QAP For MS Fittings
QAP For MS Fittings
QAP For MS Fittings
P. 1/ 2
Item :- MS fitting (Black /
Galvanized) Rev. 00 Date
4 Finished Pipe Identification & 100 Sam Tender Spec. / PO Spec. /Approved IR P W
marking % pling Drg./ DS
as
per
IS
4711
Digitally signed by Krushna
Notes :- Prasad Pradhan
DN: cn=Krushna Prasad Pradhan,
1. Surface protection (outside & inside) shall be as per NTPC technical specs/approved drawing/datasheet. o=NTPC Ltd., ou=TSTPS,
email=kppradhan01@ntpc.co.in,
2. Y mark in Column ‘D’ means such document shall be furnished by the manufacturer / supplier. c=IN
Date: 2023.08.23 15:44:50 +05'30'
MANUFACTURING QUALITY PLAN
P. 2/ 2
Item :- MS fitting (Black /
Galvanized) Rev. 00 Date
3. Calibrated equipment required for performing the tests in presence of NTPC or authorized representative, shall be arranged by the supplier without any extra cost.
SL. COMPONENT/ CHARAC- QUANTUM REFERENCE ACCEPTANC FORMAT AGENC
REMARKS
NO. OPERATION TERISTICS OF CHECK DOUMENT E NORM OF Y
D
RECORD
M N
M N
4. Reference and Acceptance norms shall be derived from following in the same sequence-
a) NTPC Approved drawing / data sheet ; b) NTPC tech specs ; c) Purchase Order ; d) Relevant national standard ; e) Relevant International standard ;
f) Manufacturer's standard ; g) Good Engineering practices.
Abbreviations :-
M Manufacturer P Perform IR Inspection Record / Report
N NTPC Ltd or authorized representative W Witness TC Test Certificate
CoC Certificate of Conformance V Review of records MTC Manufacturer’s Test Certificate