Well Killing Operation
Well Killing Operation
Well Killing Operation
Packer Engineer must Unset Packer before the crew POOH & pumps
Killing Fluid to circulate wellbore.
The crew should POOH & observed if there is kick or high gas
production by observed killing fluid in tubing (the quantity of KCL &
speed of KCL meanwhile killing fluid exit from the tubing).
If the quantity of gas is high the crew must closed BOP (Pipe Ram) &
connect safety valve and kill the well by above procedures.
Prepared by: