Daily Work Progress Report of STP Dated 4th June
Daily Work Progress Report of STP Dated 4th June
Daily Work Progress Report of STP Dated 4th June
20. Operator 6
Mr.Yan Wei Safety Engineer/ Manager/Officer
2. Procurement Officer 2 12. 1
Mr. Zheng Hongjiang (Mr.Huang Yi Cheng)
11 12
Electrician/operators 0 Shotcretor/ Mason Unskilled Driller 0 Operator 3
Shotcretor/ Mason
Worker 2 Operators 5 Technical/Supervisior 2 6
Unskilled
25. Slope Protection MR 1 & Road maintenace work 26. BY-Pass 1and By-pass 3
Driller/Shotcrete worker
7 Worker at road maintenace 10 Worker in By-Pass 3 4 Driller in By-Pass 1 4
in MR-1
Workers/Operators in MR- 23 Technical/Supervisi 12
4 0 Technical/Supervisior in By-Pass 3 2 2
1 or in By-Pass 1
Technician/Supervisor in
2 0 Electrician/welder
MR-1
Grand Total 134
Air
4. Tripper 11 6X11 0 10. 4 12+0+0+0 0 16. Generator (600 KW) 1 0 0 22. Core cutter 8 0 18
Compressor
Grouting
5. Wheel Loader 3 6+8+6 0 11. Machine 1 2 0 17. Electric Compressor 1 0 0 23. Potable air compressor 1 12 0
(Low
Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Tuesday, June 4, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 34°C Min Temp. : 22°C Humidity: 63%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)
28 days Compressive
strength test of early strength
CSCEC-STP-EM-20240507-
3. mortar Rockbolt grouting at EN 445 Automatic flexural & compressive strength test machine. 3.
1
North main tunnel,K1+976.2-
973.8
S.N Detonator Delay No. Quantity Aviable Quantity Demanded Consumed Quantity Remaining Quantity
1 10424
NED-1 40 85 10339
2 2358
NED-3 40 31 2327
3 3829
NED-5 20 34 3795
4 10279
NED-7 40 70 10209
5 9596
NED-9 47 68 9528
6 13213
NED-11 40 71 13142
7 14040
NED-13 50 96 13944
8 0
NED-15 0 0 0
Emulsion-(Power
9 36911.8 750 737.6 36174.2
Gel)32mm
10 ED 1362 1358
8 4
11
12
Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Tuesday, June 4, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 34°C Min Temp. : 22°C Humidity: 63%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)
CSCEC-STP-CA-
1. Aggregates(8 mm) MT -7,358.21 -36.00 -7,394.21
20231004-1
CSCEC-STP-CA-
2. Aggregates(16mm) MT 30.05 30.05
20231004-2
CSCEC-STP-CA-
3. Aggregates(22.4mm) MT 108.57 108.57
20231005-1
CSCEC-STP-FA-
4. Sand MT -934.08 -50.98 -985.06
20231009-1
CSCEC-STP-C-20231008-
5. Cement MT -29.87 -21.840 -51.71
1
CSCEC-STP-R-20231014-
6. Rebar 6mm(500 D) Kg 381.74 -984.00 -602.26
1
CSCEC-STP-R-20231014-
7. Rebar 8mm Fe500D Kg 6,418.00 6,418.00
2
CSCEC-STP-R-20231013-
8. Rebar 12mm Fe500D Kg -2,073.58 -2,073.58
1
CSCEC-STP-R-20231013-
9. Rebar 20mm Fe500D Kg 5,051.19 5,051.19
3
CSCEC-STP-R-20231013-
10. Rebar 25mm Fe500D Kg -26,740.83 -418.27 -27,159.10
4
CSCEC-STP-SA-
2. I-Beam (100 by 180) Kg 42,860.69 42,860.69
20231014-1
Chemicals-PCA-1
15. Kg -5,571.83 4572/079/080 -5,571.83
Admixture
6. Rebar 6mm(500 D) kg
7. Rebar 20mm(500 D) kg
Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Tuesday, June 4, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 34°C Min Temp. : 22°C Humidity: 63%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)
S.N.
Description of
Ref. Map or Layout Codes in Lay Out Work Description Unit L B H Quantity Remarks
Item
Main Tunnel(south)
Blasting work South main tunnel at 4:19
kg 275.00
PM
K1+013.8 South main tunnel pull length 3.7m
i. DD-MT-19-A1 Sheet 1 of 2 Mucking work m3 280.00
Spraying of first layer of shotcrete
K1+010-K1+013.8 m3 18.00
C25/30
ii DD-SP-03-A2 South Slope protection work
Bypass
Blasting work at 8:32 AM kg 87.6
iii. DD-BP-04-A3 Sheet 1 of 1 L1K0+024.6 By-Pass 1
Mucking work m3 18.0
MR-1
Sheet no.
vii. DD-RA-10-A1 K0+816-800 Installing 25mm dia rockbolt at H7.5-5.5 nos. 16
8,9,10,11,12,13 of 51
C25/30 shotcrete m3 30
9. RFI Note:
11. Photos
Photo No. 1: MS-III-A support system installation work at North Main tunnel Photo No. 2: Face drilling work using explosives at South main tunnel
Photo No. 3:By-Pass-1 after using explosive Photo No. 4: North main tunnel after using explosives
Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: cscec_siddababa@163.com Website: www.cscec.com