Trainees Name Facilatators Name Qualification Computer Hardware Servicing NC Ii Project-Based Assessment
Trainees Name Facilatators Name Qualification Computer Hardware Servicing NC Ii Project-Based Assessment
Trainees Name Facilatators Name Qualification Computer Hardware Servicing NC Ii Project-Based Assessment
EVIDENCE PLAN
TRAINEES NAME
FACILATATORS NAME
Witten Test
Ways in which evidence will be collected:
Demonstration
[tick the column]
Interview
The evidence must show that the candidate
1 Configured computer systems and networks identified from the
X
Job/Service Order or instructions.
2 Planned and prepared job requirements. X
3 Followed OHS policies and procedures of job requirements. X
4 Checked computer systems and networks configuration with specified
X
requirements.
5 Checked necessary tools, equipment materials X
6 Appropriate Personal Protective Equipment are used and OHS policies
X
and procedures followed
7 Normal function of systems and networks checked in accordance with
X
manufacturers instructions
8 Fault or problem in the systems and networks diagnosed in line with the
X
standard operating procedures.
9 Computer systems and networks configured in line with the standard
X
operating procedures.
10 Final inspections are undertaken to ensure that the configuration done
on the systems and networks conforms with the manufactures X
instruction/manual
11 Computer systems and networks are checked to ensure safe operation. X
12 Report is prepared and completed according to company requirements. X
NOTE: *Critical aspects of competency
DEMONSTRATION WITH QUESTIONING CHECKLIST
TRAINEES NAME
TRAINERS NAME
QUALIFICATION COMPUTER HARDWARE SERVICING NC II
UNIT OF COMPETENCY 1 Diagnose and Troubleshoot Computer
COVERED Systems and Networks
DATE OF EVALUATION
TIME OF EVALUATION
INSTRUCTIONS FOR DEMONSTRATION
Given the necessary materials, tools and equipment, the trainee must be able to perform
the following within four (4) hours
Install Computer Systems and Networks
1 Given a working personal computer you are going to network using hub
and then Change the computer name and workgroup, assign static IP
address add printer and perform printer sharing.
Duration: 1 hour
A Demonstration
Recommendation