1. INTRODUCTION………………………………………………………………. 4
2. PROJECT BACKGROUND…..………………………………………………. 4
3. SCOPE OF PROJECT………………………………………………………….. 5
4. SCOPE OF WORK……………………………………………………………… 6
6. PROJECT BENEFITS……………………………………………..……………. 7
8.1 CONTRACTS………………………………………………………..… 9
8.3 COST…………………………………………………………………….. 11
10. ARBITRATION…………………………………………………………………. 20
13. BIBLIOGRAPHY………………………………………………………………… 22
Reg.no.-217-03-11-50899-2193 Page 3
PGP CM(PGCM 23)
1. INTRODUCTION
Contract management is the process that enables both
parties to a contract to meet their obligations in order to deliver
the objectives required from the contract. It also involves
building a good working relationship between customer and
provider. It continues throughout the life of a contract and
involves managing proactively to anticipate future needs as well
as reacting to situations that arise.
2. PROJECT BACKGROUND:
The development and up-gradation of National
Highway 4 which is a major National Highway in Western and
Southern India. NH 4 links four of the most populous Indian
cities - Mumbai, Pune, Bangalore and Chennai. NH 4 is
1,235 km (767 mi) in length and passes through the states
of Maharashtra, Karnataka, Andhra Pradesh and Tamil Nadu.
Reg.no.-217-03-11-50899-2193 Page 4
PGP CM(PGCM 23)
3. SCOPE OF PROJECT:
The scope of the project shall mean and included, during
the construction period:
Reg.no.-217-03-11-50899-2193 Page 5
PGP CM(PGCM 23)
4. SCOPE OF WORK:
The scope of work consists of providing four lane roads
with entry exit ramps from 340.00 km to 404.00 km with a
minimum clear vertical clearance of 5.5m from formation level
of existing bridges /roads/culverts. The scope of work also
includes, upgrading, widening, improving the existing roads
(NH-4/SH/local) roads near the entry exit rump locations with
suitable junctions drainage, cross drainage works , road safety
features, lighting etc, and 8 lane toll plaza with concrete
pavement, concrete retaining walls/ embankments for ramps,
drainage, restoration of embankment of river through which the
alignment is passing, fencing of row project highway, noise
barriers.
d) BM -75mm
e) DBM -110 mm in two layers
f) BC - 50mm
Reg.no.-217-03-11-50899-2193 Page 6
PGP CM(PGCM 23)
6. PROJECT BENEFITS:
The National Highways Developed Project (NHDP) has
great economic & social benefits which are summarized as
below-
a) Stimulate economic growth and reduce poverty in the
medium and long term
b) Rapid industrial development in the adjoining
c) Increase in job opportunities & norms
d) Benefits to trade especially in movement of perishable
goods
e) Faster and comfortable journeys by reduction in travel
time & traffic
f) Safer travel i.e. reduction in road accident congestion
g) Reduction in Vehicle Operating Cost and fuel
consumption
Reg.no.-217-03-11-50899-2193 Page 7
PGP CM(PGCM 23)
5. CONSTRUCTION 30 Months
PERIOD
6. NO. OF BRIDGES 15 Noz
(Excluding R.O.Bs and
Flyover)
7. NO. OF CULVERTS 43 Nos.
Concessionaire
AFCONS JV
EMPLOYER
NHAI
Consultant
Supervision
Hires
Reports To
Supervises
Reg.no.-217-03-11-50899-2193 Page 9
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 10
PGP CM(PGCM 23)
8.3. COST:
Subject to and on the terms and conditions of the
agreement the concessionaire shall at its cost expense procure,
finance for and undertake the design engineering, procurement,
construction, operation and maintenance of project highway and
observe, fulfill comply with:-
Reg.no.-217-03-11-50899-2193 Page 11
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 12
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 13
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 14
PGP CM(PGCM 23)
For the civil work there are three fields to look after. In
highway section.
a) Highway department.
b) Structure Department.
c) Lab Department.
Following is the main function of DPM.
Reg.no.-217-03-11-50899-2193 Page 15
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 16
PGP CM(PGCM 23)
d) Making all the level sheet and getting all the layer
checked by the consultants for approval of bed in case of
living way.
e) Making all the testing and work out the test result,
making all the design trial accordingly to instruction of ME
and finalize the mire design in case of quality.
These are non technical staff and they have to follow the
instruction of their in charges and doing work accordingly.
Reg.no.-217-03-11-50899-2193 Page 18
PGP CM(PGCM 23)
Reg.no.-217-03-11-50899-2193 Page 19
PGP CM(PGCM 23)
10. ARBITRATION:
In case of any dispute occurrs with the client then the
management call for the arbitration, which is domestic forum of
resolution of dispute the cause of disputes could be due to the
contractor or the employer. The arbitrator resolves the disputes
between the employer and the contractor and his verdict is
legally enforceable arbitration is one of the quickest and
amicable means of dispute resolution.