India Process Control Plan ( ) PROTOTYPE, ( ) PRELAUNCH, (√ )PRODUCTION Date :-20//09/24
Hardness Testing
Copper Tube Grade, Hardness ETP grade, Min 90 HV5 (HD), machine-02,
-- 1 pc./Batch.
& Conductivity . Min 97% I.A.C.S. Conductivity meter-
Raw Material PO, Supplier TC 02
Raw Material
[As per RM Specification If NOK, reject & return
OP-10 Inward / incoming - RM Inspection Report
QAD/CH/02 & quality to the supplier
inspection I.D. = 10.0
plan (QAD-QP-01) (RM) ] I.D., 10.0 mm Digital Vernier
mm(± 3%)
O.D. , 14.0 mm Calliper-15, Min. 5 pcs./Batch.
O.D. = 14.0
Length 8' or 10' Measuring Tape-01
mm(± 3%)
Tube
Chamfering machine
Champhering
1st pcs Setup
As per quality plan (QAD-QP-01) Dim. of tube Champhering Beval protector-
Setting 60° (± 5°) - 1st pcs of setting
(Lug) angle 01 If any problem, stop
Approval
the m/c immediately &
Insprocess Inspection
Inprocess Chamfering As per quality plan (QAD-QP-01) Dim. of tube Champhering Beval protector- inform to production
OP-40 60° (± 5°) - Min. 5 pcs./2 hrs Report.
Inspection machine (Lug) angle 01 supervisor and
Setting work instruction
supervisor will be
rectify the tool / Die.
Last pcs As per quality plan (QAD-QP-01) Dim. of tube Champhering Beval protector- Last 1 pcs after
60° (± 5°) -
Approval (Lug) angle 01 production
Dropping Dropping
I.D., 8.8 mm (± 0.24 mm)
Vernier Calliper-
As per dropping size chart O.D. , 13.0 mm (± 0.39 mm) -
15
Dropping Length 19 mm (± 0.57 mm)
Inspection
Manually Drawing No. HEX/CSA 50/23 [As Vernier Caliper- If NOK, segregate
Before Tin Min.5 pcs./ Befor plating
OP-90 /Inspecion per quality plan (QAD-QP-01) Dims. of formed terminal All dims as per dwg - 15 /Visual production parts &
Plating Batch. Inspection Report.
instruments (Lug)] check. rework or reject.
process
If any problem
inform to store
Inspection of incharge / packing/ If
Batch code should not be old Dispatch
plating material Manually - Plated material shelf life - Visual check All / lot batch code is old
more than six month Details.
shelf life more than 6 month
OP-140 then send for
replatting
If any problem
Dispatch to Dispatch
Manually - Material As per MSSL / HEX schedule - Visual check All / lot inform to store
customer Details.
incharge / packing
Note : 1) Any material which is under suspicion for Quality parameter ( During setting change,M/C breakdown, shift changeover ) is kept with separate tag and bin and is 100 % inspected before dispatch.