ST Mary's Junction Improvement Phasing Plan
ST Mary's Junction Improvement Phasing Plan
ST Mary's Junction Improvement Phasing Plan
Proposed carriageway.
3 PHASE 3 - Medina Way Southbound The traffic management for this phase is to
consist of a lane closure with all eastbound traffic 8 PHASE 8 - Parkhurst Road (Cul-de-sac)
Estimated Duration: 5 Weeks traveling along Forest Road diverting onto the Estimated Duration: 3 Weeks
westbound lane and continuing through to St
Phase 3 is to commence upon the completion of Mary's Roundabout. All westbound traffic will use Phase 8 is to run concurrently with Phase 7.
Phases 1 and 2. an alternative signed diversion route.
The proposed works are to consist of new
The proposed works are to consist of realigning
the existing carriageway to two lanes,
9
carriageway construction, traffic island
construction and the realignment and re-kerbing
of the central reservation where required.
6 PHASE 6 - Forest Road Eastbound incorporating a layby for on street parking and
constructing a new turning head facility.
Estimated Duration: 3 Weeks Alterations to the existing public footway will also
be undertaken to facilitate all existing vehicle
The traffic management for this phase is to The proposed works are to consist of carriageway crossings whilst formalising a new shared use
consist of a lane closure with all traffic using the and footway construction completing the path.
newly constructed inside lane on the approach to proposed highway link from Forest Road through
St Mary's Roundabout. to Medina Way. This phase will also complete the The traffic management for this phase is to
the proposed controlled pedestrian crossing on consist of a full road closure at Hunny Hill /
During carriageway surfacing all traffic may be Forest Road.
required to use the western most carriageway where Parkhurst Road with all traffic using signed
a two-way traffic system will be implemented. diversion routes. During this phase of the works
STOP
BUS
BUS
STOP
1 Based upon the Ordnance Survey mapping with permission of
the Controller of Her Majesty's Stationery Office. © Crown
Copyright Unauthorised reproduction infringes Crown copyright
2 8
and may lead to prosecution or civil proceedings
4
6
5 Island Roads
St. Christopher House
42 Daish Way
Newport
Isle of Wight
PO30 5XJ
Paul Herbert
Service Director, Island Roads
Classification UNMARKED
PRESENTATION
Project
CONSTRUCTION PHASE
PLAN
Approved Date