Method of Statement For The Construction of RC Pipe Support - R0
Method of Statement For The Construction of RC Pipe Support - R0
Method of Statement For The Construction of RC Pipe Support - R0
MUKAH,
BAHAGIAN MUKAH, SARAWAK
PHASE 2 PACKAGE 3 : PROPOSED NEW BOOSTER STATION,
RESERVOIR , DELIVERY MAIN, RETICULATION PIPELINE AND
ASSOCIATED FACILITIES
WORK METHODOLOGY
The construction sequence for the concrete works is as below:
I.
II.
III.
IV.
V.
Setup the gridlines as per construction drawing for the footing location
Excavate around the pile driven with extra precaution to ensure the
driven piles are not damage due to the excavation works
Carry out the excavation to require depth, then pile to be cut off at the
cutoff level
Check the level of base is correct, then pour lean concrete before
install the steel reinforcement
Once complete the steel reinforcement work, the next step is to install
the formwork
VI.
VII.
VIII.
IX.
X.
Concrete Vibrator
Excavator
MATERIALS
The list of materials for the concrete work include :
a) Concrete G25
b) Reinforcement bar
c) Formwork such as plywood and timber planks