H124 76-10526-Detail Design: Drainage - Ground Floor (High Level) Part 1
H124 76-10526-Detail Design: Drainage - Ground Floor (High Level) Part 1
H124 76-10526-Detail Design: Drainage - Ground Floor (High Level) Part 1
A
BL
QI
Notes
1 2 5 6
3 4
No Revision
Job Project
Drawn Manager Director Date
LIFT
SHIFT COMMANDER - STAIR # 1
ARFF Note: * indicates signatures on original issue of drawing or last revision of drawing
D Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.
CO DAY ROOM
MALE LOCKERS
TR. OFFICER
VP 50 Master Developper / Owner
WP 100
F: +971 (0) 2 575 8300
150mm VP T/A
100mm VP RISER
VP 50
DINING 100mm VP T/A
C
150mm SWP RISER Lead Consultant
CORRIDOR
VP 150
SP 100
BA COMPRESSOR &
W/SHOP
BA STORE
PRAYER
SP 100
WP 80
SPARE ABLUTION GHD GLOBAL PTY LTD
1 3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
H131 T 971 2 6968700 F 971 2 4472915
SPARE KITCHEN E abumail@ghd.com W www.ghd.com
Specialist Consultant
JANITOR
WP 100
SPARE SP 100
FAHU
Specialist Consultant
TELECOM
150mm SWP RISER
DIESEL GENERATOR STAIR # 2
Third Party
Operational Advisor
100mm VP A
150mm SWP RISER
100mm WP RISER TO BELOW
AND 100 VP RISER
100mm SP RISER TO BELOW
AND 100 VP RISER
Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
DRAINAGE - GROUND FLOOR (HIGH LEVEL) PART 1 Title