Experiment No.
AIM
To conduct load test on a single phase transformer and to determine the %
efficiency and % voltage regulation.
APPARATUS REQUIRED
1. Voltmeter
2. Ammeter
3. Wattmeter
4. DPST switch
5. Connecting wires
PRECAUTIONS
27
DESIGN OF APPARATUS REQUIRED
28
PROCEDURE
1. Make the connections as shown in circuit diagram 4.1.
2. Close the DPST S1.
3. Adjust the auto transformer to apply rated voltage across the primary winding.
4. Close the DPST S2 and note down the no load readings.
5. Apply the load and note down the ammeter, voltmeter and wattmeter readings.
6. Repeat step 5 till the ammeter reads the rated current.
7. Open all the load switches one by one. Open DPST S2.
8. Bring the auto transformer to zero position.
9. Open DPST S1 and disconnect the circuit.
FORMULA TO BE USED
where,
Wp - Input power in the primary (W)
Ws - Output power in the secondary (W)
Vso - No load secondary voltage (V)
Vs - Secondary voltage at load (V)
29
TABLE – 3.1 (b)LOAD TEST ON SINGLE PHASE TRANSFORMER
10
30
MODEL CALCULATION
31
MODEL CALCULATION
32
MODEL GRAPHS
() Regulation
Efficiency
()
RESULT
INFERENCE