Airpix - Drone Solutions For Mining Industry
Airpix - Drone Solutions For Mining Industry
Airpix - Drone Solutions For Mining Industry
Autonomous Navigation
Range : up to 5 km
Establishing Data
Data Export
Ground UAV Processing
and
Data
Control Flights and Geo- Analysis
Points Visualizations
referencing
• Ground Control • UAV is • Photogrammetric • Using the Ultra High • Data analysis in the
Point markers are autonomously processing of Raw Density 3D Point form of accurate 2D
established over flown over the Aerial Photographs is Cloud, data is and 3D
surveyed area which area to be carried out to exported into Highly measurements,
are meant to be surveyed at generate Ultra High detailed feature extraction,
captured in UAV appropriate Density 3D Point Orthophoto, slope analysis, best
imagery. Accurate altitude along the Cloud of the DEM/DSM, Textured path analysis, cut
GPS co-ordinates of designed flight complete Survey Mesh, etc. in and fill volume
the markers are path. High Area. The Data is standard formats. analysis, etc. can be
taken for Geo- resolution Accurately Geo- The high resolution carried out over the
Referencing of geotagged aerial referenced using data can be high resolution
Processed Data photographs of Ground Control Point visualized in 2D as processed data
survey area are Co-ordinates well as 3D formats
acquired
Processed Data : High Resolution Orthophoto
High resolution images acquired through UAV flights are seamlessly stitched and
orthorectified to produce highly detailed ortho-imagery. The data is accurately
georeferenced and can be in GIS compatible formats for the purposes of detailed base
mapping, image classification, planimetric measurements, compliance checks,
tree count etc. The enhanced resolution of our data allows for better object recognition
and feature extraction in addition to accurate measurements.
The mine’s initial CAD drawing can be overlaid on the processed data provided by AIRPIX:
• for initial mining planning & designing of a newly leased mine
• to check for conformity to lease & environmental compliance
• to make changes in the execution plan if necessary with respect to actual progress on site
Data Formats Compatible with Surpac
CONTOURS
Monitoring Change in Bench Status
Status as on October 2016
Thank You!
Shinil Shekhar
shinil@airpix.in | +91 9619 123 020