784
0.040
5.38%
47,122.64
1,884.91
98,799.04
145,921.68
3,951.96
5,836.87
SUMMARY OF PRICE VARIATION FOR Contract No : JPS/P/TG/S/5/02 STEEL, CEMENT, DIESOLINE, FUEL Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN OIL AND BITUMENS FOR THE MONTH UTAMA FASA II, SERTA KERJA-KERJA YANG OF : January, 2003 - May, 2004 BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE UNIT DIFFERENCE PRICE FOR THE AMOUNT % MONTH QUANTITY 0F MATERIAL DELIVERED/ INCORPORATED CONSUMED IN THE MONTH (7) PRICE VATIATION FOR THE MONTH (8)
Disediakan Oleh: Jawatan : Tandatangan : CUMULATIVE TOTALS QUANTITIES Last Month (9) This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12) MAXIMUN QUANTITIES FIXED UNDER CONTRACT
ITEM
MATERIAL
UNIT
(1) 8
(3)
(4)
(5)
(6)
(13)
Litre
0.744
0.784
0.040
5.38%
39,788.32
1,591.53
145,921.68
185,710.00
5,836.87
7,428.40
Litre
0.744
0.784
0.040
5.38%
40,508.32
1,620.33
185,710.00
226,218.32
7,428.40
9,048.73
10
Litre
0.744
0.784
0.040
5.38%
45,947.44
1,837.90
226,218.32
272,165.76
9,048.73
10,886.63
11
Litre
0.744
0.784
0.040
5.38%
34,290.64
1,371.63
272,165.76
306,456.40
10,886.63
12,258.26
12
Litre
0.744
0.784
0.040
5.38%
13,213.36
528.53
306,456.40
319,669.76
12,258.26
12,786.79
13
Litre
0.744
0.784
0.040
5.38%
36,940.88
1,477.64
319,669.76
356,610.64
12,786.79
14,264.43
14
Litre
0.744
0.784
0.040
5.38%
41,961.36
1,678.45
356,610.64
398,572.00
14,264.43
15,942.88
SUMMARY OF PRICE VARIATION FOR Contract No : JPS/P/TG/S/5/02 STEEL, CEMENT, DIESOLINE, FUEL Project : MEMBINA DAN MENYIAPKAN SISTEM SALIRAN OIL AND BITUMENS FOR THE MONTH UTAMA FASA II, SERTA KERJA-KERJA YANG OF : January, 2003 - May, 2004 BERKAITAN DI KAMPONG PENGAKALAN PANDAN, CUKAI, KEMAMAN, TERENGGANU DARUL IMAN. BASIC UNIT PRICE UNIT DIFFERENCE PRICE FOR THE AMOUNT % MONTH QUANTITY 0F MATERIAL DELIVERED/ INCORPORATED CONSUMED IN THE MONTH (7) PRICE VATIATION FOR THE MONTH (8)
Disediakan Oleh: Jawatan : Tandatangan : CUMULATIVE TOTALS QUANTITIES Last Month (9) This Month (7)+(9) (10) V.O.P. AMAUNTS Last Month (11) This Month (8)+(11) (12) MAXIMUN QUANTITIES FIXED UNDER CONTRACT
ITEM
MATERIAL
UNIT
(1) 15
(3)
(4)
(5)
(6)
(13)
Litre
0.744
0.784
0.040
5.38%
53,691.12
2,147.64
398,572.00
452,263.12
15,942.88
18,090.52
16
Litre
0.744
0.784
0.040
5.38%
49,738.00
1,989.52
452,263.12
502,001.12
18,090.52
20,080.04
17
Litre
0.744
0.784
0.040
5.38%
14,468.48
578.74
502,001.12
516,469.60
20,080.04
20,658.78
20,658.78
Disediakan :
Disemak Oleh :
Disahkan Oleh :
JPS Kemaman
JPS Kemaman
JPS Kemaman