H140 76-10526-Detail Design: U1 U2 U3 U4 U5 U6 UC U7
H140 76-10526-Detail Design: U1 U2 U3 U4 U5 U6 UC U7
H140 76-10526-Detail Design: U1 U2 U3 U4 U5 U6 UC U7
U1 U2 U3 U4 U5 U7
N
A
BL
QI
25mm CDP AT H/L
DROP TO L/L Notes
UC REFER TO HVAC DRAWINGS FOR THE FINAL LOCATION OF THE CONDENSATE UNITS.
K IU
FCU FCU WATER TANK WATER TANK
HV ROOM
PUMP ROOM
UB
J
STAIR # 4
25mm CDP AT H/L IU
I IU
UA
25mm CDP AT H/L 25mm CDP AT H/L 25mm CDP AT H/L
DROP TO L/L DROP TO L/L DROP TO L/L
H
A ISSUED FOR TENDER FV BM* AH* 08.03.15
No Revision
Job Project
Drawn Manager Director Date
G prepared and must not be used by any other person or for any other purpose.
F
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300
Lead Consultant
E
25mm CDP AT H/L 32mm CDP AT H/L FCU GHD GLOBAL PTY LTD
WORKSHOP 3rd Floor, Guardian Tower, Danet Community
FIRE MAN'S LOBBY PO Box 45921 Abu Dhabi United Arab Emirates
32mm CDP AT H/L FCU
T 971 2 6968700 F 971 2 4472915
DROP TO L/L TO FD SHIFT COMMANDER - E abumail@ghd.com W www.ghd.com
STRL.
STAIR # 1 25mm CDP AT H/L
FCU TRAINING ROOM Specialist Consultant
1 2 6
Drafting Design
4 5 7 8 9 10 11 12
Check
Approved
Check
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
LEVEL A1
SCALE 1 : 150
DETAIL DESIGN 76-10526- H140 Rev: A
Plot Date: 7/03/2015 10:28:03 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt