Steady-state and dynamic converter

modeling in system analysis

Thomas Skånøy

Master of Science in Energy and Environment


Submission date: June 2007
Supervisor: Olav B Fosso, ELKRAFT

Norwegian University of Science and Technology


Department of Electrical Power Engineering
Problem Description

Mid-Norway has a significant power deficit. This deficit will increase in the years to come unless
new production capacity with high utilization time is installed. An increased utilization of the
transmission system increases the probability of collapse when the system is exposed to line
disconnections. Load modelling is then an important issue when determining the probability of
voltage collapse due to various system faults.

There are several large industrial loads in this area and modelling of such loads may be crucial for
the system performance. One of these loads is the Ormen Lange where large motors are supplied
by a converter station based on power electronics. Traditionally these loads are included as a PQ-
model. Such a model can be made conservative due power consumption, but it is not possible to
uncover the impact such systems may have on dynamic performance.

This work will address alternative load models to illustrate the necessity to go for more detailed
models in the dynamic analysis also for such loads. The work should try to use the existing models
within PSS/E to illustrate the performance by using such models compared to the traditional PQ-
loads. One possibility is to use an HVDC-link to emulate the converter station. It is important to
address assumptions, simplifications and data requirements in the dynamic modelling as well as
discussing the performance of the model. For the load flow and dynamic analysis the tool should
be PSS/E with Mid-Norway as basis. The Nordic power model given by Statnett should be used in
the simulations.

Assignment given: 15. January 2007


Supervisor: Olav B Fosso, ELKRAFT
Preface
The master thesis “Steady-state and dynamic converter modeling in system analysis” is
written at the Department of Electrical Power Engineering at the Norwegian University of
Science and Technology (NTNU).

I would like to thank Leif Warland at Sintef Energy Research for guidance in the use of
computer tool program Power System Simulator for Engineering (PSS/E). Further, I would
like to thank Kjetil Uhlen at Sintef Energy Research for technical inputs. Finally, I would like
to thank my subject teacher Professor Olav Bjarte Fosso for guidance throughout the semester.

Trondheim, June 12, 2007

Thomas Skånøy

i
ii
Abstract
This master thesis was executed at the Department of Electrical Power Engineering at the
Norwegian University of Science and Technology (NTNU). The thesis was initiated to
establish and evaluate an alternative model representation of the facility at Ormen Lange.
Traditionally, a PQ-model has been used to represent Ormen Lange. This thesis, however,
has implemented three two-terminal dc line models (converter models) to represent the
facility.

The first part of the thesis starts with an overall introduction to the basic principles of
configuration, operation and control of HVDC systems. The objective of this part is to
provide an overview of the HVDC technology which is treated in detail later in the thesis.

The software tool “Power System Simulator for Engineering” (PSS/E) was used for both
power flow and dynamic simulations performed in this thesis.

The second part of the thesis describes the power flow establishment, and constitutes the basis
for both power flow and dynamic simulations. The main focus in this part is the modeling of
the two-terminal dc line model which is implemented at Nyhamna. Data for the two-terminal
dc line model is presented on three consecutive data records. Since these data enables not only
power flow analysis but also establishes the initial steady-state for the dynamic analysis, a
detailed description is presented in this section. The latter data is based on technical
information provided by ABB and default values in PSS/E.

The third part of the thesis presents the power flow simulations. The objective of this part is
to gain knowledge about the performance of the two-terminal dc line model implemented at
Ormen Lange. This knowledge facilitates the understanding of the following dynamic
simulations. Two cases were studied to simulate the action of the converter control system
when exposed to a depression in rectifier bus voltage. In the first case the rectifier transformer
tap settings were adjustable. In the second case the rectifier tap settings were locked to its
initial value. The purpose of locking the tap setting was to represent a transient situation
where the tap changer action is too slow and hence not considered.

The result showed that with adjustable rectifier tap settings, the depression in rectifier bus
voltage is handled by reducing the rectifier transformer tap position and firing delay angle.
This increased the voltage on the valve side of the rectifier transformer and enabled the
rectifier to maintain dc current control. Consequently, the scheduled dc values were
unaffected by the depression in rectifier bus voltage. However, with the rectifier tap setting
locked, the transformer did not boost the voltage on the valve side of the rectifier transformer.
This caused the control logic to reduce the rectifier firing delay angle to its minimum, and the
inverter assumed control of the dc current. With the inverter in control of the current, the
scheduled dc current was reduced by a fraction equal to the current margin along with the
remainder dc values. Hence, the presence of an adequate rectifier transformer setting is
essential for the two-terminal dc line model to maintain scheduled dc values during voltage
depression.

iii
All simulations showed that a voltage depression at the rectifier bus leads to a reduction in
rectifier reactive power consumption. This is due to the action from the control logic which
reduced the rectifier firing delay angle to counteract the voltage depression. The greatest
reduction in rectifier reactive consumption was experienced when the rectifier firing delay
angle was reduced to its minimum value. Hence, in situations with depressed bus voltage, the
latter operation of the converter control logic causes the two-terminal dc line model to exhibit
less stress to the ac system than the PQ-model.

The fourth part of this thesis contains a detailed description of the dynamic modeling of the
two-terminal dc line model (CDC4T). Many of the chosen parameters are based on an
example in [15], and do not necessary represent realistic values.

The final part of this thesis presents the dynamic simulations. The objective of this part is to
analyze the control actions of the CDC4T model under normal regulation and during
temporary overriding the normal regulation. This was performed by introducing ac system
faults which depressed the rectifier bus voltage to a varying degree.

Further, this part analyzed the consequence of using the dynamic model CDC4T to represent
Ormen Lange instead of a PQ-model. The purpose was to determine whether the response
from the ac system differs when using the CDC4T model instead of a PQ-model. It is
important to emphasize that this part does not evaluate stability issues associated with the
implementation of CDC4T.

The results from the dynamic simulations showed that CDC4T exhibited an instantaneous
response to changes in rectifier ac voltage. This is because CDC4T is a pseudo steady-state
dynamic model which omits the L/R dynamic of the dc system and high frequency firing
angle controller dynamics.

Further, the results revealed an important characteristic of the CDC4T model. After fault
clearance, the rectifier bus exhibited small voltage fluctuations. The rectifiers compensated
these fluctuations by adjusting their firing delay angles correspondingly. Consequently, the
latter resulted in fluctuations in reactive power consumption. This means that the ac system
perceives the CDC4T model as a varying reactive load following fault clearance.

Comparing the ac system response when using the CDC4T model and when using the PQ-
model, the results showed that the main difference was CDC4T’s generation of reactive
power fluctuations. These fluctuations were experienced in the transmission line going into
Nyhamna and Viklandet, and were substantial compared to the initial loading of the
transmission lines. Two arguments were used to substantiate why the response from the
CDC4T model only differs from the PQ-model in terms of reactive power fluctuations:

I. The calculated value of the short circuit ratio at Nyhamna indicated a strong
interconnected ac/dc system.
II. The dynamic behavior of the pseudo-steady state model, CDC4T, is limited. Both the
L/R dynamic of the dc line, smoothing reactors and high frequency controller
dynamics are omitted.

iv
In further studies where converter modeling at Ormen Lange is considered, a more complex
dynamic dc model should be utilized to represent the converters. This model should include
L/R dynamic of the dc system and high-speed controller dynamics, and will thus influence the
ac system to a greater extent than CDC4T. Further, the model establishment should focus on
achieving a sufficiently realistic load representation of Ormen Lange. In this manner, the
converters’ influence on system stability can be evaluated.

v
vi
Table of content
1 INTRODUCTION ....................................................................................................................................... 1
1.1 BACKGROUND ...................................................................................................................................... 1
1.2 SCOPE OF THE THESIS ............................................................................................................................ 1
1.3 OUTLINE OF THE THESIS ........................................................................................................................ 2
2 THEORY ABOUT HVDC TRANSMISSION .......................................................................................... 5
2.1 INTRODUCTION TO HVDC .................................................................................................................... 5
2.2 HVDC SYSTEM CONFIGURATION .......................................................................................................... 6
2.2.1 Monopolar links .............................................................................................................................. 6
2.2.2 Bipolar links .................................................................................................................................... 7
2.2.3 Homopolar links.............................................................................................................................. 7
2.2.4 Back-to-back links........................................................................................................................... 8
2.2.5 Multi terminal links ......................................................................................................................... 8
2.3 COMPONENTS IN A HVDC TRANSMISSION SYSTEM .............................................................................. 9
2.3.1 Converter unit ................................................................................................................................. 9
2.3.2 Converter transformer................................................................................................................... 10
2.3.3 Filter.............................................................................................................................................. 10
2.3.4 Smoothing reactor......................................................................................................................... 10
2.3.5 Reactive power sources................................................................................................................. 11
2.4 PRINCIPLES OF HVDC TRANSMISSION ................................................................................................ 11
2.4.1 General.......................................................................................................................................... 11
2.4.2 Converter operation ...................................................................................................................... 12
2.5 PRINCIPLES OF HVDC CONTROL ........................................................................................................ 21
2.5.1 General.......................................................................................................................................... 21
2.5.2 Normal operation .......................................................................................................................... 22
2.5.3 Operating during disturbances ..................................................................................................... 23
2.5.4 Voltage dependent current limit (VDCL) ...................................................................................... 23
2.6 INFLUENCE OF AC SYSTEM STRENGTH ON AC/DC SYSTEM INTERACTION ............................................. 24
2.6.1 ac/dc system strength .................................................................................................................... 24
2.6.2 Problems associated with weak ac/dc connections ....................................................................... 26
3 POWER FLOW MODELING IN PSS/E ................................................................................................ 29
3.1 MODIFICATION OF DATA SET .............................................................................................................. 29
3.1.1 Changes made in the Statnett model ............................................................................................. 29
3.2 DESCRIPTION OF ORMEN LANGE ........................................................................................................ 31
3.3 CONVERTER MODELING ...................................................................................................................... 32
3.3.1 Parameter evaluation.................................................................................................................... 32
3.3.2 Converter configuration................................................................................................................ 37
3.3.3 Converter control .......................................................................................................................... 39
3.4 SYNCHRONOUS GENERATOR AND TWO WINDING TRANSFORMER ........................................................ 41
4 POWER FLOW SIMULATIONS............................................................................................................ 43
4.1 INTRODUCTION ................................................................................................................................... 43
4.2 INITIAL CONDITIONS AND ASSUMPTIONS ............................................................................................. 43
4.2.1 Power flow assumptions................................................................................................................ 43
4.3 APPLICATION OF THE DISTURBANCE ................................................................................................... 45
4.4 CALCULATED SOLUTIONS ................................................................................................................... 46
4.5 DISCUSSION OF THE RESULTS .............................................................................................................. 46
4.5.1 Case A1 .......................................................................................................................................... 46
4.5.2 Case B1 .......................................................................................................................................... 48
4.5.3 Case A2 and B2 .............................................................................................................................. 49
4.6 REACTIVE POWER CONSUMPTION OF THE CONVERTER ........................................................................ 50
4.6.1 Discussion of the results................................................................................................................ 51
4.7 INFLUENCE FROM THE SWING BUS ON THE INVERTER .......................................................................... 52
4.8 CONVERTER VERSUS PQ REPRESENTATION OF ORMEN LANGE ........................................................... 53
4.8.1 Principal comparison.................................................................................................................... 54
4.9 SUMMARY .......................................................................................................................................... 54

vii
5 DYNAMIC MODELING IN PSS/E......................................................................................................... 57
5.1 CONVERTER MODELING ...................................................................................................................... 57
5.1.1 Parameter evaluation.................................................................................................................... 57
5.2 CONVERTER CONFIGURATION ............................................................................................................. 60
5.2.1 General considerations ................................................................................................................. 60
5.3 CONVERTER CONTROL ........................................................................................................................ 63
5.3.1 Characteristics of normal operation ............................................................................................. 64
5.3.2 Characteristics of operation during transients ............................................................................. 66
5.3.3 Special considerations................................................................................................................... 69
5.4 GENERATOR MODELING ...................................................................................................................... 70
5.4.1 Model and parameters implemented in PSS/E .............................................................................. 70
5.4.2 Basis for chosen model.................................................................................................................. 70
6 DYNAMIC SIMULATIONS .................................................................................................................... 73
6.1 INTRODUCTION ................................................................................................................................... 73
6.2 INITIAL CONDITIONS AND ASSUMPTIONS ............................................................................................. 74
6.2.1 Power flow assumptions................................................................................................................ 74
6.2.2 Dynamic assumptions.................................................................................................................... 74
6.2.3 Initial values.................................................................................................................................. 75
6.3 APPLICATION OF THE DISTURBANCE ................................................................................................... 76
6.4 RESULTS AND DISCUSSION .................................................................................................................. 76
6.4.1 Case D........................................................................................................................................... 77
6.4.2 Case E ........................................................................................................................................... 81
6.4.3 Case D versus Case E ................................................................................................................... 87
6.5 GENERAL CONSIDERATIONS ................................................................................................................ 90
7 MODEL EVALUATION .......................................................................................................................... 93
7.1 INTRODUCTION ................................................................................................................................... 93
7.2 INITIAL CONDITIONS AND ASSUMPTIONS ............................................................................................. 94
7.2.1 Power flow assumptions................................................................................................................ 94
7.2.2 Dynamic assumptions.................................................................................................................... 95
7.3 APPLICATION OF THE DISTURBANCES ................................................................................................. 95
7.4 SIMULATION RESULTS......................................................................................................................... 96
7.4.1 Results from Case E ...................................................................................................................... 96
7.4.2 Results from Case F .................................................................................................................... 108
7.5 GENERAL CONSIDERATIONS ............................................................................................................. 118
8 CONCLUSION ........................................................................................................................................ 121
8.1 BACKGROUND .................................................................................................................................. 121
8.2 POWER FLOW .................................................................................................................................... 121
8.3 DYNAMIC.......................................................................................................................................... 122
8.4 FURTHER WORK ................................................................................................................................ 123
REFERENCES.................................................................................................................................................. 125
APPENDIX INDEX ...............................................................................................................................................I

viii
1 Introduction

This chapter gives a brief description of the background and the scope of this master thesis.
Finally, an outline of the thesis is presented.

1.1 Background
Mid-Norway have several large industrial loads and modeling of these loads can be crucial for
the system performance. One of these loads is Ormen Lange, where large motors are supplied
by converter stations based on power electronics. Traditionally, these loads are represented as
PQ-models in system analysis. The latter representation can be made conservative in terms of
power consumption, however, it omits the possibility to uncover the impact such systems may
have on dynamic performance.

1.2 Scope of the thesis


This master thesis is focused on steady-state and dynamic converter modeling in system
analysis. With the facility at Ormen Lange as basis, this thesis implements three two-terminal
dc line models to represent the converter stations at Ormen Lange. The simulation tool
“Power System Simulator for Engineering” (PSS/E) is used for both power flow and dynamic
simulations. The system model utilized is the Nordic power model provided by Statnett.

The objective of this thesis is to describe converter modeling in PSS/E and illustrate the
performance of the implemented converter model through power flow and dynamic
simulations. Also, the simulations will illuminate the consequence of using a dynamic
converter model to represent Ormen Lange instead of the traditional PQ-model. The purpose
is to determine whether the response from the ac system differs when using the latter two
models.

It is important to acknowledge that the actual converter system at Ormen Lange is a complex
and complicated configuration. This impedes establishment of a realistic converter
representation in simulation program like PSS/E. However, the latter is nor the purpose of this
thesis. The evaluations made in this thesis are of a principal character and thus only valid for
the assumptions made in the thesis. Since the simulations are of a principal character, the
thesis does not evaluate stability problems associated with the implementation of the
converter model.

General information
This thesis is a continuance of the preliminary study [9]. Hence, topics described in [9] will
thus not be repeated in this thesis.

The converter modeling in PSS/E is an essential part of this thesis. Consequently, this is
described in detail. Hopefully, this will facilitate further work associated with converter
modeling in PSS/E.

In the initial phase of this thesis, a great deal of time was used to obtain relevant data to
establish a realistic converter model of Ormen Lange. This turned out to be difficult. Hence,
this thesis uses both default values in PSS/E and values obtained from the literature when

1
establishing the converter model. Consequently, the principal simulation results are of greatest
interest in this thesis.

The discussion of the results is given consecutive as the results are presented to increase the
readability.

1.3 Outline of the thesis


The thesis is organized as follows:

Chapter 2 This chapter gives an overall introduction to the basic principles of


configuration, operation and control of HVDC systems. The chapter provides an overview of
the HVDC technology which is treated in detail in the subsequent chapters.

Chapter 3 This chapter describes the establishment of the power flow model used in
PSS/E and constitutes the basis for both power flow and dynamic analysis in the following
chapters. The main focus of this chapter is the modeling of the two-terminal dc line model.
This model does not represent Ormen Lange in realistic manner. The latter is nor the objective
of this chapter.

Chapter 4 This chapter contains the power flow simulations performed in this thesis. The
objective of this chapter is to evaluate the performance of the steady-state two-terminal dc
line model. The simulations will illuminate the action of the control logic system, reactive
power consumption and characteristics of the implemented model. The evaluations made in
this chapter will facilitate the understanding of the dynamic simulations performed in the
subsequent chapters.

Chapter 5 This chapter gives a detailed description of the modeling and operation of the
dynamic two-terminal dc line model (CDC4T) implemented in PSS/E. Several of the
parameter values used in the modeling are based on an example in [15], and do not necessary
represent realistic values.

Chapter 6 This chapter contains dynamic analysis of the control action for the CDC4T
model under normal regulation and during temporary overriding of the normal regulation. The
simulations are performed by introducing ac system faults which depresses the rectifier bus to
a varying degree.

Chapter 7 This chapter analyzes the consequence of using the dynamic model, CDC4T,
to represent Ormen Lange instead of a PQ-model. The objective is to determine whether the
response from the ac system differs when using the latter models. This chapter does not
address stability issues associated with the implementation of CDC4T.

Chapter 8 This chapter contains the main conclusions which can be drawn from the
results obtained in this thesis.

Appendix A This appendix contains results obtained from the power flow simulations in
Chapter 4.

Appendix B This appendix contains some of the results obtained from the dynamic
simulations in Chapter 6.

2
Appendix C This appendix contains a simplified calculation of the short circuit capacity
(SCC) and short circuit ratio (SCR) at Nyhamna.

Appendix D This appendix contains PSS/E files and verification data. The appendix is
attached electronically because it contains confidential information.

3
4
2 Theory about HVDC transmission
This chapter provides an overall introduction to the basic principles of configuration,
operation and control of HVDC systems. The objective is to provide an overview of the HVDC
technology which is treated in detail in the subsequent chapters.

For a more in-depth description of the topics addressed in this chapter, the reader may refer
to references [1] and [2].

2.1 Introduction to HVDC


Remote generation and system interconnections lead to a search for efficient power
transmission at increasing power levels. The problems of alternating current (ac) transmission
particularly in long distance transmission, has lead to the development of high-voltage direct-
current (HVDC) transmission. HVDC transmission has advantages over ac transmission in
special situations and has become an important contributor to successful power system
operation [1].

The first commercial application of HVDC transmission was between the Swedish mainland
and the island of Gotland in 1954. The system used mercury arc valves and provided 20 MW
at 100 kV. The mercury arc valves were utilized in HVDC systems until thyristor valves
became commercially available in 1970. The introduction of thyristor valves made HVDC
transmission even more attractive [1, 3].

In Norway the first HVDC link was build in 1976/77 between Kristiansund and Tjele in
Denmark. The HVDC system consists of overhead lines and a submarine transmission cable.
In 1977, this submarine cable was the longest cable ever set in operation and the facility was
based on thyristor valve technology [4].

Today, the application of HVDC systems is well established. There are 16 dc linkes operating
or under construction in the United States and 21 in North America. There are additionally
numerous links throughout Scandinavia as well as Japan, Australia, South Africa and others;
well over 100 world wide [5].

The main objective of a HVDC transmission is to transmit electrical power from one
electrical point to another. The following are the types of application for which HVDC
transmission has been used [3, 4]:

I. Bulk power transmission. Transmission of large amount of power over long distances
by overhead lines. HVDC transmission is a competitive alternative to ac transmission
for distances in excess of about 600 km.
II. Asynchronous networks. Asynchronous link between two ac systems where ac ties
would not be feasible because of system stability problems or a difference in nominal
frequency of the two systems.

5
III. Underground/submarine power feeders. ac transmission is impractical for underwater
cables longer than 30 km. This is due to the high capacitance of the cable and the need
for intermediate compensation stations.

HVDC systems also have the ability to rapidly control the transmitted power. Hence, they
have a significant impact on the stability of the associated ac power systems.

An understanding of the characteristics of the HVDC system is essential for the study of
system stability, and, especially for the understanding of the performance of the overall ac/dc
system.

2.2 HVDC system configuration


HVDC links may broadly be classified into the following five groups:

I. Monopolar links
II. Bipolar links
III. Homopolar links
IV. Back-to-back links
V. Multi terminal links

This section gives a brief description of the latter groups and is mainly based on [3, 4].

2.2.1 Monopolar links


The monopolar HVDC link has one conductor, usually of negative polarity, and the return
path is provided by ground or water. Sometimes metallic return is also used. Cost
consideration often lead to the use of such systems, especially for cable transmission. This
type of configuration may also be the first stage in the development of a bipolar system. A
monopolar HVDC transmission scheme is illustrated in Figure 1.

Figure 1 Monopolar HVDC transmission [4].

The metallic return path mentioned above, can be used in situations where the earth resistivity
is too high or possible interference with underground/underwater metallic structures is
objectionable. The conductor forming the return path is at low voltage.

6
2.2.2 Bipolar links
The bipolar HVDC link has two conductors, one positive and one negative. Each terminal has
two converters of equal rated voltage, connected in series on the dc side. The junctions (the
neutral point) between the converters are grounded. Normally, the currents in the two poles
are equal, and there is no ground current. The two poles can operate independently. If one
pole is isolated due to a fault on its conductor, the other pole can operate with ground and thus
carry half the rated load or more by using the overload capabilities of the converters and line.
A bipolar HVDC transmission scheme is illustrated in Figure 2.

Figure 2 Bipolar HVDC transmission [4].

2.2.3 Homopolar links


The homopolar link has two or more conductors which all have the same polarity. However,
negative polarity is often preferred because it causes less radio interference due to corona. The
return path for this system is through ground. If there is a fault on one of the dc conductors,
the entire converter is available for feeding remaining conductor(s) which, having some
overload capability, can carry more than the rated power. A homopolar HVDC scheme is
illustrated in Figure 3.

Figure 3 Homopolar HVDC transmission [4].

A homopolar HVDC link has the same advantages as a bipolar HVDC link. However, the
difference between these two links is that homopolar link (with two poles in operation) has
twice the ground current that it has with only one pole in operation.

7
2.2.4 Back-to-back links
Back-to-back HVDC links are used to connect two asynchronous operated ac power systems
together. This configuration allows bidirectional power transfer between two ac systems. A
back-to-back HVDC transmission scheme is illustrated in Figure 4.

Figure 4 Back-to-back HVDC scheme [4].

A back-to-back HVDC system may be designed for monopolar or bipolar operation with
different number of valve groups per pole. The number of valve groups depends on the
purpose of the interconnection and the desired reliability. Note; back-to-back HVDC systems
are operated without dc lines or dc power cables. Figure 4 illustrates a bipolar back-to-back
HVDC scheme.

2.2.5 Multi terminal links


A multi terminal HVDC system is formed when the dc system is to be connected to more than
two nodes on the ac network. The system consists of more than two converter stations, where
some of the converters are operated as rectifiers and some are operated as inverters. A multi
terminal HVDC transmission scheme is illustrated in Figure 5.

Figure 5 Multi terminal HVDC transmission system [4].

Figure 5 illustrates a series connected scheme. The latter scheme represents one among
several possible configurations, e.g. meshed connection and parallel connection.

8
2.3 Components in a HVDC transmission system
This section describes the main components associated with a HVDC system. A schematic
figure of the components addressed in this section is illustrated in Figure 6. This section is
mainly based on [1, 4].

Figure 6 Schematic figure illustrating components in a HVDC system [3].

2.3.1 Converter unit


The converter units perform the ac/dc and dc/ac conversion, and consist of valve bridges and
transformers with tap changers. Each valve is used to switch in a segment of an ac voltage
waveform. The valve bridges consist of high-voltage valves connected in a 6-pulse or a 12-
pulse arrangement. The valve firing signals are generated in the converter control at ground
potential and are transmitted to each thyristor in the valve. Figure 7 shows a schematic
illustration of a 12-pulse converter unit.

Figure 7 A twelve pulse converter unit [1].

The converter is fed by converter transformers connected in star/star and star/delta


arrangements.

9
2.3.2 Converter transformer
The converter transformer can have different configurations – (i) three phase, two winding, (ii)
single phase, three winding, (iii) single phase, two winding. If no transformer reserve is
considered, the most economical alternative will be with three phase units.

Today, it is common to build a 12-pulse converter station per pole, i.e. each six-pulse bridge
unit is supplied from separate transformers. To reduce harmonic interactions, one of the
transformers is connected in star/star and the other in star/delta. The transformers in both the
receiving and sending end are equipped with tap-changer control. The objective of this is to
create an optimal voltage so that the converter can operate with an optimal firing angle. The
control system of the converter transformers are slowly acting devices (T > 2-3 seconds) and
do not need to be represented for transient studies, but for power flow studies only.

Note, the leakage reactance of the transformers is chosen to limit the short circuit currents
through any converter valve.

2.3.3 Filter
Converters generate harmonic voltages and currents on both ac and dc sides. These harmonics
may cause overheating of capacitors and nearby generators. Also, problems with interference
with telecommunication systems are caused by harmonics. Filters are therefore used on both
ac and dc side.

Filters also represent a reactive source that covers the reactive consumption of the HVDC link
to a varying degree. Hence, the filters serve two purposes in the HVDC system:

I. Reduces harmonic currents and voltages in the ac power system.


II. Provides reactive power for the HVDC system.

There exist several types of filter used in HVDC systems. However, the latter will not be
elaborated in this thesis. For more information on filters, see [1].

2.3.4 Smoothing reactor


The smoothing reactor serves an important part in the HVDC system. These are large reactors
having inductances as high as 1.0 H, and are connected in series with each pole of each
converter station [3].

The smoothing reactors serve the following purposes [3]:

I. Decrease harmonic voltages and currents in the dc line.


II. Prevent current from being discontinuous at light load.
III. Prevent commutation failure in inverters.
IV. Limit the crest current in the rectifier during short circuit on the dc line.

10
Even though increased reactance improves dc harmonic content, it also slows down the
control response and reduces the resonance frequency. Hence, stabilization of current
becomes more difficult.

2.3.5 Reactive power sources


Converter stations require reactive power supply. Under steady-state conditions, the reactive
power consumed is about 50% of active power transfer. Under transient conditions, the
reactive consumption may be much higher. Hence, reactive power sources are provided near
the converters. For strong ac systems, these are usually in the form of shunt capacitors. In
addition, synchronous condensers and static var systems (SVC) are used depending on
requirements on the speed of the control system.

2.4 Principles of HVDC transmission


The static conversion of power from ac to dc and from dc to ac constitutes a central part of the
HVDC transmission. To facilitate the understanding of the latter, it is essential to begin with a
description of the converter principles and of the steady-state relationship of static power
conversion.

The objective of this section is to give a basic understanding of the converter operation, the
commutation phenomena and the rectification and inversion operation. Also, the reactive
power demand and harmonic problems associated with converter operation are addressed in
this section. This section is mainly based on [2].

2.4.1 General
The conversion from ac to dc and vice versa is done in HVDC converter stations by using
three phase bridge converters. The configuration of the bridge is illustrated in Figure 8. This
circuit is also known as the Graetz bridge. Although there are several alternative
configurations possible, the Graetz bridge has been universally used for HVDC converters as
it provides better utilization of the converter transformer and a lower voltage across the valve
when conducting [3].

Figure 8 Graetz bridge [1].

11
The pulse number of a converter is defined as the number of pulsations, i.e. cycles of ripple,
of direct voltage per cycle of alternating voltage. The valve can be treated as a controllable
switch which can be turned on at any instant, provided the voltage across is positive. A diode
is an uncontrolled switch which will turn on immediately after the voltage has become
positive whereas the thyristor switching can be delayed by an angle α (alpha). The converters
voltage sources are actually obtained from the transformer secondary windings [1].
The output voltage Vd of the converter consists of a dc component and a ripple whose
frequency is determined by the pulse number [1].

2.4.2 Converter operation


To facilitate the understanding of converter bridge operation, this section will first consider
the situation with negligible source impedance and no ignition delay. Thereafter the section
will extend the analysis to include the effect of delaying the valve ignition and evaluate the
effect of source impedance.

With no ignition delay


To understand the operation of the three-phase bridge rectifier, it is appropriate to first
consider the idealized case where the converter bridge is connected to an infinitely strong
power system. The latter corresponds to a situation with zero source impedance. Also, the
bridge reactance is assumed so large that it is justified that the dc current is constant. Under
this condition, the transfer of current (also noted commutation) between valves on the same
side of the bridge takes place instantaneously. The switching sequence and the rectified
voltage waveform are illustrated in Figure 9. This case corresponds to an uncontrolled bridge
rectifier, i.e. on diode operation.

From Figure 9 it is clear that after instant A, valves 1 and 6 will conduct and the current flows
in phase R and phase Y. This operating state continues up to point B, after which valve 2
becomes forward-biased and the dc current commutates naturally from valve 6 to valve 2.
Similar argument applies at point C. A new valve becomes forward-biased every 60°, and the
dc current will commutate to this valve.

12
Figure 9 Bridge conducting sequence and dc voltage waveforms [2].

Figure 9 (h) shows the output voltage, i.e. the voltage of the positive pole with respect to the
negative pole. It can be seen that the output voltage has ripple, or harmonic frequency, of six
times the main frequency. Each valve carries the full value of direct current for one third of
the cycle, and there are always two valves conducting in series.

With ignition delay


The ignition of the valves can be delayed by the grid or gate control. The “delay angle” is
denoted α and corresponds to time delay of α/ω seconds. This thesis also uses the term firing
delay angle in notation of α. Figure 10 illustrates the effect of ignition delay on voltage
waveforms.

13
Figure 10 Effect of ignition delay on voltage waveforms [2].
(a) Common anode and common cathode voltages
(b) dc voltage

It is noticeable from Figure 10 that the voltage area, and therefore the mean direct voltage, is
reduced in proportion with the magnitude of the delay. Hence, the effect of delayed ignition is
a reduction in the direct voltage. For delay angles above 60° some negative periods begin to
appear. If a pure resistance were connected to the bridge output, the bridge unidirectional
current conduction property would prevent reverse current flow during these negative periods,
and the operation would then be intermittent. However, the large smoothing reactor maintains
positive current flow during the negative periods, and the energy is transferred from the
reactor magnetic field to the ac system.

Figure 11 illustrates the voltage waveforms with 90° ignition delay. The figure shows that the
negative cycle of the voltage waveform equals the positive cycle. Hence, the mean direct
voltage becomes zero with 90° delay.

14
Figure 11 Voltage waveforms with 90 degrees ignition delay [2].
(a) Common anode and common cathode voltages
(b) dc voltage

If the delay angle is greater than 90°, the converter acts as an inverter instead of a rectifier.
This means that the mean value of the direct current becomes negative and thus the active
power is transferred from the dc side to the ac side [6].

The real commutation process


In a real situation the zero impedance supply required to produce the voltage waveforms in
the previous sections does not exist. Even though the ac system impedance might be
negligible, there will be a considerable transformer leakage reactance between the converter
and the ac system.

Before analyzing the real commutation process it is important clearly define what is meant by
commutation voltage and commutation reactance. [2] gives the following two definitions:

I. The commutation voltage is the voltage appearing on the dc line during the periods
when no commutation is taking place.
II. The commutation reactance is the reactance between the commutation voltage and the
converter valves.

To facilitate the study of the commutation process, see Figure 12. This figure considers the
commutation process between valve 1 and 3 of a converter bridge, connected to a system with
a source voltage vc, a commutation reactance per phase Xc and negligible resistance.

15
Figure 12 The commutation process [2].
(a) Equivalent circuit of the commutation from valve 1 to valve 3
(b) Voltage waveforms showing early rectification and late inversion commutations
(c) The commutation currents

With reference to Figure 12, the commutation from valve 1 to valve 3 can start any time after
the upper voltage crossing between vCR and vCY. Due to vCY > vCR, a commutating current ic
(=i3) builds up at the expense of i1. Hence, i1 + i3 = Id.

From the circuit in Figure 12 and assuming XCR = XCY = XC, the following expression can be
derived:

X c dic
vCY − vCR = 2 = 2Vc sin ωt (2.1)
ω dt
where:

XCR, XCY and XC are the commutation reactances.


vCY and vCR are phase voltages in phase Y and phase R respectively.
Vc is the phase-to-phase rms voltage.

The instantaneous expression for the commutation current, given below, can be derived from
the above relation. However, the complete derivation is omitted in this thesis but can be found
in [2].
Vc
ic = ⎡⎣cos α − cos (ωt ) ⎤⎦ (2.2)
2Xc

Substituting the final condition, i.e. ic=Id at ωt = α + u yields

16
Vc
Id = [cos α − cos (α + u )] (2.3)
2Xc

Rectifier operation
To illustrate the operation of a rectifier, see Figure 13. This figure illustrates a typical voltage
and current waveform of a bridge operating as a rectifier with the commutation effect
included. P indicates a firing instant (e.g. P1 is the firing instant of valve 1), S indicates the
end of a firing instant (e.g. at S5 valve 5 stops conducting) and C is a voltage crossing.

The average output voltage can be derived with reference to the waveforms of Figure 13, and
is given as:

1
Vd = Vc 0 ⎡⎣ cos α + cos (α + u ) ⎤⎦ (2.4)
2

where Vc0 is the maximum average dc voltage and u is the commutation angle. For the three-
( )
phase bridge configuration Vc 0 = 3 2 / π Vc , and Vc is the phase to phase rms commutating
voltage referred to the secondary (or valve side) of the converter transformer.

Since the value of the commutation angle is not normally available, a more useful expression
for the dc voltage, as a function of the dc current, can be derived from Equations (2.3) and
(2.4):

3X c
Vd = Vc 0 cos α − Id (2.5)
π

17
Figure 13 Typical 6-pulse rectifier operation [2].
(a) Positive and negative dc voltages with respect to the transformer neutral
(b) dc bridge voltage Vd, and voltages across valve 1
(c), (d) Valve currents i1 to i6
(e) ac line current of phase R

The rms magnitude of the rectangular current waveform (neglecting the commutation overlap)
is often used to define the converter transformer MVA, i.e.

π /3
⎧ ⎫
I rms = ⎨(1/ π ) ∫ I d 2 d (ωt ) ⎬ = 2 I d 3 (2.6)
⎩ π /3 ⎭

However, since harmonic filters are normally provided at the converter terminals, the current
flowing in the ac system contains only fundamental component frequency and its rms
magnitude is:

I1 = I d 6 / π (2.7)
Note; Equation (2.7) is obtained from Fourier analysis. This derivation is omitted in this thesis,
but can be found in [2].

18
Inverter operation
The analysis of the inverter operation is not different from that of rectification and will thus
not be repeated in this section. However, the inverter equations are often expressed in terms of
the extinction angel γ (= π -α-u). Omitting the negative sign of the inverter dc voltage, the
following expression applies:

3X c
Vd = Vc 0 cos γ − Id (2.8)
π

The expression for the direct current is:

Vc
Id = [cos γ − cos(π − α )] (2.9)
2Xc

Power factor and reactive power


Figure 14 illustrates a vector diagram of current and power for both the rectification and
inversion operation. Due to the firing delay (earlier referred as ignition delay) and
commutation angles, the converter current in each phase lags its voltage. This means that both
the rectifier mode and the inverter mode consume reactive power. The latter can be seen from
Figure 14.

Figure 14 Current and power vector diagram [2].


R for rectification, I for inversion.

From a power system perspective, a minimization of reactive power consumption is desirable.


This is due to the fact that reactive power influences the losses and the need for compensation.
It can be shown that the extinction angle (γ) for the inverter mode, and the firing angle (α) for
the rectifier mode should be as small as possible to obtain a optimal power factor. This is
done below with the assumptions of no harmonic currents injected in the ac network. Also, its
assumed no losses in the converter [6].

19
The active power P is the same as the dc power, i.e:

P = 3Vc I cos φ = Vd I d (2.10)

The power factor is:

Vd I d
cos φ = (2.11)
3Vc I

The fundamental component in the ac current, I, correspond to Equation (2.7). Substituting Vd


and Id from Equation (2.4) and (2.7) in Equation (2.11) the following approximate expression
is obtained:

1
cos φ = ⎡ cos α + cos (α + u ) ⎤⎦ (2.12)
2⎣

The reactive power is often expressed in terms of active power, i.e.:

Q = P ⋅ tan φ (2.13)
where tan φ are defined by the following expression:

sin(2α + 2u ) − sin 2α − 2u
tan φ = (2.14)
cos 2α − cos(2α + 2u )

Equation (2.10), (2.12) and (2.13) show that the active and reactive powers of a controlled
rectifier vary with the sine and cosine of the control angle. Thus, when operating on constant
current, the reactive power demand at low powers ( φ = 90° ) can be very high. However, the
latter situation is prevented in HVDC converters by the addition transformer tap changer,
which tries to reduce the steady-state firing angle (or the commutation margin angle) to the
minimum specified.

Note, in a normal power load condition the reactive power needed is about 50-60% of the
transmitted active dc power at full load [4].

Converter harmonics
This section will only give a brief introduction to the concepts related to converter harmonics.
A detailed description of converter harmonics can be found in [1, 2]. This section is mainly
based on [1, 2].

The term harmonics is used to define the sinusoidal components of a repetitive waveform.
These waveforms consist exclusively of frequencies which are exact multiples of the
fundamental frequency. The full set of harmonics forms a Fourier series which completely
represents the original waveform.

20
A HVDC converter introduces both ac and dc harmonics. These harmonics are injected into
the ac system and dc line, respectively. There are several problems associated with the
injection of harmonics and these are listed below:

I. Overvoltages due to resonance.


II. Telephone interference.
III. Extra power losses and consequent heating in machines and capacitors connected in the
system.
IV. Instability of converter controls.

It is important to acknowledge that the orders of the “characteristic” harmonics are related to
the pulse number of the converter configuration. A converter of pulse number p ideally
generates only characteristic voltage harmonics of order pk on the dc side, and current
harmonics of order pk ± 1 on the ac side (k is any integer). Hence, the greater the pulse
number is, the greater is the lowest order of harmonics that is produced by the converter.

2.5 Principles of HVDC control


The system control in a HVDC link tends to be quite complex with a hierarchy of controllers.
This section will thus present basic principles and functions of the HVDC control which
constitutes a basis for the analysis performed in the following chapters. The control system is
described in detail in the subsequent chapters, hence, an overall description will be presented
in this section. This section is mainly based on [2, 4].

2.5.1 General
The transmitted dc current in a HVDC transmission is proportional to the difference in dc
voltage in the sending and receiving end, respectively. The latter situation is illustrated in
Figure 15. The figure shows a schematic one-line diagram which illustrates the power flow in
a dc transmission. In this situation the dc current flows from the rectifier to the inverter. Thus,
also the active power flows from the rectifier to the inverter. However, it is possible to reverse
the active power flow by reversing the dc voltage.

Figure 15 Schematic figure illustrating power flow in a dc transmission [4].

21
In a HVDC system, one of the converter stations is controlling the dc voltage. Normally, this
is done by the inverter station. The other terminal station, usually the rectifier, adjusts the
direct voltage on its terminals so that the dc current is controlled to the desired transmitted
power. The objective of the transformer tap changers is to handle slow variations on the ac
side, and therefore, maintain scheduled dc voltage on both sides.

Each converter has a closed loop current control system. The input controlling parameter to
this system is the desired dc current. The latter is also called the current order. Each converter
tries to adjust the dc voltage until there is no difference between the current order and the
measured dc line current, or the maximum voltage is reached when the firing is at minimum
delay angle. If the measured dc current is greater than the current order, the dc voltage is
decreased.

The HVDC link provides the sending station with a slightly larger current order than the
power receiving station. The difference between the two current orders is called the current
margin.

Further, the converter which can generate the highest voltage will also control the current.
The rectifier control angle (α = αmin) is normally smaller than the inverter control angle (γ =
γmin). Hence, the rectifier will control the current. The inverter will thus control the voltage
with constant control angle (γ = γmin).

2.5.2 Normal operation


To illustrate the control condition in normal operation, see Figure 16. This figure illustrates
the Vd/Id characteristic in normal operation. The operating current is set by the constant
current control at the rectifier end. The inverter end current controller then detects an
operation which is greater than its setting and tries to reduce it by raising its own voltage,
until it hits the ceiling determined by the minimum extinction angle controlled at point A.

Figure 16 Steady-state characteristic and operation point under rectifier current control [2].

This constitutes the normal steady-state operation point, which presumes a higher natural
voltage characteristic at the rectifier end. For the rectifier, the firing angle is measured and
maintained approximately constant by making adjustments to rectifier transformer tap
changers.

22
2.5.3 Operating during disturbances
Consider a situation where the ac voltage at the rectifier end has been reduced to an extent
that the dc voltage ceiling (the natural voltage) of the rectifier becomes lower than that of the
inverter. In absence of a current controller at the inverter, the voltage across the line is
reversed and the current reduces to zero (current through the valve cannot reserve). However,
an inverter current controller will prevent a current reduction below its current order by
reducing its firing angel (inverter margin angle), thus changing from extinction angle to
constant current control. A visualization of the situation is given in Figure 17.

Figure 17 Steady-state characteristic and operation point under inverter current control [2].

The HVDC link is now under inverter current control. From Figure 17 it can be seen that the
new operation point is A’. This operation point occurs at a current reduced by the current
margin. The firing angle of the rectifier will now be at its extreme minimum since this
terminal is trying to increase the dc voltage and thereby increase the dc current. However, at
the inverter the firing angle has been decreased in order to control the dc current.

2.5.4 Voltage dependent current limit (VDCL)


In situations where the ac voltage is low, it may not be desirable or possible to maintain rated
direct current or power. Two reasons for this are [3]:

I. When the voltage at a converter drops, the reactive power demand of the converter
increases, and this may have an adverse effect on the ac system. The reduced ac system
voltage also significantly decreases the reactive power supplied by the filters and
capacitors, which often supply much of the reactive power consumed by the converters.
II. With reduced voltages, there is a risk of commutation failure and voltage instability.

The latter two problems associated with converter operation under low voltage conditions
may be prevented by using a voltage dependent current limit (VDCL). The VDCL reduces the
maximum allowable dc current when the voltage drops below a predefined value. The VDCL
characteristic is illustrated in Figure 18 [3].

23
Figure 18 VDCL with current limit as a function of dc voltage [3].

In Figure 18 the VDCL characteristic is a function of the dc voltage. The VDCL characteristic
can also be given as a function of the ac commutation voltage. However, the latter situation is
omitted in this thesis because the VDCL characteristic used in the following chapters has a dc
voltage characteristic.

For VDCL operation, the measured dc voltage is passed through a first-order time lag element.
Normally, the time lag is different for increasing and decreasing voltage conditions. If the
voltage is going down, fast VDCL action is required, and consequently, the time lag is small.
However, if the same short time lag is used during voltage recovery, it may lead to
oscillations and possibly instability. Therefore, a larger time lag is used when the dc voltage is
recovering [3].

2.6 Influence of ac system strength on ac/dc system interaction


The performance of a HVDC system is significantly impacted by the relative strength of the
ac system to which it is connected. The “weaker the ac system”, the greater will the ac/dc
interactions be. This section addresses factors that require consideration when implementing a
HVDC link terminated in a “weak” ac system. However, before the latter considerations are
made, it is necessary to formally define what defines the strength of a system [7]. This section
is mainly based on [4, 7].

2.6.1 ac/dc system strength


The ac system can be considered as “weak” from the following two aspects:

I. The ac system impedance is high relative to the dc power at the point of connection.
II. The ac system mechanical inertia is inadequate relative to the dc power infeed.

The term ”weak ac power system” means that the short circuit capacity in the ac system is low
with respect to the nominal capacity of the HVDC transmission system. This situation can
arise when either of (I) or (II), listed above, is valid. Both the short circuit ratio (SCR) and the
effective short circuit ratio (ESCR) usually give a fundamental indication of the strength, and
thereby, the performance of the HVDC system.

24
Short circuit ratio (SCR)
The SCR is obtained from the following equation:

S
SCR = (2.15)
Pd 1

where S is the ac system three-phase symmetrical short circuit in megavolt-amperes (MVA) at


the converter terminal ac bus with 1.0 pu ac terminal voltage. Pd1 is the rated dc terminal
power in megawatts (MW). In this thesis, Pd1 is considered to be equal to the nominal dc
power.

Effective short circuit ratio (ESCR)


The effective ac system impedance can be significantly increased if shunt capacitors including
ac filters are connected at the ac terminal of a dc link. To allow for this, the effective short
circuit ratio (ESCR) is defined as follows:
S − Qc
ESCR = (2.16)
Pd 1

where Qc is the value of the three-phase fundamental MVAr in per unit of Pd1 at per unit ac
voltage of shunt capacitors connected to the converter ac bars.

Hence, the main different between SCR and ESCR is that ESCR includes the effect of ac
system side equipment associated with the HVDC link.

In general, an interconnected ac and dc power system can be classified as:

SCR < 2 weak connection


2< SCR <4 medium connection
4< SCR strong connection

In evaluations based on the SCR and the ESCR, it is important to be aware of:

• Synchronous machines connected at, or near a converter station terminal and


included in the system short circuit strength, should be represented by the
subtransient reactance in the calculations of the short circuit ratios.
• HVDC schemes may have compensation equipment or filters connected to the
converter transformer tertiary windings, which may complicate the relative meaning
of the ESCR.
• The SCR and ESCR should be calculated carefully for each application.
• Evaluations and classification based on these values are only means for preliminary
assessment of potential ac/dc interactions problems. Detailed studies are necessary.

25
2.6.2 Problems associated with weak ac/dc connections
This section will briefly discuss the main problems associated with the operation of a dc
system connected to a weak ac system. A more detailed description of these problems can be
found in [7]. This section is mainly based on [4].

Frequency instability
Frequency instability is often mentioned in relation to weak ac/dc power system
considerations. However, this is not a phenomenon caused by low SCR of the ac system.
Frequency instability is a result of low mechanical inertia of the connected ac system. The
latter can be the situation if the HVDC transmission is connected to a small isolated network,
when only a synchronous condenser is connected to the HVDC terminal.

Harmonic resonance
Problems with harmonic resonance are often due to parallel resonance between ac capacitors,
and the ac power system at low harmonics. Capacitors tend to lower the natural resonance
frequencies of the ac power system, while inductive elements tend to increase the frequencies.
If a large numbers of capacitors are added, the natural frequency seen by the commutation bus
may drop to 4th, 3rd or even 2nd harmonic. If a resonance at one of these frequencies occurs,
there can be a high impedance parallel resonance between the inductive and capacitive
elements on the commutation bus. A low impedance resonance condition could arise in
remote points in the system. Harmonic voltages from these remote points would tend to be
amplified. The avoidance of low-order harmonic resonance is extremely important to reduce
transient overvoltages.

High temporary overvoltages (TOV)


HVDC converters consumes large amount of reactive power, equal to about 50 to 60 percent
of converter MW rating. When there is an interruption of the dc power transfer, the reactive
power consumption of the HVDC converter drops to zero. With a low ESCR system, the
resulting increase in ac voltage due to shunt capacitors and harmonic filters could be
excessive. TOV may cause damage on customer equipment. Special schemes may be
necessary to protect the thyristors in case of restart delays.

Countermeasures to TOV are:


• To use breakers to connect resistors for element switching or use metal-oxide arrestors.
These schemes are called TOV control.
• To equip a converter station with control schemes using fast firing angle control to
reduce TOV.

Voltage interaction
The active and reactive power characteristic of the converter influences the ac terminal
voltage at the HVDC station. In order to minimize the voltage variations, it is important to
control the reactive power demand. The variation in terminal voltage depends also on the total
change in reactive power consumption in addition to components connected at the ac
converter terminal. Examples of the latter components are filters, local loads, SVC and

26
synchronous compensators. Also, the SCR of the connected ac power system will influence
the voltage variations.

During transient disturbances the reactive power consumption of the HVDC may vary widely,
depending on the HVDC control system.

These variations in reactive power and voltage level can cause the following problems:
• Voltage flicker
• Voltage instability
• Cascading events

Voltage flicker
Shunt capacitors are normally installed as discrete banks equipped with breakers. Switching
of these shunt banks at the converter station can cause large voltage changes with weak ac
systems. This is called voltage flicker. To avoid customer complaints because of erratic and
bothersome voltage fluctuations, consideration should be given to the maximum allowable
shunt reactive bank size that can be switched [8].

Voltage instability
Another phenomenon which can occur when a weak ac power system is connected to a dc
system is voltage instability. The latter is especially true for the inverter side of the converter.
The ac as well as the dc voltages are sensitive to changes in loading and an increase in dc
current is accompanied by a fall in ac voltage. The actual increase in power transfer may then
be small. Control of voltage and recovery from disturbances will become difficult and the dc
system response may even contribute to collapse of the ac power system.

The dc system controls may contribute to voltage instability by responding to a reduction in


ac voltage as follows:

• Power control increases dc current to restore power.


• Inverter may increase γ to maintain commutation margin.
• Inverters draw more VAR with reduced voltage at the same time as the capacitors
produce less.
• The ac voltage is further reduced.

Note; problems associated with interaction can be solved by increasing the SCR of the ac
system or dynamic compensation of variations in reactive power.

Cascading events
The robustness and dynamic behavior of the terminal will be of great importance in case of
disturbances with network splitting, low voltage periods etc. A short circuit situation in the
terminal area could for instance lead to voltage problems which may affect the commutation
condition for the converter. A consequence of commutation failure is tripping of the converter.
In a particular network where all the converters operate under approximately the same
conditions, the possibility of loosing all the terminals is high.

27
28
3 Power flow modeling in PSS/E
This chapter describes the establishment of the power flow model used in PSS/E and
constitutes the basis for both power flow and dynamic analysis in the subsequent chapters.
First, this chapter describes the changes made in the data set provided by Statnett. Second, a
brief description of the facility at Ormen Lange is given. Finally, a detailed description of the
power flow modeling of Ormen Lange is presented. The main focus in the latter is the
modeling of the converters at Ormen Lange.

3.1 Modification of data set


This section describes the changes made in the power flow data set provided by Statnett. The
changes made in this section are primarily based on knowledge gained from the preliminary
study [9], and can be verified by studying Appendix D.

3.1.1 Changes made in the Statnett model


The changes made are mainly modifications on the existing data set, with the objective to
obtain a more realistic model in terms of reactive power support in Mid-Norway. However, it
is important to emphasize that the modifications made in this section are not essential for the
power flow simulations in the following chapter. This is because the main focus of the next
chapter is to analyze the principal behavior of the two-terminal dc line model. Hence, the
degree of realism in the remaining power system is of less importance in such principal
analyses.

These modifications are mainly implemented for the following dynamic simulations. Three
changes are made in the “Statnett model”. The following subsections describe the changes in
detail.

3.1.1.1 Disconnection of SVC at Viklandet


The SVC connected to Viklandet will not be installed before 2008. From [9] it is clear that the
SVC at Viklandet will provide a considerable amount of reactive power during system faults
in Mid-Norway. The SVC is thus disconnected to give a more realistic reactive support in
Mid-Norway (pro anno 2007).

3.1.1.2 Disconnection of capacitor bank at Klæbu


During the process of writing this thesis information of an error in the power flow data set
was obtained. The initial data set included a large capacitor bank connected to a bus in Klæbu,
which in reality, does not exist. Since this information was first obtained after the power flow
simulations in Chapter 4 were completed, the simulations in this chapter are performed with
the capacitor bank at Klæbu connected. However, since the objective of Chapter 4 is to
analyze the principal behavior of the two-terminal dc model, the capacitor bank offers no
undesirable effect on the simulation results.

29
Note, in all dynamic simulations the capacitor bank at Klæbu is removed from the data set.

3.1.1.3 Adjusting generator production and generator aggregation


In order to obtain a more stressed power situation in Mid-Norway the generator production in
Mid-Norway is reduced with approximately 50 %. The load in the area remains unchanged,
however, the generator production in West-Norway and Nort-Norway are increased by the
same amount as the decrease in Mid-Norway. Hence, the net change in generator production
is unchanged.

From the preliminary study [9], it became clear that the generator aggregation in Mid-Norway
represents an unrealistic operational condition. Generators within the same power plant are
operated at low ratings. This results in an unrealistic high reactive support in the area.
Therefore, changes are made in the generator aggregation in Mid-Norway to obtain a more
realistic reactive support in the area.

Status before changes are made


In the following, definition of the geographical areas Mid-Norway, North-Norway and West
Norway are presented. Also, the total production within each area is given. The latter values
can be verified by Appendix D.

• Generators in the following area constitute the production in Mid-Norway


ƒ 65 DRM.SVST
ƒ 66 DRM.MIDT
ƒ Total production 2310.90 MW
ƒ Max production 2962.6 MW

• Generators in the following area constitute the production in North-Norway


ƒ 67 DRM.NORD
ƒ 68 DRN.SOR
ƒ 69DRN.NORD
ƒ Total production 4043,7 MW
ƒ Max production 4644,5 MW

• Generators in the following area constitute the production in West-Norway


ƒ 61 DRSV.SKL
ƒ 62 DRSV.BKK
ƒ 64 DRSV.SFE
ƒ Total production 3011,7 MW
ƒ Max production 3929,9 MW

Power production in Mid-Norway after the production is reduced


In Appendix D, all generators with their respective production are given. In order to analyze a
system which represents a situation with less reactive support, the production in Mid-Norway
is reduced with approximately 1112.5 MW. This is approximately a 50% reduction.

30
The generators listed in the latter appendix are divided into groups. Each group represents
generators in the same power plant or in the same geographical area. The purpose of these
groups is to scale down the production within each group in a manner that gives a more
realistic reactive power support. Instead of having e.g. three generators within a group
operating at 30% power rating, two of the three generators are shut down and the remaining
generator operates at 100%. Thus, the reactive power support in the area is reduced and
represents a more realistic generator aggregation.

Power production in North-Norway after the production is increased


The power production in the northern part of Norway is increased with 500 MW. This equals
a 12.3 % power increase. In this region generator aggregation is not considered, and the
power increase is performed by using the scaling function in PSS/E.

The scaling process is not a dispatch activity; it merely scales the existing active power output
of online machines such that the ratio of machine to total power is retained.

Aggregation of generators is not considered in this area because the analysis focuses on the
situation in Mid-Norway.

Power production in West-Norway after the production is increased


The power production in the western part of Norway is increased with 610 MW. This equals a
20.3 % power increase.

In this region the generator aggregation is not considered, and the power increase is
performed by using the scaling function in PSS/E.

3.2 Description of Ormen Lange


This section gives an overall description on how Ormen Lange is implemented in the PSS/E
model. The main focus when establishing Ormen Lange is the converter modeling and this
will be described in detail in the subsequent section. Modeling of the synchronous generator
and the two-winding transformer will only be briefly described.

Figure 19 illustrates how Ormen Lange has been implemented in the PSS/E model. The
configuration is based on technical information provided by ABB and Hydro. Due to
confidentiality, only a brief description of the Ormen Lange facility is presented.

Three two-terminal dc line models are implemented to represent the respective converters at
Ormen Lange. These converters feds three separate synchronous motors which are
represented as three synchronous generators in PSS/E. The facility is connected to the 130 kV
bus at Nyhamna through three separate four winding transformers. The tertiary transformer
winding of each transformer is connected to a filter system. However, in PSS/E the four
winding transformers are represented by two-winding transformers with the filter system
connected directly to the 130 kV bus.

The remaining auxiliary components are represented as static PQ-loads.

31
Figure 19 Illustration of Ormen Lange.

3.3 Converter modeling


This section gives a detailed description of the two-terminal dc line modeling in PSS/E. First,
a detailed parameter description is given. Second, a thorough description of the converter
configuration is presented.

It is important to emphasize that the modeling presented in this section does not represent
Ormen Lange in a realistic manner. The latter is nor the objective of this section. The
objective is merely to establish an alternative converter model which differs from the
traditional PQ representation, and will constitute the basis for the dynamic model presented in
Chapter 5.

The data used in the steady-state model enables not only power flow analysis but also
establishes the initial steady-state for dynamic analysis. Thus, a detailed description is
presented in this section.

3.3.1 Parameter evaluation


This section presents the data used for the two-terminal dc line model implemented in PSS/E.
This section is mainly based on [10, 11].

The data requirements can be divided into the following three groups:
I. Control parameters and set-points.
II. Converter transformers.
III. The dc line characteristic.

32
Data for the two-terminal dc line model are specified on three consecutive data records. These
data records, with their chosen parameter values, are presented in the following three records.

Some of the parameters specified are based on technical information provided by ABB.
However, since the power flow simulations evaluate the principal response of the two-
terminal dc line model, default values is also used.

The values are only presented for one of the three two-terminal dc line models. This is
because all models are implemented in the same manner.

Data Record 1
Parameters defining line quantities and control parameters are given below.

Control mode (MDC)


Chosen value: MDC=2

The line can either be instructed to hold a desired dc current or a desired dc power. By
choosing MDC=2 the line is instructed to hold a desired dc current.

Current or power demand (SETVL)


Chosen value: SETVL= 2840.2

When MDC is two, a positive value for SETVL specifies desired current in amps.

DC line resistance (RDC)


Chosen value: 0.1

This value equals the dc line resistance entered in ohms.

Compounding resistance (RCOMP)


Chosen value: 0

This is the compounding resistance entered in ohms. By using the value 0, the inverter end dc
voltage VDCI is controlled. To control the rectifier end dc voltage VDCR, RCOMP is set to
the dc line resistance, RDC. RCOMP = 0 by default.

Margin entered in per unit of desired dc power or current (DELTI)


Chosen value: 0.1

This is the percentage for which the order is reduced when alpha (rectifier firing delay angle)
is at its minimum and the inverter is controlling the line current.

The difference between the rectifier current order and the inverter current order, also called
current margin, is usually set at 10-15% of rated current. This is to ensure that the two
constant current characteristics do not cross each other to errors in measurements or other
causes [3].

33
Scheduled compounded dc voltage (VSHD)
Chosen value: 16.9

VSHD is the scheduled compounded dc voltage entered in kV. The value entered is based on
information from ABB.

Minimum compounded dc voltage (DCVMIN)


Chosen value: 0

DCVMIN, entered in kV, is set to 0 because it’s only used in constant gamma operations
when the inverter tap setting is held constant and the ac transformer tap is adjusted to control
the dc voltage. DCVMIN = 0 by default.

Mode switch voltage (VCMOD)


Chosen value: 0

If the line is in power control (MDC=1) and the inverter voltage falls below VCMOD
(entered in kV) the line switches to current control mode. VCMOD = 0 by default.

Metered (METER)
Chosen value: I

Metered end code of either rectifier (R) or inverter (I). METER = I by default.

CCCITMX
Chosen value: 20

CCCITMX is the iteration limit for capacitor commutated two-terminal dc line Newton
solution procedure. CCCITMX = 20 by default.

CCCACC
Chosen value: 1

Acceleration factor for capacitor commutated two-terminal dc line Newton solution procedure.
CCCACC = 1 by default.

Data Record 2 and 3


Parameters defining rectifier end data, inverter end data and control parameters are given
below. Parameters describing the rectifier are ended with the letter “R” and parameters
describing the inverter are ended with the letter “I”. Note; the control angle alpha for the
rectifier is replaced with the control angle gamma for the inverter.

Number of bridges in series (IPR/IPI)


Chosen values: IPR = 2, IPI = 2

34
Nominal maximum rectifier firing angle (ALFMX)
Chosen value: ALFMX = 25

ALFMX is the maximum rectifier firing angle, entered in degrees. The maximum firing angle
is only objective (not a firm limit). The converter may be operated above this limit.

Nominal maximum inverter firing angle (GAMMX)


Chosen value: GAMMX = 90

GAMMX is the maximum inverter firing angle, entered in degrees. The maximum firing
angle is only objective (not a firm limit). The converter may be operated above this limit.

Minimum steady-state rectifier firing angle (ALFMN)


Chosen value: ALFMN = 5

ALFMN is the minimum rectifier firing angle, entered in degrees. The minimum rectifier
firing angle is entered to ensure adequate voltage across the valve before firing [3].

ALFMN is a firm limit and the bridges will therefore not be operated in power flow solutions
with firing angles below these values.

Minimum steady-state inverter firing angle (GAMMN)


Chosen value: GAMMN = 15

GAMMN is the minimum inverter firing angle, entered in degrees.

The minimum inverter firing angle (also noted extinction angle) is entered to avoid
commutation failure. Because of the possibility of changes in direct current and alternating
voltage even after commutation has begun, sufficient commutation margin above GAMMN
must be maintained. Typically, the value for GAMMN with acceptable margins is 15° for 50
Hz systems and 18D for 60 Hz systems [3].

GAMMN is a firm limit and the bridges will therefore not be operated in power flow
solutions with firing angles below these values.

Commutation transformer resistance (RCR and RCI)


Chosen value: RCR = 0
RCI = 0

RCR and RCI are, respectively, the rectifier and inverter commutating resistance per bridge,
entered in ohms.

Note, if a commutating resistance value, not equal to zero, is input, PACR or PACI (dc line
equivalent ac load) will not be equal to the desired dc power because of the losses in RCR and
RCI.

35
RCR and RCI accounts for the voltage drop due to commutation overlap. It does not, however,
represent a real resistance and consumes no power [3].

Commutating transformer reactance per bridge (XCR and XCI)


Chosen value: XCR = 0.01
XCI = 0.01

XCR and XCI are, respectively, the rectifier and inverter commutating reactance per bridge,
entered in ohms.

The reactive consumption of the converter can vary greatly depending on the operating α or γ
and on the commutating reactance (usually the converter transformer leakage reactance). The
commutation reactance should include the leakage reactance of the converter transformer and
other reactances in the commutation circuit that may influence the commutation process [7].

Increasing the commutation reactance reduces the rate of change of the dc currents. The
converter bridge design is very dependent of the commutation reactance [12].

Primary base voltage (EBASR and EBASI)


Chosen value: EBASR = 15.3
EBASI = 6.7

EBASR and EBASI are, respectively, the rectifier and inverter primary ac voltage, entered in
kV. The values entered are based on information provided by ABB.

Transformer ratio (TRR and TRI)


Chosen value: TRR = 0.44
TRI = 0.50

TRR and TRI are, respectively, rectifier and inverter transformer ratio.

Maximum tap setting (TMXR abd TMXI)


Chosen value: TMXR = 1.5
TMXI = 1.5

TMXR and TMXI are, respectively, rectifier and inverter maximum tap setting. TMXR and
TMXI are 1.5 by default.

Minimum tap setting (TMNR and TMNI)


Chosen value: TMNR = 0.51
TMNI = 0.51

TMXR and TMXI are, respectively, minimum rectifier and inverter tap setting. TMNR and
TMNI are 0.51 by default.

36
Tap step (STPR and STPI)
Chosen value: STPR = 0.00625
STPR = 0.00625

STPR and STPI are, respectively, rectifier and inverter tap step. STPR and STPI are 0.00625
by default.

Remaining parameters
The remaining parameters are used with their respective default values.

3.3.2 Converter configuration


This section describes both general converter configuration and the converter control system
in PSS/E. This section is mainly based on [13].

3.3.2.1 General considerations


The two-terminal dc line model (also referred to as converter model) used in this thesis
consists of a coordinated rectifier-inverter pair. These pairs place a coordinated set of special
boundary conditions on the ac buses where the line is connected. The two-terminal dc line
model consists of line commutated converters and is illustrated in Figure 20.

Figure 20 Simplified illustration of the two-terminal dc line model [10].

The constraints for the converter model consist of a series of linear and nonlinear equations.
These equations are symmetrical between the rectifier and the inverter. The rectifier and
inverter are only coupled by the transmission line equation. This means that the control
equations for the converter (rectifier and inverter) are decoupled. The converter state can be
obtained by solving the following converter equations.

Equations for the rectifier:

⎛3 2 3X I ⎞
Vdcr = N r ⎜⎜ Eacr cos (α ) − cr dc − 2 Rcr I dc ⎟⎟ (3.1)
⎝ π π ⎠

⎛ 2 I dc X cr ⎞
μ R = ARCCOS ⎜⎜ cos (α ) − ⎟⎟ − α (3.2)
⎝ Eacr ⎠

37
2μ R + sin(2α ) − [sin 2( μ R + α ) ]
TAN (φR ) = (3.3)
cos(2α ) − [ cos 2( μ R + α )]

6N
I acr = I dc (3.4)
π

Equations for the inverter:

⎛3 2 3X I ⎞
Vdci = N i ⎜⎜ Eaci cos ( γ ) − cr dc + 2 Rcr I dc ⎟⎟ (3.5)
⎝ π π ⎠

⎛ 2 I dc X cr ⎞
μ I = ARCCOS ⎜⎜ cos ( γ ) − ⎟⎟ − γ (3.6)
⎝ Eacr ⎠

2μ I + sin(2γ ) − [sin 2( μ I + γ )]
TAN (φI ) = (3.7)
cos(2γ ) − [ cos 2( μ I + γ )]

6N
I aci = I dc (3.8)
π

Equation for the transmission line:

Vdci = Vdcr − Rdc I dc (3.9)

The definitions for the above parameters are given in Table 1. Parameters describing the
rectifier are ended with the letter “r” and parameters describing the inverter are ended with the
letter “i”.

Table 1 Two-terminal dc line parameter definitions.


Parameter Explanation
Vdcr, Vdci dc line voltage, [V]
Eacr, Eaci Open circuit line-to-line voltage on the dc side of converter transformer, [V]
Nr, Ni Number of bridges in series
Xcr, Xci Converter transformer dc side winding commutating reactance, [Ω/phase]
Rcr, Rci Converter transformer dc side winding commutating resistance, [Ω/phase]
Idc dc line current, [A]
Iacr, Iaci Total ac line current flowing into the ac side of converter transformer.
cosr, cosi ac power factor.
α Rectifier firing delay angle.
γ Inverter margin angle.
μR Rectifier overlap angle.
μI Inverter extinction angle.

38
3.3.3 Converter control
This section describes the control system and operation of the converter in PSS/E.

The rectifier and inverter are represented as shown in Figure 21 (see Section 3.3.1 for
parameter explanation). The power flow solution logic adjusts the bridge control angle, α and
γ, and the transformer tap position to control the dc voltage and current.

Figure 21 Rectifier/inverter representation in PSS/E [13].

To understand the principals which are applied to control the dc voltage and current, it is
necessary to understand the relationship between the rectifier and inverter characteristic in
PSS/E. The converter characteristic can be divided in to states. The first state is called normal
operation, and applies for situations where the ac voltage at both rectifier and inverter are
close to normal. This situation is illustrated in Figure 22. In this situation γ is adjusted to
maintain the specified voltage on the dc line. The voltage control is current compounded to
allow the voltage to be specified at a designated point along the line. The inverter will adjust γ
to maintain line voltage at the set value, as long as the rectifier is able to control the line
current.

39
Figure 22 Converter characteristics in normal operation [13].

The second state represents the situation when the ac voltage at the rectifier is depressed.
Figure 23 illustrates the converter characteristics for the latter state. In this state the control of
the dc voltage is abandoned and γ is adjusted to maintain the dc current. The dc current, which
the inverter is to control, is defined by the current margin, ΔI. The current margin is specified
in “Data record 1” by the parameter “DELTI”. The inverter will now control the dc current to
a value reduced by a fraction DELTI compared to the desired current.

Figure 23 Converter characteristics when the rectifier ac voltage is depressed [13].

40
Converter transformer
The converter transformer tap position is adjusted by the control logic to attempt to hold the
bridge firing angle above the predefined minimum and maximum values. The minimum
values for α and γ are firm limits. This means that the converter will not be operated below
these limits.

The converter taps are only adjusted until α and γ are between their specified maximum and
minimum values. This means that the control logic does not adjust the taps to minimize α and
γ when they fall between their maxima and minima.

The converter transformer is characterized by its leakage impedance and both its nominal
absolute turn ratio and its per unit ratio in relationship to nominal value. These parameters are
specified in “Data record 2” for the rectifier transformer and “Data record 3” for the inverter
transformer.

Note; during every power flow solution the following variables are calculated:

Table 2 Power flow calculated variables.


Calculated variable Description
Pac(R,I), Qac(R,I) dc line equivalent ac load, [MVA]
α Rectifier firing delay angel, [degrees]
γ Inverter margin angle, [degrees]
Vdc(R,I) dc line voltage, [V]
Idc dc line current, [A]
TAP (R,I) Off-nominal tap setting, [pu]

3.4 Synchronous generator and two winding transformer


The focus in this thesis is to establish and analyze the converter model in PSS/E. The other
components are only implemented as a necessity for the converter model to operate properly.
Hence, there will be given no detail description of the generator and transformer modeling in
this section.

Synchronous generator
The following non default values are used for the generator parameters:

• Mbase(MVA) = 53.98 Based on information from ABB


• R Source (pu) = 0.007 Standard value for this generator rating
• X Source (pu) = 0.300 “Standard value”

The remaining parameters are used with their default values. The reader may refer to attached
save-file in Appendix D for parameter information.

41
The generators are modeled as swing buses, i.e. with a type code 3, and are held at constant
voltage and phase angle. After each power flow solution the active and reactive power are set
such that the mismatch at the bus is zero [10].

Two winding transformer


There will be given no description of the parameters used for the two-winding transformers
implemented at Ormen Lange. The reader may refer to attached save-file in Appendix D for
parameter information.

42
4 Power flow simulations
This chapter contains the power flow analysis performed in this thesis. The objective of this
chapter is to gain knowledge about the performance of the steady-state two-terminal dc line
model implemented at Ormen Lange. This knowledge will serve as basis for the dynamic
simulations in the subsequent chapters.

This chapter uses the term converter model to refer to the two-terminal dc line model.

4.1 Introduction
In this chapter the following points are investigated:

I. The control logic system of the converter model in PSS/E. The investigation clarifies the
behavior of the converter when exposed to a voltage depression at Nyhamna. The
rectifier constitutes the link to the remaining power system and is therefore the main
focus in these simulations.
II. Parameters influencing the reactive consumption of the converter.
III. The consequence of implementing a swing bus at the inverter.
IV. Principal comparison of the converter model and the PQ-model.

The knowledge obtained from the power flow simulations will serve as a basis for the
following dynamic simulations. Some of the figures illustrated in this chapter are identical to
figures used in Chapter 3. However, the figures are included to increase the readability.

4.2 Initial conditions and assumptions


This section presents the initial conditions and assumptions made for the power flow
simulations presented in this chapter.

4.2.1 Power flow assumptions


The power flow file used in this chapter is “Converter_model_chapter4.sav” and can be found
in Appendix D.

The following assumptions, which differ from the default setting provided in PSS/E, were
made when establishing the power flow file:

- Switched shunt adjustments locked.


- Constant MVA loads converted with the following real power distribution:
o 40 % constant current
o 40 % constant admittance
o 20 % constant power

43
- Constant MVA loads converted with the following reactive power distribution:
o 0 % constant current
o 100 % constant admittance
o 0 % constant power

The initial conditions for the converter model are given in the table below. These data are
obtained by solving the power flow for the file “Converter_model_chapter4.sav”.
Explanations for the parameters presented below are given in Table 1 and Table 2 in Chapter
3.

Initial values:
Table 3 Initial values.
DC converter data AC system data
Vdcr Vdci Idc α γ Tap(R) Eacr Pac(R) Qac(R)
[kV] [kV] [A] [deg] [deg] [kV] [MW] [MVAr]
17.2 16.9 2840.2 12.78° 16.20° 1.035 6.55 * 48.8 11.8

Initial values in per unit:


Table 4 Initial values in per unit.
DC converter data AC system data
Vdcr Vdci Idc α γ Tap(R) Eacr Pac(R) Qac(R)
[pu] [pu] [pu] [deg] [deg] [pu] [pu] [pu]
1 1 1 12.78 16.20 - 1 * 1 1

(*) The value entered for Eacr is calculated from the following equation:

⎛3 2 3X I ⎞
Vdcr = N r ⎜⎜ Eacr cos (α ) − cr dc − 2 Rcr I dc ⎟⎟ (4.1)
⎝ π π ⎠

The figure below shows the rectifier side of one of the three converters implemented in PSS/E.
This figure is identical to Figure 21 on page 39. XCR is the rectifier commutating
transformer reactance, TRR is the rectifier transformer ratio and TAPR is the rectifier tap
setting. The terms used in relation to the rectifier side is based on the figure below.

44
4.3 Application of the disturbance
Two disturbances are introduced in this section. The first disturbance is loss of 70 MVAr
local shunt compensation at Nyhamna. The second disturbance is loss of 70 MVAr + 48
MVAr compensation at Nyhamna. The object of these disturbances is to clarify the
performance of the converter model when exposed to a voltage depression at Nyhamna. The
disturbances introduced do not represent a realistic scenario seeing that a loss of this amount
of compensation will result in a shutdown of the plant. However, these disturbances act as an
effective means to depress the bus voltage at Nyhamna to a varying degree.

The cases studied are given in the following tables.

Disturbance 1
Table 5 Case summary for Disturbance 1.
Case Case explanation
A1 Loss of 70 MVAr compensation at
Nyhamna. Rectifier tap setting adjustable.
B1 Loss of 70 MVAr compensation at
Nyhamna. Rectifier tap setting locked.

Disturbance 2
Table 6 Case summary for Disturbance 2.
Case Case explanation
A2 Loss of 70 MVAr + 48 MVAr compensation
at Nyhamna. Rectifier tap setting adjustable.
B2 Loss of 70 + 48 MVAr compensation at
Nyhamna. Rectifier tap setting locked.

45
4.4 Calculated solutions
This section presents the simulation results. The discussion is given consecutive as the results
are presented to increase the readability.

Table 7 shows the results from Disturbance 1.

Table 7 Calculated solutions after loss of 70 MVAr compensation.


DC converter data AC system data
Case Vdcr Vdci Idc α γ Tap(R) Eacr Pac(R) Qac(R)
[pu] [pu] [pu] [deg] [deg] [pu] [pu] [pu]
A1 1 1 1 8.35 16.20 1.01 0.986 1 0.695
B1 0.99 1 0.9 5 16.48 1.035 0.973 0.913 0.424

Table 8 shows the results from Disturbance 2.

Table 8 Calculated solutions after loss of 70 MVAr+48 MVAr compensation.


DC converter data AC system data
Case Vdcr Vdci Idc α γ Tap(R) Eacr Pac(R) Qac(R)
[pu] [pu] [pu] [deg] [deg] [pu] [pu] [pu]
A2 1 1 1 8.25 16.20 0.985 0.985 1 0.686
B2 0.97 0.970 0.9 5 21.25 1.035 0.950 0.873 0.415

The results presented in Table 7 and Table 8 are also illustrated in single line diagrams in
Appendix A.

4.5 Discussion of the results


This section contains discussion of the results presented in the previous section. It is
important to emphasize that the evaluations made in this section is only valid for the
assumptions made in this chapter and the parameter settings defined in Chapter 3.

4.5.1 Case A1
The voltage depression at Nyhamna causes the control logic to reduce the rectifier transformer
tap position to attempt to hold the rectifier firing angle α above its minimum and below its
maximum value. The rectifier tap position is reduced from 1.035 to 1.01. The objective is to
increase the voltage on the valve side of the rectifier transformer (Eacr). However, the change
in tap position also changes the reactive consumption of the rectifier. In this case the reactive
consumption of the rectifier is reduced to 0.695 per unit. Since the commutating reactance is
held constant, the reduction in reactive consumption of the rectifier, Qac(R), is due to the
reduction of α from 12.78° to 8.35°.

Since the voltage on the valve side of the rectifier transformer is maintained close to its
nominal value, Idc, Vdcr, and Vdci are unaffected when exposed to the disturbance defined by

46
case A1. It is also clear that since Idc and Vdcr is unaffected by this disturbance, Pac(R) is also
unaffected.

The operation of the converter when exposed to the disturbance defined by A1, can be
illustrated by the figure below. This figure is identical to Figure 22 on page 40. This figure
illustrates the relationship between the rectifier and the inverter characteristics when the ac
voltage at both the rectifier and inverter are close to normal. As the inverter is given a current
order lower than the rectifier by the value of the current margin, it is forced into minimum
commutation margin control, which gives the maximum dc voltage for a given ac voltage
applied to the inverter.

The intersection of the two characteristics determines the mode of operation. The rectifier is
operating with constant current control and the inverter is operating at constant (almost
minimum) extinction angle.

Due to the reduction in tap setting of the rectifier transformer, the ac voltage at the rectifier is
still within its “normal” range when exposed to the voltage depression. Hence, the converter
is in normal operation, with the rectifier in control of the dc current.

Figure 24 is included to give a visual picture on how the control system is operated. This
figure is simplified and do not represent the correct model.

Figure 24 A illustrative model of the control system.

47
The converter taps are adjusted only until the corresponding bridge firing angles are between
their specified minimum and maximum values. Hence, taps are not adjusted to minimize
firing angle once they are between their maximum and minimum [13].

The latter explains why the inverter margin angle γ is slightly above its minimum value when
the inverter is operating at constant extinction angle.

4.5.2 Case B1
In this case the converter is exposed to the same disturbance as in case A1, however, the
rectifier transformer tap setting is locked to its initial value. The objective of this case is to
evaluate the impact of a rectifier ac voltage depression without the influence of transformer
tap changers. The latter may represent a transient situation were the tap changer action is too
slow and hence not considered.

The converter response to Case B1 can be illustrated in the figure below. This figure is
identical to Figure 23 on page 40.

In normal operation the inverter margin angle, γ, is adjusted to maintain a specified voltage on
the dc line. However, in case B1 the control of the dc voltage is abandoned and γ is adjusted to
maintain the dc current at a value which is the desired current reduced by the current margin,
ΔI. In the data set used in these analyses, the parameter “DELTI” is used to specify the
current margin. DELTI is set to be 0.1 per unit. This means that the current order is reduced
by this fraction when α is at its minimum and the inverter is controlling the line current [13].

The results from Table 7 confirm the evaluation made above. Since the rectifier transformer
tap setting is locked to its initial value, the rectifier transformer will not boost the valve side
of the rectifier transformer. This means that Eacr is given by the ac voltage at the primary side
of the rectifier transformer (called ORMEN TRAFO in PSS/E) multiplied
⎛ Rectifier transformer ratio ⎞
with ⎜ ⎟ . From Table 7 it can be seen that Eacr is reduced to 0.973
⎝ Rectifier tap setting ⎠
per unit. This reduction causes α to be reduced to its minimum value, α=αmin=5°. As described
above, the inverter takes over the current control and the dc current is reduced to a fraction
equal to the current margin, i.e. Idc=0.9 per unit. Due to the locked tap setting of the rectifier
transformer, the rectifier dc voltage, Vdcr, is reduced to 0.944 per unit.

48
Since both the dc current and the rectifier dc voltage are reduced, Pac(R) is reduced to 0.913
per unit.

The rectifier reactive consumption, Qac(R), is reduced to 0.424 per unit. This drastic reduction
is a result of a reduction in the rectifier firing angle from α=12.78° to α=αmin=5°. It is thus
clear that the rectifier reactive power consumption is reduced when α is reduced. A reduction
in α also improves the power factor for the rectifier, thus reducing the reactive power
consumption.

4.5.3 Case A2 and B2


From Table 6 it can be seen that Case A2 and B2 are defined in the same manner as Case A1
and B1. However, the disturbance introduces a compensation loss of approximately 118 MVAr
at Nyhamna. This disturbance is called Disturbance 2 and is introduced to depress the ac bus
voltage at Nyhamna further.

By evaluating the results from Case A2 in Table 8, it is clear that the results are almost the
same as for case A1. Even though a 118 MVAr compensation loss leads to a greater voltage
depression at the primary side of the rectifier transformer, the transformer reduces its tap
settings and thus boosts the valve side of the rectifier. This is done by reducing the rectifier
transformer tap setting from 1.035 to 0.985. Seen from the rectifier, a 118 MVAr
compensation loss is approximately the same as a 70 MVAr compensation loss. This can be
confirmed by comparing Eacr from Case A1 with Eacr from Case A2.

In other words; the rectifier transformer tap changer compensates the additional voltage
depression. However, the latter is only valid when the rectifier minimum tap setting is
adequate.

In case B2, see Table 6, the converter is exposed to the same disturbance as in Case A2,
however, in Case B2 the rectifier transformer tap setting is locked at its initial value. As
described for Case B1, the control of the dc voltage is abandoned by the inverter and γ is
adjusted to maintain the dc current at a value which is the desired current reduced by the
current margin, ΔI. Since the rectifier tap setting is locked, this disturbance leads to a greater
voltage depression at the valve side of the rectifier transformer. Consequently, the rectifier dc
voltage is reduced to 0.971 per unit, see Table 8. Due to current control at the inverter, the
inverter increases the inverter margin angle (γ) from 16.20° to 21.25°. This causes a reduction
in the inverter dc voltage, Vdci, and is necessary in order to maintain scheduled dc current. The
increased inverter margin angle also results in an increased consumption of reactive power at
the inverter, see Appendix A.

The reduction in Pac(R) and Qac(R) can be explained in the same manner as for the previous
cases. When comparing the reactive consumption of the rectifier for Case B1 and Case B2, one
can see that the reactive consumption is slightly reduced for Case B2. The difference in
reactive consumption is due to the fact that the amount of active power going into the rectifier,
Pac(R), in Case B2 is less than in Case B1.

49
The latter can be seen from the following equation:

Qa = Pa ∗ tan ϕ

which is identical to Equation (2.13) in Section 2.4.2.

4.6 Reactive power consumption of the converter


When analyzing the influence of implementing a converter model in power flow simulations,
the converter reactive consumption is a key factor that needs to be considered. From the
previous sections it is clear that the reactive consumption of the converter can vary greatly
depending on the operating α and γ. However, the reactive consumption also depends on the
commutating reactance, and the latter will be illuminated in this section.

The commutation reactance should include the leakage reactance of the converter transformer
and other reactances in the commutation circuit that may influence the commutation process.
Due to the uncertainty of the commutation reactance in the previous simulations, and its
influence on the converter reactive consumption, this section evaluates the effect of varying
the rectifier commutation reactance. Only the rectifier commutation reactance is evaluated
because the rectifier constitutes the link to the remainder power system, and affects the power
system with its reactive consumption [7].

It should be noted that varying the control angle (α and γ), and by this, the consumption of
reactive power in one converter station, can result in a corresponding variation in the control
angle and reactive consumption in the other station. However, since the control equations for
the rectifier and inverter are decoupled in power flow simulations, no considerations are made
on a possible influence on the inverter reactive consumption [7, 13].

The figures listed below illustrate how the reactive consumption of the rectifier is influenced
by varying the rectifier commutating reactance, XCR.

Figure 25 illustrates how marginal changes in the commutating reactance influence the
reactive consumption of the rectifier. Figure 26 illustrates how a substantial increase in the
commutating reactance influences the reactive consumption of the rectifier. In both figures,
the reactive consumption is given in per unit of the nominal rectifier reactive consumption, i.e.
Qac(R) = 11.8 MVAr.

50
1,4 6
Rectifier reactive consumption [pu]

Rectifier reactive consumption [pu]


1,2
5

1
4

0,8

0,6

2
0,4

0,2 1

0
0
0,01 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,5 1 1,5 2 2,5

Commutating reactance [ohm] Commutating reactance [ohm]

Figure 25 Rectifier reactive consumption for Figure 26 Rectifier reactive consumption for
marginal changes in rectifier commutating large changes in rectifier commutating
reactance. reactance.

4.6.1 Discussion of the results


Figure 25 shows that an increase in the rectifier commutating reactance from XCR=0.01 Ω
(which is the initial value) to XCR=0.08 Ω results in a small decrease in the rectifier reactive
consumption. This contradicts with the statement above which implies that the reactive
consumption increases with an increased commutating reactance. However, the small
reduction in reactive consumption is caused by a corresponding reduction in rectifier firing
angle, α. This means that when the commutating reactance increases to XCR =0.08 Ω, the
reduction in α “compensates” for the actual increased reactive consumption from the
commutating reactance.

Increasing the commutating reactance from XCR=0.08 Ω to XCR = 0.14 Ω leads to a gradual
increase in the reactive consumption. Also in this situation there is a reduction in α as the
commutating reactance increases. However, the contribution from the increased commutating
reactance now dominates the reduction in α, thus resulting in a net increased consumption.
Figure 25 shows that increasing the rectifier commutating reactance from XCR=0.01 Ω to
XCR=0.14 Ω results in a 26 % increased reactive consumption at the rectifier.

In Figure 26 the same principals are illustrated, though with a greater increase in the
commutating reactance. This figure illustrates how the rectifier reactive consumption changes
when the commutating reactance varies from XCR=0.5 Ω to XCR=2.5 Ω. It is clear that the
reactive consumption is drastically increased when the commutating reactance increases from
the initial value to XCR=2.5 Ω. Increasing XCR to 0.5 Ω result in a reactive consumption of
2.32 per unit. If XCR is increased further, e.g. XCR = 2 Ω, the reactive consumption is
increased to approximately 5 per unit.

Note; Figure 25 and Figure 26 do not give an unambiguous explanation on how the rectifier
reactive consumption is influenced by the rectifier commutating reactance. Since there are
several parameters in the rectifier model that changes as a consequence of changing the
commutating reactance, it is not possible to conclude that the changes in reactive power

51
consumption is caused by the commutating reactance alone. The rectifier e.g. compensates the
increased voltage drop by reducing the rectifier firing angle, α, and the rectifier transformer
tap setting.

To avoid the influence of a reduction in α and rectifier transformer tap settings, it is possible
to “force” PSS/E to maintain a constant α and transformer tap setting during the simulations.
This is done by specifying the initial value for α as the minimum rectifier firing angle,
ALFMN, and the initial value for the rectifier transformer tap setting as the minimum rectifier
transformer tap setting, TMNR. However, this leads to a reduction of the active power going
into the rectifier and will obviously influence the reactive consumption as well (see Equation
(2.13)). Therefore, this is not considered in detail.

4.7 Influence from the swing bus on the inverter


From a system viewpoint, it is the rectifier side which is of most interest since this side is
directly coupled to remaining power system and its behavior can have a significant impact on
the ac system. Consequently, this chapter has mainly focused on the mechanisms taking place
on the rectifier side of the converter.

When a two-terminal dc line model is implemented at Nyhamna, the inverter bus becomes
decoupled from the remaining ac system. Consequently, the inverter bus must be defined as a
swing bus in order to execute the simulations. Hence, this section gives a short introduction to
the mechanisms taking place on the inverter side of the converter. The objective is primarily
to give a description of how the behavior of the swing bus influences the results from the
previous simulations.

Figure 27 shows the inverter side of one of the three converters implemented in PSS/E. XCI is
the inverter commutating transformer reactance, TRI is the inverter transformer ratio and
TAPI is the inverter tap setting. The machine connected to the swing bus illustrates the
synchronous machine at Ormen Lange.

Figure 27 Inverter side of the converter at Ormen Lange.

52
From the previous analyses the effect of a voltage depression at the ac side of the rectifier
were analyzed. The results showed that the rectifier transformer adjusts its tap setting to
maintain the voltage on the valve side of the rectifier transformer close to its nominal value.
From the results given in Appendix A, it is clear that this mechanism does not take place on
the inverter side of the converter. This is due to the fact that during power flow solutions, the
voltage magnitude and phase angle at each swing bus are held constant. The bus voltage at the
swing bus, VS, is specified to be 6.7 kV and the phase angle, VA, is set to be 0°. The
generator connected to the swing bus will adjust its power output to maintain the specified
voltage and phase angle. Hence, a voltage depression at the valve side of the inverter
transformer will never take place and there will be no tap adjustments on the inverter
transformer [10].

When a disturbance introduced on the rectifier side causes the inverter margin angle (γ) to
change, this leads to a new reactive consumption at the inverter. The generator handles the
reactive change by adjusting its reactive output. The inverter is decoupled from the remaining
system and all changes in the operation condition for the inverter is handled by the swing bus.

4.8 Converter versus PQ representation of Ormen Lange


This section gives a short principal evaluation of the consequence of representing Ormen
Lange with a converter model instead of a PQ-model. The evaluation is focused on the
reactive consumption of the latter models.

In power system simulation programs, one uses simplified models to represent complex
facilities. Ormen Lange represents such a facility. In PSS/E there are several feasible ways of
representing this facility. In previous studies, Statnett has used a PQ representation. This
means that Ormen Lange is represented as a constant active and reactive load. When using a
PQ representation, the active and reactive consumption is only dependent on the initial chosen
set point (independent of system operational conditions). However, the latter is not applicable
for a converter representation.

In order to numerically compare the response of two different models representing the same
facility in a simulation program, the following criteria should be fulfilled:

I. The initial power flow in both models should be approximately the same.
II. Adequate input data and control parameters for the two-terminal dc line model
should be used.

In the simulations performed in this chapter, neither of the above criteria’s are fulfilled. The
data for the converter model is uncertain, and it is therefore less meaningful to strive after an
initial power flow which is identical to the PQ-model utilized by Statnett. Hence, the
utilitarian value of performing a numerical comparison of the PQ-model and converter model
is low, and will not be performed in this chapter.

53
4.8.1 Principal comparison
Even though numerical comparisons are less meaningful, principal comparisons can be made.
As described above, the PQ-model will consume approximately the same amount of power
independent of any faults introduced. It is thus of interest to analyze the principal response of
the converter model when exposed to a system fault. In the previous sections, analyses on
how a voltage depression at Nyhamna influences the rectifier were performed. In these
steady-state simulations the change in rectifier reactive consumption, is of greatest interest to
analyze. This is because the rectifier constitutes the junction to the remainder ac system, and
its reactive consumption will directly influence the state of the ac system.

The results in Table 7 and Table 8 showed that a voltage depression at Nyhamna resulted in a
reduction in the rectifier reactive power consumption. The latter can also be verified from
Appendix A. The reduction in reactive consumption occurs because the power flow solution
logic reduces the firing delay angle, α, to “counteract” the voltage depression.

Hence, in a situation with depressed voltage the latter operation of the converter solution logic
causes the converter model to exhibit less stress to the ac system than the PQ-model. That is,
the converter model reduces its reactive consumption in a situation where the ac system is
already stressed.

Note, it is important to acknowledge that the power flow solution logic only adjust the
converter taps until the corresponding bridge firing angles are between their specified
maximum and minimum values. Hence, transformer taps are not adjusted to minimize
reactive power consumption [13].

4.9 Summary
This section presents a brief abstract of the evaluations made in this chapter.

In Section 4.3, two disturbances were introduced. The objective of these disturbances was to
analyze the performance of the converter model when the bus voltage at Nyhamna was
depressed. For each of the latter disturbances, two sub-cases were defined. The first case
represented a situation with adjustable rectifier tap setting and the second case represented a
situation with locked tap setting. The purpose of locking the tap setting was to analyze a
transient situation where the action of the tap changers was to slow to be considered.

The results from Section 4.4 illustrated important characteristics of the implemented two-
terminal dc line model. The rectifier tap setting was reduced when the voltage at Nyhamna
was depressed. This reduced the rectifier firing angle, and the voltage on the valve side of the
rectifier was maintained close to its nominal value. This means that the rectifier was still in
control of the dc current, and all scheduled dc values were unaffected by the disturbance.
However, with the rectifier tap setting locked, the transformer did not “boost” the voltage on
the valve side of the rectifier transformer. The latter voltage reduction caused the rectifier
firing angle to be reduced to its minimum, and the inverter assumed control of the dc current.

54
The dc current was reduced to a fraction equal to the current margin (defined as DELTI in
Section 3.3.1) along with the remainder dc values.

Hence, the presence of an adequate rectifier transformer tap setting is essential for the two-
terminal dc line model to maintain scheduled dc values during voltage depressions.

In Section 4.6, the influence of varying the rectifier commutation reactance was analyzed. The
objective of these analyses was to investigate to what extent the commutation reactance
influenced the rectifier reactive consumption. The results showed that a marginal increase in
the commutation reactance caused a reduction in reactive consumption. The latter was a result
of a corresponding reduction in rectifier firing delay angle (α). The reduction in α
compensated the actual increase in reactive consumption. However, with a more substantial
increase in the commutation reactance, the reduction in α did not compensate adequately, and
the rectifier reactive consumption was greatly increased.

In Section 4.7, the mechanisms taking place on the inverter side were addressed. Since the
inverter bus becomes decoupled from the remaining ac system, the inverter bus must be
defined as a swing bus. This means that the generator connected to the swing bus will adjust
its power output to maintain scheduled bus voltage and phase angle. Hence, a voltage
depression on the inverter bus will never take place and there will be no tap adjustments on
the inverter transformer. All change in operation condition for the inverter is handled by the
swing bus, and will not influence the remaining ac system.

Section 4.8 discussed the principal difference between the PQ-model and the converter model.
The main focus in this section was the reactive power consumption of the models. During a
voltage depression at Nyhamna, the PQ-model will consume approximately constant reactive
power. However, the latter is not true for the converter model. When the voltage on the valve
side of the rectifier transformer is depressed, the converter solution logic reduces the rectifier
firing angle. Consequently, the rectifier reactive consumption is reduced. Hence, the converter
model exposes the ac system to less stress than the PQ-model during voltage depressions.

55
56
5 Dynamic modeling in PSS/E
This chapter gives a detailed description of the modeling and operation of the dynamic two-
terminal dc line model, CDC4T. This chapter is a continuance of the corresponding power
flow description given in Chapter 3, and constitutes the basis for the subsequent dynamic
simulations.

The chapter consists of four sections. The three first sections give, respectively, a description
of converter modeling, configuration and control. The last section briefly discusses the
dynamic modeling and assumptions for the synchronous generator implemented on the
inverter side.

This chapter uses the term converter model to refer to the dynamic two-terminal dc line model.

5.1 Converter modeling


It is important to acknowledge that the actual converter system at Ormen Lange is a complex
and complicated configuration. Consequently, this impedes establishment of a realistic
converter model in simulation programs like PSS/E. The latter is nor the objective of this
section. The objective is merely to establish a dynamic converter representation of Ormen
Lange, which differs from the traditional PQ representation. This section is mainly based on
[14].

5.1.1 Parameter evaluation


This section presents the chosen values for the parameters constituting the dynamic two-
terminal dc line model, CDC4T. It is important to emphasize that the values chosen in this
section does not necessary represent realistic values. Many of the chosen values are inspired
from an example given in [15].

Minimum alpha for dynamics (ALFDY)


Chosen value: ALFDY = 5

ALFDY is the dynamic firing delay angle entered in degrees. The dynamic angle limit
constitutes the range on transient basis. The dynamic angle is often reduced compared to the
steady state value (ALFMIN) because the firing angle limit of a dc transmission line generally
has a wider range on a transient basis than in steady-state. See Figure 32 on page 65.

Minimum gamma for dynamics (GAMDY)


Chosen value: GAMDY = 15

GAMDY is the dynamic inverter margin angle entered in degrees. The dynamic angle limit
constitutes the range on transient basis. The dynamic angle is often reduced compared to the
steady state value (GAMMIN) because the firing angle limit of a dc transmission line
generally has a wider range on a transient basis than in steady-state.

57
DC voltage transducer time constant (TVDC)
Chosen value: TVDC = 0.05

TVDC is the dc voltage transducer time constant entered in seconds. The chosen value is
based on an example given in [15].

DC current transducer time constant (TIDC)


Chosen value: TIDC = 0.05

TIDC is the dc current transducer time constant entered in seconds. The value chosen is based
on an example given in [15].

Note; by setting TVDC and TIDC to zero the measured dc voltage will be equal to the
instantaneous dc voltage. This can be seen from Figure 33 on page 65.

Rectifier ac blocking voltage (VBLOCK)


Chosen value: VBLOCK = 0.6

VBLOCK is the rectifier ac blocking voltage entered in per unit. The rectifier and inverter
will be shutdown, i.e. blocked, if the ac voltage at the rectifier falls below VBLOCK.

Rectifier ac unblocking voltage (VUNBL)


Chosen value: VUNBL = 0.65

VUNBL is the rectifier ac unblocking voltage entered in per unit. The value entered for
VUNBL determines at which ac voltage the rectifier will restart.

Minimum blocking time (TBLOCK)


Chosen value: TBLOCK = 0.1

TBLOCK is the minimum blocking time entered in seconds. The value entered for TBLOCK
will therefore be the minimum time the rectifier remains blocked (if already blocked). The
chosen value is based on an example given in [15].

Inverter dc bypassing voltage (VBYPAS)


Chosen value: VBYPAS = 0.6

VBYPAS is the inverter dc bypassing voltage entered in kV.

Inverter ac unbypassing voltage (VUNBY)


Chosen value: VUNBY = 0.55

VUNBY is the inverter ac unbypassing voltage entered in per unit. If bypassed, the inverter
may reestablish dc voltage when the voltage at its ac bus rises to the per unit value, VUNBY.

58
Minimum bypassing time (TBYPAS)
Chosen value: TBYPAS = 0.1

TBYPAS is the minimum bypassing time entered in seconds. If bypassed, the inverter
remains bypassed for a minimum of TBYPAS seconds. The chosen value is based on an
example given in [15].

Minimum dc voltage following block (RSVOLT)


Chosen value: RSVOLT = 6

RSVOLT is the minimum dc voltage entered in kV. Restarting from a blocking, the dc
voltage is among other parameters specified by the parameter RSVOLT. See Figure 37 on
page 68.

Minimum dc current following block (RSCUR)


Chosen value: RSCUR = 500

RSCUR is the minimum dc current following a block entered in amps. Restarting from a
blocking, the dc current is among other parameters specified by the parameter RSCUR. See
Figure 37 on page 68.

Voltage recovery rate (VRAMP)


Chosen value VRAMP = 5

VRAMP is the voltage recovery rate entered in pu/sec. See Figure 37 in Section 5.3 for more
explanation. The chosen value is based on an example given in [15].

Current recovery rate (CRAMP)


Chosen value: CRAMP=5

CRAMP is the current recovery rate entered in pu/sec. See Figure 37 on page 68 for more
explanation. The chosen value is based on an example given in [15].

Minimum current demand (C0)


Chosen value: C0 = 400

C0 is the minimum current demand entered in amps. See Figure 39 on page 69. However, the
minimum current demand can be overridden during restart of the converter.

Voltage limit point 1 (V1)


Chosen value: V1 = 8

V1 is voltage limit point 1 entered in kV. V1 defines one of the points which constitute the
voltage-dependent current limit (VDCL) profile, see Figure 39 on page 69.

59
Current limit point 1 (C1)
Chosen value: C1 = 1000

C1 is current limit point 1 entered in amps. C1 defines one of the points which constitute the
VDCL profile, see Figure 39 on page 69

Voltage limit point 2 (V2)


Chosen value: V2 = 15.3

V2 is voltage limit point 2 entered in kV. V2 defines one of the points which constitute the
VDCL profile, see Figure 39 on page 69.

Current limit point 2 (C2)


Chosen value: C2 = 3000

C2 is current limit point 2 entered in amps. C2 defines one of the points which constitute the
VDCL profile, see Figure 39 on page 69.

Voltage limit point 3 (V3)


Chosen value: V3 = 15.3

V3 is voltage limit point 3 entered in kV. V3 defines one of the points which constitute the
VDCL profile, see Figure 39 on page 69.

Current limit point 3 (C3)


Chosen value: C3 = 3000

C3 is current limit point 3 entered in amps. C3 defines one of the points which constitute the
VDCL profile, see Figure 39 on page 69.

Minimum time stays in switched mode (TCMODE)


Chosen value: TCMODE = 0.1

TCMODE is the minimum time stay in switched mode entered in seconds. The chosen value
is based on an example given in [15].

5.2 Converter configuration


This section describes the configuration and operation of the converter model used in PSS/E.
This section is mainly based on [13, 15].

5.2.1 General considerations


The performance of the converter is dominated by its control. However, the bandwidth of the
control is far greater than the bandwidth of the PSS/E simulation. Therefore it is not practical

60
to represent the detailed dynamic of these controls. Hence, this section gives a general
introduction of the control of the converter model.

Figure 28 illustrates the arrangement of dc transmission control of a converter bridge. Each


bridge is controlled by a local feedback loop of bandwidth consistent with the firing delay
accuracy requirements of the rectification/inversion process. The local loops works
independently to maintain bridge current or voltage at desired values. An outer control loop
provides the desired values and acts in a supervisory role and coordinates the action of the
several converter bridges and the ac power system.

Figure 28 Illustration of dc transmission control [15].

To understand the behavior of the converter model, the behavior of the bridges and their inner
control loops must be investigated. A rectifier bridge may be regarded as an adjustable
voltage source forcing current though the transmission system resistance and inductance,
against the constant back-emv of the inverter. An illustration of this is shown in Figure 29.

Figure 29 Illustration of a rectifier bridge [15].

By applying current setpoint changes to rectifier voltage on an open-loop basis, a simple


current control could be set up with a gain equal to the dc resistance as shown in Figure 30.

61
Figure 30 Open-loop rectifier current control [15].

The step change of current setpoint produces a time response as shown in Figure 30. The
figure shows that the voltage changes in a step and the current follows with a delay time
constant determined by inductance and resistance. The time response would be small
compared to those of principal importance elsewhere in PSS/E, however, not negligible.

It is important to acknowledge that a real dc transmission rectifier is not operated by adjusting


its output voltage in the open-loop manner as described above. In a real dc transmission
rectifier, the local bridge is a feedback loop that adjusts firing angle delay to control the dc
current to a set point. This is illustrated in Figure 31.

Figure 31 Rectifier current control in a real dc transmission rectifier [15].

The controller transfer function depends on details of the converter bridge design and is
usually complex and nonlinear. The bandwidth is broad in relation to the 0 to 30 rad/sec
bandwidth over which PSS/E simulations is applicable. Figure 31 shows a typical response of
a bridge control loop to a step change of current setpoint. The feedback controller forces the
dc current rapidly to its new value by transient overadjustment of the rectifier voltage. This
rapid response is generally shorter than the shortest time interval that can be recognized
within the bandwidth of PSS/E.

Since the local converter bridge control and its response are so rapid in relation to the time
scale of most PSS/E simulations, several PSS/E models, e.g. CDC4T, CDC6, CEELRI and
CMDWAS treat dc converter pairs as if they move instantaneously to their new operating
point when any of their input signals or ac feed voltages are changed.

62
These pseudo steady-state, HVDC dynamic models calculate the active and reactive power
loading of the HVDC converter using steady-state converter relationships similar to those
described in Section 3.3. However, it is one important difference; in the dynamic models the
transformer taps remain fixed. This means, as distinct from the power flow solutions, that the
converter transformer tap position does not attempt to hold the bridge firing angle within its
maximum and minimum values in dynamic simulations.

In the same manner as the ac network model is not concerned with the internal transient
behavior of transformers and three-phase transmission lines, the PSS/E dc models are not
concerned with the internal dynamic behavior of dc converters and lines.

The mode of operation where the rectifier firing angle is not at a limit and the inverter margin
angle is also not at a limit or controlling voltage, is not possible to directly represent with the
pseudo steady-state HVDC dynamic models. This is because this condition does not occur in
steady-state. This dynamic condition may occur during startup and/or a cycle or two
following a disturbance. If the recovery is slow (e.g. if the ac system is weak), then some
pseudo steady-state models may depress direct current and dc voltage during a disturbance,
and ramp up voltage and current at user specified rate following the disturbance.

Note; the model CDCVUP can represent the temporary dynamic condition when neither of
the converters are at a firing angle or a margin angle limit, and both are fighting for control of
current. However, this is not the case for the model used in this thesis.

Blocking and bypassing


If the inverter is bypassed, the dc side is shorted and the ac side is open. In this situation the
rectifier will continue to circulate a low level of direct current through the shorted inverter at a
low voltage. Hence, the rectifier will draw some vars but very little power from the ac system.
The inverter will draw no power of vars.

Blocking, or turning off a converter can be simulated by changing the appropriate ICON or by
raising the blocking parameter to force a block.

5.3 Converter control


This section describes the dynamic control system and operation of the converter model in
PSS/E. This section in mainly based on [15].

In PSS/E the dc transmission models are concerned with the transient behavior of the outer, or
supervisory, levels of the dc control. This is due to the fact that the handling of the dc power
flow by its control has a strong influence on the ac system.

In PSS/E there are three distinct types of actions by the control:

I. Normal regulation of dc converter operation to maintain constant power or constant


current with coordination of rectifier and inverter current setpoints.

63
II. Temporary overriding of dc converter normal operation setpoints as a result of ac
system voltage disturbances.
III. Modulations of the dc power setpoint by supplementary control devices. The
objective of this is e.g. to assist in the damping of rotor angle swings in the ac system.

The main focus in this thesis is the action by the control system during normal regulation and
temporary disturbances. Hence, a detailed description is given on (I) and (II). It is important
to acknowledge that the basic control system described in Section 3.3.3 underlies all dc
transmission operation. Hence, modeling of the normal regulating of the dc converters
includes the description given in the latter section. Various dc converter models represent
different normal regime manipulations of the different setpoints given in Figure 22 and Figure
23 (see Section 3.3.3).

However, if the ac or dc voltages at the converters (rectifier/inverter) reach abnormal levels


which may cause commutation difficulties, excessive currents, or unacceptable harmonics, the
normal control action is overridden by special control actions. These overriding actions are
activated when the positive sequence ac voltage or dc voltages at the converters reach
specified levels.

It is important to recognize that the actions executed by the model used in this thesis, CDC4T,
does not represent actions a real converter would take. However, it represents the user’s
decision to simulate the blocking, bypassing, unblocking or unbypassing of the converters
when various disturbances encounters.

Also, the dynamic converter model has access to all the data and variables used in the load
flow. If additional parameters and variables are needed, these are defined on individual model
data sheets.

5.3.1 Characteristics of normal operation


From Section 5.1.1 it can be seen that a new parameter, ALFDY, is included in the dynamic
data sheet. ALFDY is the dynamic firing angle. This parameter represents the fact that the
firing angle limits of the dc model generally have a wider range on a transient basis compared
to steady-state. This is illustrated in Figure 32.

64
Figure 32 Alpha and gamma ranges in load flow and dynamic simulations [15].

CDC4T will adjust rectifier and inverter firing delay angles within the dynamic limits to
operate the dc transmission in accordance with the characteristics given in Figure 22 and
Figure 23 (see Section 3.3.3). As explained in the previous section, the scheduled dc voltage
and dc current are specified in the load flow case (i.e. parameters VSHED, SETVAL and
MDC in Section 3.3.1).

Figure 33 shows the dc transmission control arrangement for the model used in this thesis.
From the figure it can be seen that the instantaneous current setpoint, Iset, is adjusted
continuously if the line is in constant power mode, i.e. MDC=1 (see Section 3.3.1). The
inverter current setpoint will follow the rectifier current setpoint to always provide the current
margin, DELTI. DELTI is explained and defined in Section 3.3.1.

Figure 33 dc transmission control arrangements [15].

65
Note; when changing the dc operation setpoints VSCHED, SETVAL and MDC this has to be
handled by the load flow working case.

If the rectifier firing delay angle reaches its dynamic lower limit during the simulations, the dc
current will fall below the instantaneous rectifier current setpoint but not below the inverter
current setpoint.

As mentioned earlier, the transformer taps will not be adjusted automatically during dynamic
simulations. Transformer taps must be changed manually via the load flow case.

5.3.2 Characteristics of operation during transients


The converters must have actions that protect the converters from commutation failure during
ac system disturbances. If an ac disturbance causes a commutation failure in the inverter it
results in one pair of diodes conducting permanently in the inverter bridge. The latter situation
is illustrated in Figure 34. The figure illustrates a situation where the commutation from valve
4 to valve 6 fails.

Figure 34 Commutation failure at inverter due to ac system disturbance [15].

The action made to extinguish the two conduction diodes is to bypass the inverter bridge as
illustrated in Figure 35. The figure shows that the bypass switch is closed to allow valves 1
and 4 to be extinguished.

Figure 35 Bypassing of the inverter due to commutation failure [15].

66
For the inverter to regain its normal operation condition the bypass switch is opened, see
Figure 36. Thus, the inverter operation is reestablished by starting valve 3 and 6 in proper
sequence after a suitable delay.

Figure 36 Unbypassing of the inverter [15].

The situation explained above constitute one of the two actions the converter model can take
during an ac system disturbance. CDC4T has two actions that the converter can take during
such ac system disturbances:

I. The rectifier and inverter are both shut down, i.e. blocked, if the ac voltage at the
rectifier falls below the per unit value, VBLOCK.
II. The inverter bypass switch is closed if the inverter end dc voltage falls below
VBYPAS. The rectifier will continue to maintain dc current at scheduled value.

When analyzing the control operation of the converter model in PSS/E it is essential to
understand both what causes blocking and bypassing of respectively rectifier and inverter, and
how the voltages and currents are reestablished following blocking and bypassing.

Note; low dc voltage does not cause blocking of the rectifier unless the rectifier ac voltage is
low. Also, low ac voltage at the inverter does not cause bypassing unless the inverter dc
voltage is low.

5.3.2.1 Reestablishment after blocking and bypassing


Figure 37 and Figure 38 are included to facilitate the understanding of how the voltage and
current are reestablished following a blocking or bypassing. The parameters shown in Figure
37 and Figure 38 can be found in Section 3.3.1 and Section 5.1.1.

If the rectifier is blocked, it remains blocked for a minimum of TBLOCK seconds. If the per
unit voltage at the ac bus rises to a value of VUNBL, the rectifier may restart. Figure 37
illustrates how the dc voltage and current instantaneous setpoints are reestablished following a
blocking of the rectifier.

67
Figure 37 Voltage and current reestablishment following blocking [15].

Figure 38 illustrates how the voltage and current instantaneous setpoints are reestablished
following a bypassing of the inverter. If the inverter is bypassed it remains bypassed for a
minimum of TBYPAS seconds. If the voltage at the ac bus rises to the per unit value VUNBY,
it may reestablish the dc voltage.

Figure 38 Voltage and current reestablishment following bypassing [15].

Figure 37 and Figure 38 illustrate that the voltage and current reestablishment are specified by
the parameters RSVOLT, RSCUR, VRAMP and CRAMP. These values are specified by the
user in the dynamic data sheet described in Section 5.1.1.

However, the current setpoints at both the rectifier and inverter are overridden at all times by
a voltage-dependant current limit (VDCL). The VDCL for CDC4T is shown in Figure 39. The
VDCL curve is defined by the three limit points (V1, C1), (V2, C2) and (V3, C3). These three
limit points are specified by the user in the dynamic data sheet for CDC4T.

68
If the VDCL comes into play during dc voltage or current reestablishment, it will force the dc
current to a value below the minimum current demand, C0.

Figure 39 Voltage-dependant current limit for CDC4T [15].

5.3.3 Special considerations


It is important to recognize the distinction between the static and dynamic minima of the
firing angle limits. CDC4T does not recognize the load flow firing angle limits ALFMIN and
GAMMIN defined in Section 3.3.1. This has no consequence as long as the load flow solution
is normal, i.e. neither alpha nor gamma is on its load flow limits, or when the dynamic limits
ALFDY and/or GAMDY are the same as the respective load flow limits ALFMIN and/or
GAMMIN.

However, the distinction between static and dynamic minima becomes a difficulty if the
initial condition load flow has alpha or gamma at its static minimum. In this situation ALFDY
and GAMDY will be different from the converted load flow solution which is the intended
initial condition. The difference may result in a non-steady initial condition.

One approach the user can implement to avoid this difficulty is to change ALFMIN and
GAMMIN to the dynamic limit values when a disturbance is applied. This is done by setting
ALFDY equal to ALFMIN and GAMDY equal to GAMMIN in all initial setups and initial
condition snapshots. When the disturbance is applied manually, change these values to the
actual dynamic values.

Note; in the initial power flow condition used in this thesis the alpha and gamma is not at their
static minimum. Consequently, the dynamic limits constitute no problem.

69
5.4 Generator modeling
The converters at Ormen Lange are operated to deliver active power to three synchronous
motors. These motors are implemented as synchronous generators in PSS/E. The generators
are connected to the inverter side of the converter, and are thus decoupled from the remaining
ac system. Since the main focus in the following simulations are the rectifier and the ac
system, this section only presents a brief description of the dynamic model used to represent
the synchronous motors. This section is manly based on [14, 15].

5.4.1 Model and parameters implemented in PSS/E


The generator model used in this thesis is a round rotor generator model, also referred to as
GENROU. This synchronous generator is operated as a motor in the simulations.

The parameters chosen for the generator model at Ormen Lange are based on standard
parameters used for generators with approximately the same size elsewhere in the system. The
parameters are based on the generator connected to bus (37256). This generator is almost of
the same size as the one implemented at Ormen Lange.

Table 9 shows the parameter values used for the generator model implemented in PSS/E. The
three synchronous machines at Ormen Lange are identical, thus only parameter values for one
of the three machines are presented.

Table 9 Parameters used for the generator model


Parameter IBUS Name I T’do T``do T’qo T``qo H
Chosen value 101 GENROU 1 3.00 0.05 1.50 0.05 2.8
Parameter Xd Xq X’d X’q X``d Xl S(1.0) S(1.2)
Chosen value 2.3 2.2 0.39 0.49 0.25 0.18 0.1089 0.37795

For a detailed parameter description, see the generator data sheet in [14].

5.4.2 Basis for chosen model


The synchronous machines at Ormen Lange are operated at a high speed. Hence, a
synchronous generator with round rotor is chosen to represent the motor at Ormen Lange.
Compared to salient pole machines, round rotor machines have the ability to withstand high
centrifugal forces, and are generally used for high speed synchronous machines.

PSS/E contains several standard generator models. Among these standard models there are
three models which represent synchronous generators with round rotor. These generator
models are GENROE, GENROU and GENDCO. Both GENROU and GENDCO assume the
saturation curve to be quadratic, while GENROE assumes the saturation curve to be
exponential. However, GENDCO includes dc offset effects and is intended for use only in
shaft torsional studies.

In this thesis the model GENROU is chosen in preference to GENROE only because
GENROU is used by Statnett to represent similar round rotor machines. Thus, no

70
considerations are made on the effect of using a model with a quadratic saturation curve
compared to a model with an exponential saturation curve. However, the latter procedure is
not adequate if detailed dynamic simulations on the performance of the synchronous machine
are to be performed. Since the dynamic effect of greatest importance in the machine is the
development of synchronizing and damping torques, it’s important to acknowledge which
factors influence both synchronizing and damping torque. Synchronizing and damping torque
are determined by the relative values of the synchronous, transient, and subtransient
reactances which again are influenced by the magnetic saturation. Hence, in these simulations
it is important to acknowledge and investigate the influence of magnetic saturation.

71
72
6 Dynamic simulations
This chapter contains dynamic analysis of the control actions for the converter model. The
objective of these analyses is to illustrate the performance of the converter model. These
analyses are a continuance of the corresponding simulations performed in Chapter 4.

This chapter uses the term converter model to refer to the dynamic two-terminal dc line model.

6.1 Introduction
In this chapter the following points are investigated:

I. Analysis of the control actions for the dynamic converter model under normal
regulation.
II. Analysis of the control actions for the dynamic converter model during temporary
overriding of the normal converter operation.

In this thesis three dynamic two-terminal dc line models (CDC4T) are implemented at
Nyhamna. All three models are identical. Hence, the results from the simulations will only be
given for one of the three implemented models. Figure 40 illustrates the system configuration
for which the results are presented.

Figure 40 Illustration of one of the three converters connected to Nyhamna.

73
6.2 Initial conditions and assumptions
This section presents the initial conditions and assumptions made for the dynamic simulations
presented in this chapter.

6.2.1 Power flow assumptions


The following power flow file is used in this chapter:
- Converter_model_cnv.sav

The following assumptions, which differ from the default setting provided in PSS/E, were
made when establishing the power flow file:

- Switched shunt adjustments locked.


- Constant MVA loads converted with the following real power distribution:
o 40 % constant current
o 40 % constant admittance
o 20 % constant power
- Constant MVA loads converted with the following reactive power distribution:
o 0 % constant current
o 100 % constant admittance
o 0 % constant power

The power flow file can be found in Appendix D.

6.2.2 Dynamic assumptions


The following dynamic file is used in this chapter:
- NN.dyr

The dynamic file can be found in Appendix D.

Before running the dynamic simulations, the dynamic initialization activity, STRT, is invoked.
This activity calculates the initial value of all variables as a function of the model’s constant
data and boundary condition at the bus in the working case at which it is referenced. Ideally,
the following message should be printed after the activity is executed: “INITIAL
CONDITIONS CHECK O.K.”. This message indicates that no nonzero STATEs are found.
The latter massage is not printed when executing the STRT activity in this chapter, however,
the following message appears: “SUSPECT INITAIAL CONDITIONS”. This message
usually indicates some error in setup. Due to time limitations and the focus in this thesis,
removing these suspect initial conditions has not been a priority [11].

74
However, it is important to acknowledge which situations may cause these suspect initial
conditions. Hence, following are three situations which may cause such conditions [11]:

I. Model variables initialized out of limits.


II. STATE variables characterized by high gain and a short time constant.
III. Improperly specified data (e.g., zero time constants where they are not allowed,
unrealistic limits etc.).

To minimize any possible influence from the suspect initial conditions, all simulations are run
for a period of 2 seconds before any disturbances are applied. The objective is to insure that
any non steady-state variables have reached a steady-state condition.

6.2.3 Initial values


The initial values for the dynamic simulations are given in Table 10. These data are obtained
by running dynamic simulation with “Converter_model_cnv.sav” and “NN.dyr”.

Table 10 Dynamic initial values.


DC converter data AC system data
Vdcr α Vdci γ Idc Vac,rec Pac(R) Qac(R) Vac,inv Pac(I) Qac(R)
[kV] [deg] [kV] [deg] [A] [pu] [pu] [pu] [pu] [pu] [pu]
17.2 11.4 16.9 16.2 2840.2 0.9767 0.0488 0.0106 1.0 -0.048 0.0145

The variables Pac(R), Qac(R), Pac(I) and Qac(I) are given in per unit of system base, i.e. 1000
MVA.

Table 11 contains a description of the variables used in Table 10. Some of the names used in
Table 11 are also illustrated in Figure 40.

Table 11 Description of variables.


Variable Description
Vdcr Rectifier dc voltage
α Rectifier firing delay angle
Vdci Inverter dc voltage
γ Inverter margin angle
Idc DC current
Vac,rec Bus voltage at ORMEN TRAFO
Pac(R) Rectifier ac real power
Qac(R) Rectifier ac reactive power
Vac,inv Bus voltage at ORMEN MOTOR
Pac(I) Inverter ac real power
Qac(R) Inverter ac reactive power

75
6.3 Application of the disturbance
This section presents the two cases which are analyzed in this chapter. Both cases represent a
three phase line fault. However, the fault impedance varies for each case. The cases studied
are given in the following table.

Table 12 Cases analyzed


Case Case explanation
D Branch fault on 130 kV line between Aura1(57013)-OSBU1(57403) with
fault impedance R=30, X=30. The fault is applied for 400 ms.
E Branch fault on 130 kV line between Aura1(57013)-OSBU1(57403) with
fault impedance R=2, X=2. The fault is applied for 400 ms.

The purpose of Case D is to introduce a fault which depresses the voltage at Nyhamna to an
extent that the control action of the converter remains in normal regulation. Hence, this case is
a means for analyzing the converter operation under normal regulation. The objective of Case
E is to introduce a fault which depresses the voltage at Nyhamna to an extent that temporary
overrides the control action under normal regulation. Hence, this case is a means for
analyzing the converter operation under abnormal regulation.

The fault impedance introduced does not necessarily represent a realistic impedance.
However, the different impedances act as an effective means to depress the bus voltage at
Nyhamna to a varying degree.

Note; the faults applied are three phase faults. The value of the fault admittance is calculated
based on the settings of the “Unit” toggle switch, the impedance input field and “Base kV”
input field in PSS/E. When the fault is executed the line shunt at the “from” bus end of the
designated branch is replaced with the per unit admittance equivalent to the value entered for
R and X [11].

The branch faults are applied for 400 ms after which the fault is removed. The duration of the
fault is based on information from [16].

6.4 Results and discussion


This section presents the simulation results for Case D and Case E. The discussion is given
consecutive as the results are presented to increase the readability.

The numerical values obtained from these simulations are of less importance and will not be
commented in detail. This is because neither the converter model nor the initial condition used,
do represent a realistic situation. Hence, this section will focus on the principal response
obtained from the simulations.

It is important to emphasize that the following evaluations are only valid for the assumptions
made in this chapter and parameter setting used in Chapter 5. Also, no verification with other
simulation programs is performed to assure that the pseudo steady-state model, CDC4T,

76
exhibits realistic dynamic behavior. The dynamic behavior can only be evaluated from the
expected behavior described in previous chapters.

Since this chapter analyzes the control actions for the dynamic converter model, the time
period during fault and right after fault is of greatest interest.

6.4.1 Case D
This case introduces a remote three-phase line fault at time t = 2.0 between AURA1 and
OSBU1 with a fault impedance equal to R=30 and X=30. This case will facilitate the
understanding of actions performed by the converter control when normal regulation of the dc
converter is performed to maintain specified setpoints. By introducing the latter fault
impedance, the impact of the remote line fault is limited, and a desired voltage depression is
obtained.

During fault, 2.0 < t < 2.4


The remote three-phase fault causes a voltage depression at the rectifier bus. Figure 41 shows
the response of the ac variables at the rectifier side. This figure shows that the rectifier bus
voltage is reduced from approximately 0.98 per unit to 0.94 per unit instantaneously when the
fault is applied.

Figure 41 Rectifier bus voltage [pu], ac real power [pu] and ac reactive power [pu] during fault. The
active and reactiv power are based on system base (1000 MVA).

In the pre fault situation, i.e. t < 2.0 seconds, the rectifier is controlling the dc current. When
the fault is applied at t = 2.0 seconds, the rectifier loses control of the current order and the
rectifier firing delay angle (alpha, α) is instantly reduced to its extreme minimum, alpha =

77
ALFDY = 5°. The latter is illustrated in Figure 42. ALFDY is a parameter specified by the
user in the dynamic data sheet, see Section 5.1.1. The consequence of an instant reduction in
alpha can be observed in Figure 41. The latter figure illustrates an analogues drop in the
rectifier reactive consumption in the fault period. This reduction in reactive power
consumption helps prevent further deterioration of the rectifier bus voltage.

Figure 42 Rectifier dc voltage [V], rectifier firing delay angle [degrees] and dc current [A] during fault.

The inverter has abandoned the control of the dc voltage and is now regulating the inverter
margin angle (gamma, γ) to control the dc current to a value which is the desired dc current
reduced by the current margin, DELTI=0.1, see Section 3.3.1. Consequently, the reduction in
dc current results in an analogous reduction in rectifier dc voltage shown in Figure 42. As a
direct consequence of the reduced dc current and voltage, the active power transmitted
through the rectifier is also reduced during fault. The latter is illustrated in Figure 41.

The inverter now continuously adjusts the inverter margin angle to maintain the specified dc
current. This can be seen by comparing the rate of change for the gamma curve, see Figure 43,
and the rectifier bus voltage curve, see Figure 41.

78
Figure 43 Inverter dc voltage [V] and gamma [degrees] during fault.

Figure 41 shows that the rectifier bus voltage curve consists of three time intervals within the
period the fault is applied. The first time interval is between t = 2.0 and t = 2.04, the second is
between t = 2.04 and t = 2.06 and the third interval is between t = 2.06 and t = 2.4. The same
time intervals can be found in the gamma curve in Figure 43. Comparing these to curves
within the same intervals it is clear that the rate of change is the same for both curves,
however, the change is in opposite direction. As the rectifier bus voltage is reduced in the first
time interval, gamma is increased. This result is evident since a reduction in the rectifier bus
voltage causes a reduction in the rectifier dc voltage. Hence, to maintain the scheduled dc
current, gamma is increased to reduce the inverter dc voltage. In the second time interval the
rectifier bus voltage is increased, i.e. the rectifier dc voltage increases. This results in a
reduction in gamma in order to maintain scheduled current. This situation continues till the
fault is removed at t = 2.4 seconds.

Since the depressed rectifier bus voltage causes the inverter to abandon voltage control and
assume current control, the increased inverter margin angle results in an increased reactive
consumption at the inverter. An illustration of the latter is omitted in this section, but can be
verified through simulations.

The fault is cleared, t > 2.4 second


As the fault is cleared, the rectifier regains control of the dc current. Both the rectifier dc
voltage and dc current are instantly reestablished to their pre fault values, see Figure 44. Since
the dc current and dc voltage is instantly reestablished to their pre-fault values, an identical
response is expected from the rectifier real power. The latter can be verified by studying
Figure 45.

79
Although the dc values and real power (see Figure 44 and Figure 45) are instantly
reestablished, this is not true for the rectifier ac reactive power and alpha. Figure 44 and
Figure 45 shows that alpha and the rectifier ac reactive power have the same development
after the fault is cleared. This is expected since the rectifier ac real power is constant after the
fault has been cleared.

The cause of the fluctuations in alpha and reactive power illustrated in Figure 44 and Figure
45, can be found by evaluating the rectifier bus voltage in the latter figure. Due to the small
deviance between pre fault and post fault bus voltage, the rectifier adjust α accordingly to
maintain scheduled dc current. Hence, rectifier bus voltage, reactive power and alpha exhibit
similar responses after the fault is removed.

As long as there are voltage fluctuations on the rectifier bus, even small fluctuations, both
alpha and reactive power will exhibit fluctuations. Due to these fluctuations in rectifier
reactive power consumption, the ac system will perceive the rectifier as a varying reactive
load.

Figure 44 Rectifier dc voltage [V], dc current [A] and rectifier firing delay angle [degrees] after the fault is
removed.

80
Figure 45 Rectifier bus voltage [pu], ac real power [pu] and ac reactive power [pu] after the fault is
removed. The active and reactive power are based on system base (1000 MVA).

6.4.2 Case E
This case introduces a remote three-phase line fault at time t = 2.0 between AURA1 and
OSBU1 with a fault impedance equal to R=2 and X=2. The purpose is to introduce a fault
which depresses the bus voltage at Ormen Lange to an extent that results in a shutdown (also
called blocking) of the converter bridges. This will facilitate the understanding of actions
performed by the converter control when the normal operation setpoints are temporary
overridden. Also, this case will illustrate the reestablishment of dc voltage and current
following a converter blocking.

During fault, 2.0 < t < 2.4


The fault introduced results in a substantial voltage depression at the rectifier bus. As a
consequence of this voltage depression, the real and reactive ac power at both rectifier and
inverter falls instantaneously to zero at t = 2.0. Thus, no power is transferred over the dc link.
This situation is illustrated for the rectifier in Figure 46. The corresponding response for the
inverter is illustrated in Figure B1 in Appendix B. Hence, the remote line fault results in a
converter blocking at t = 2.0 seconds.

81
Figure 46 Rectifier bus voltage [pu], rectifier ac real power [pu] and rectifier ac reactive power [pu]
during fault. The active and reactive power are based on system base (1000 MVA).

As the converter shutdown, the control system instantly increases alpha and gamma to 90°.
The latter is illustrated in Figure 47. This value for alpha is greater than the nominal
maximum rectifier firing angle (ALFMX) specified in the power flow data sheet (see Section
3.3.1) and is possible because ALFMX is no firm limit.

During the converter shutdown all dc variables are instantly reduced to zero, i.e. both rectifier
and inverter dc voltage and dc current are reduced to zero, see Figure 47 and Figure 48. This
is a consequence of alpha being increased to 90°. In a real converter, alpha = 90° causes the
negative cycle of the output voltage on the dc side of the rectifier to be equal to the positive
cycle. Consequently, the mean value of the output voltage on the dc side becomes zero, and
no energy is transferred from one side of the converter to the other [6].

82
Figure 47 Alpha [degrees], rectifier dc voltage [V] and dc current [A] during fault.

Figure 48 Gamma [degrees] and inverter dc voltage [V] during fault.

As stated in Section 5.3.2, the rectifier and inverter are both shutdown if the ac voltage at the
rectifier falls below the per unit value, VBLOCK. In Section 5.1.1 the parameter VBLOCK is
set to 0.6 per unit. The latter means that the converter will be shutdown if the ac rectifier
voltage falls below this value. However, by investigating Figure 46, one can see that the

83
rectifier bus voltage falls to 0.6 per unit at time t = 2.029. This means that at time t = 2.0,
when the converter is shutdown, the rectifier bus voltage is greater than 0.6 per unit. The
explanation for the latter situation can be found by investigating Figure 21 on page 39. The
rectifier bus voltage in Figure 46 is analogues to the “Primary bus” voltage in Figure 21.
However, the rectifier ac blocking voltage is measured at the secondary side of the converter
transformer and is denoted EacR. Thus, the rectifier bus voltage in Figure 46 is somewhat
greater that EacR and the blocking occur seemingly at a greater value than VBLOCK.

The fault is cleared, t > 2.4 second


As the fault is cleared, Figure 46 shows that the rectifier bus voltage rises instantaneously to a
value greater than VUNBL (the rectifier unblocking value), and thus, the converter is restarted.
To facilitate the understanding of the reestablishment of dc voltage and current following this
converter blocking, see Figure 49.

Figure 49 Reestablishment of rectifier dc voltage [V] and dc current [A] after the fault is cleared.

Figure 49 shows that the rectifier dc voltage and current at time t = 2.4 are 6 kV and 500 A,
respectively. These values are the minimum dc voltage and current following a converter
blocking, and correspond to the parameters RSVOLT and RSCUR defined in the dynamic
data sheet in Section 5.1.1. The latter also applies for the inverter reestablishment.

Figure 37 on page 68 illustrates the principal reestablishment of dc voltage and current


following a blocking. In this figure TBLOCK is the minimum time in seconds, the rectifier
remains blocked. However, since the duration of the line fault is greater than the value
specified for TBLOCK, the actual rectifier blocking time is determined by the duration of the
fault.

84
The reestablishment of dc voltage and current are generally determined by the parameters
RSVOLT, RSCUR, VRAMP and CRAMP defined in Section 5.1.1. From Figure 49 it can be
seen that the rectifier dc voltage follows the predetermined parameters RSVOLT and
VRAMP. However, the current setpoints at both the rectifier and the inverter are overridden
by the voltage-dependant current limit (VDCL). VDCL for the dc converter is illustrated in
Figure 39 on page 69. If the VDCL comes into play during the current reestablishment, it
forces the dc current to a value below the instantaneous setpoint.

The latter situation can be observed in Figure 49. This figure shows that the dc current
follows the parameters RSCUR and CRAMP till t = 2.44 seconds. However, in the period
2.44 < t < 2.49, the VDCL comes into play and holds the dc current at a constant value of
1000 A. This value corresponds to the predefined current limit point 1, i.e. C1, in Figure 39
on 69. The time period in which the VDCL is active, see Figure 49, is determined by the dc
voltage and current transducer time constant. The transducer constant is specified in the
dynamic data sheet in Section 5.1.1. A figurative illustration of the transducer time constant is
shown in Figure 33 on page 65. In this figure the time constants are denoted Tvdcs and Tidcs.

In order to obtain the current reestablishing profile illustrated in Figure 37 (on page 68), the
VDCL profile and reestablishing rate for both the voltage and current has to be coordinated.
It’s also feasible to increase C1, i.e. current limit point 1 on the VDCL profile, to e.g. 3000 A.
In the latter approach, the VDCL will not come into play, and the current reestablishing
profile is determined by the parameters RSCUR and CRAMP. This situation is illustrated in
Figure 50.

Figure 50 Reestablishment of rectifier dc voltage [V] and dc current [A] with the VDCL disabled.

85
Hence, the dc current reestablishment profile following a converter shutdown is dependent on
the VDCL setpoints in addition to the settings of the dc current recovery ramp rates. The
objective of “disabling” the VDCL, as illustrated in Figure 50, may be to maximize the
recovery rate while avoiding subsequent commutation failures [7].

Figure 51 and Figure 52 show that the rectifier firing delay angle (alpha), rectifier bus voltage
and the rectifier reactive power consumption fluctuates after the fault as been removed. These
fluctuations are similar to the fluctuations experienced in Case D. Also in Case E, the
fluctuations in alpha and reactive power are caused by variations in rectifier bus voltage. The
rectifier will continuously adjust alpha to maintain scheduled dc current, and the latter causes
the fluctuations experienced in Figure 52. However, the reactive power fluctuations are
substantially greater in Case E compared to Case D. This is elaborated further in Section 6.4.3.

Note, the rectifier real power shown in Figure 52 does not exhibit a fluctuating profile. This is
because the rectifier dc voltage and dc current reaches a constant value within 200 ms after
the fault has been removed. However, in a hypothetical situation with fluctuations in dc
current or dc voltage, fluctuations in active power would also be expected.

Figure 51 Rectifier firing delay angle [degrees]. The figure illustrates both the pre fault and post fault
situation.

86
Figure 52 Rectifier bus voltage [V], rectifier ac real power [pu] and rectifer ac reactive power [pu]. The
active and reactive power are based on system base (1000 MVA).

6.4.3 Case D versus Case E


This section illuminates an important aspect concerning the converters’ recovery from a
system disturbance. Comparing the post fault reactive power consumption of the rectifier in
Case D and Case E, see Figure 53 and Figure 54, it is clear that the reactive fluctuations are
substantially greater for Case E than for Case D. These will also cause fluctuations in the
rectifier ac bus voltage. Consequently, the rectifier bus voltage in Case E exhibits greater
voltage fluctuations than Case D. The latter can be verified by studying Figure B2 and Figure
B3 in Appendix B.

Variations in reactive consumption might hinder post fault ac voltage recovery. Also, since
voltage variations can be detrimental to the overall system stability, it is of great importance
to acknowledge which factors and parameter setting of the converter model that influences the
post fault reactive fluctuations [7].

87
Figure 53 Rectifier ac reactive power [pu] for Case D. The power is based on system base (1000 MVA).

Figure 54 Rectifier ac reactive power [pu] for Case E. The power is based on system base (1000 MVA).

88
To understand what causes greater reactive power fluctuations in Case E compared to Case D,
see Figure 55 and Figure 56. The latter figures illustrate the reestablishment of rectifier firing
delay angle for respectively Case D and Case E. From Figure 55 it is clear that alpha is
instantaneously raised to a value close to its pre fault value at time t = 2.4 seconds. In Figure
56, however, alpha is not instantaneously reduced to its pre fault value. At approximately 67
degrees, the reestablishment of alpha has a breaking point. This means that at time t = 2.4,
alpha is reduced from 90 degrees to 67 degrees. From this point, alpha is “ramped” down
and reaches a value close to its pre fault value at approximately t = 2.54 seconds.

Since the rectifier reactive consumption increases with increasing alpha, it is clear that the
reactive consumption during the reestablishment of alpha is greater for Case E than Case D.
Consequently, Case E exhibits greater reactive fluctuations than Case D.

Figure 55 Reestablishment of alpha [degrees] for Case D.

89
Figure 56 Reestablishment of alpha [degrees] for Case E.

The reestablishment of alpha in Case E, see Figure 56, is analogues to the reestablishment of
rectifier dc voltage and dc current following the converter shutdown, described in Section
6.4.2. The breaking point at α = 67° in Figure 56 is hence a consequence of the values chosen
for reestablishment parameters RSVOLT, RSCUR, VRAMP and CRAMP in Section 5.1.1.

It is also important to acknowledge that the VDCL function can play a significant role in
determining the recovery from faults. The VDCL limits the current order as a function of dc
voltage. Consequently, the VDCL can (if correctly defined) reduce the reactive power
demand during periods of depressed voltage, and thus, reduce reactive power fluctuations [3].

Hence, the user defined values for the parameters defining the reestablishment profile for the
dc voltage and dc current can result in substantial fluctuations in the rectifier reactive power
consumption, following a converter blocking.

6.5 General considerations


The results obtained from these cases have revealed an important characteristic of the CDC4T
model. After fault clearance, the rectifier bus exhibited small voltage fluctuations. The
rectifiers compensated these fluctuations by adjusting their rectifier firing delay angle
correspondingly. The latter resulted in fluctuations in rectifier reactive power consumption.
Consequently, the ac system perceives the CDC4T model as a fluctuating reactive load
following a fault clearance. The reactive power fluctuations were substantially greater for
Case E. This is because Case E resulted in a shutdown of the converters, and the rectifier
firing delay angle following this shutdown, is determined by the parameters defining the
reestablishment of dc current and voltage.

90
It is worth emphasizing that many of the figures in this chapter exhibit an instantaneous
response to changes in ac system voltage. This is due to the nature of the converter model
used in this thesis. As described in Chapter 5, the model utilized (CDC4T) is referred to as a
pseudo-steady state, dynamic HVDC model. This term is used because the model represents
dynamic conditions using relationships which are technically valid only for steady state
conditions. Also, the model does not include the L/R dynamics of the dc system and the high
frequency firing angle controller dynamics. Consequently, the responses are instantaneous
and evaluation of the high frequency control system is not feasible [15, 17].

91
92
7 Model evaluation
This chapter analyses the consequence of using a converter representation of Ormen Lange
instead of a traditional PQ representation. The objective is to determine whether the response
from the ac system differs when using the converter model instead of a PQ-model.

This chapter uses the term converter model to refer to the dynamic two-terminal dc line model.

7.1 Introduction
The basis for the simulations performed in this chapter is two power flow models. These two
models represent Ormen Lange in two distinct ways. One of the models represents Ormen
Lange as a PQ-model and the other model represent Ormen Lange as a dynamic two-terminal
dc line model (CDC4T), also referred as converter model.

An illustration of the two model configurations is shown in Figure 57 and Figure 58. Figure
57 shows how the PQ-model is established in PSS/E and Figure 58 shows an analogues
illustration of the converter model. The converter model used in this chapter is identical to the
model analyzed in Chapter 6.

The PQ-model corresponds to the model used in the preliminary study [9], however, with a
different initial loading. The initial loading of the PQ-model is chosen to correspond with the
initial loading of the converter model.

Figure 57 Ormen Lange with PQ representation. Figure 58 Ormen Lange with converter
representation.

It is important to emphasize that the objective of this chapter is not to evaluate or compare
stability problems associated with the PQ-model and converter model. The objective is
merely to investigate to what extent the implementation of a converter model (CDC4T) causes
different system responses, compared to the PQ-model.

93
7.2 Initial conditions and assumptions
This section presents the initial conditions and assumptions for the dynamic simulations
presented in this chapter.

Since this chapter analyzes the response from two different models, it is of great importance
to have two initial power flow situation that are identical, and hence, comparable. With two
different initial power flow situations, it is not feasible to determine whether a different
response is caused by a different load representation or by two different initial power flow
situations.

Thus, the two models analyzed in this chapter are implemented with approximately identical
initial conditions. This means that both the overall system generation/loading and the local
Ormen Lange conditions are identical in both models. This can be verified by studying the
excel files “Loads” and “Machines” given in Appendix D.

In the initial situation, the total active and reactive power drawn from Nyhamna is 206.4 MW
and 123.4 MVAr for both models. This initial condition does not correspond to the loading
used by Statnett in their representation of Ormen Lange. However, the latter will be of no
consequence for the following simulations.

7.2.1 Power flow assumptions


The following power flow files are used in this chapter:
I. Converter model: ”Converter_model_cnv.sav”
II. PQ-model: “P-Q load_cnv.sav”

The following assumptions, which differ from the default setting provided in PSS/E, were
made when establishing the power flow files:

- Switched shunt adjustments locked.


- Constant MVA loads converted with the following real power distribution:
o 40 % constant current
o 40 % constant admittance
o 20 % constant power
- Constant MVA loads converted with the following reactive power distribution:
o 0 % constant current
o 100 % constant admittance
o 0 % constant power

The power flow files can be found in Appendix D.

94
7.2.2 Dynamic assumptions
The following dynamic files are used in this chapter:
I. Converter model: “NN.dyr”
II. PQ-model: “P-Q load.dyr”

Before running the dynamic simulations, the dynamic initialization activity, STRT, is invoked.
After the latter activity is executed, numerous of suspect initial conditions are found. The
handling of these suspect initial conditions are described in Section 6.2, and will thus not be
repeated here.

As in previous dynamic simulations, all simulations are run for a period of 2 seconds before
any disturbances are applied. The objective is to insure that any non steady-state variables
have reached a steady-state condition.

The dynamic files can be found in Appendix D.

7.3 Application of the disturbances


This section presents the two cases which are analyzed in this chapter.

To analyze and compare the consequence of using different models to represent Ormen Lange,
it is necessary to introduce a system fault which changes the initial power flow situation. Two
system faults are implemented in this chapter. The first fault is the same fault as defined in
Table 12 on page 76.

Table 13 describes the cases studied in this chapter.

Table 13 Case definitions.


Case Case explanation
E Branch fault on 130 kV line between Aura1(57013)-OSBU1(57403) with
fault impedance R=2, X=2. The fault is applied for 400 ms.
F Bus fault on the 12 kV generator bus (57024) at Aura with fault
impedance R=0, X=0. The fault is applied for 200 ms.

The faults defined in Table 13 are not implemented to represent realistic fault scenarios.
However, the faults function merely as a means for depressing the bus voltage at Nyhamna to
a varying degree. This enables a principal evaluation of the system response when to different
model representations of Ormen Lange are utilized.

Note; the fault applied are three phase faults. The value of the fault admittance is calculated
based on the settings of the “Unit” toggle switch, the impedance input field and “Base kV”
input field in PSS/E. When the fault is executed the line shunt at the “from” bus end of the
designated branch is replaced with the per unit admittance equivalent to the value entered for
R and X [11].

95
7.4 Simulation results
This section presents the simulation results for Case E and Case F. The discussion is given
consecutive as the results are presented to increase the readability.

For each case, results are presented both locally at Nyhamna and at Viklandet. Viklandet is
included because it constitutes a central junction point for power delivery to Nyhamna.

The following responses are presented in the subsequent sections:


- Bus voltage
- Bus phase angle
- Frequency deviation
- Active and reactive power flow

All simulation results are first presented for the PQ-model followed by the corresponding
result for the converter model. This presentation is chosen to facilitate the evaluation of the
two model responses.

It is important to emphasize that the following discussion will focus on the distinction in
system response from the PQ-model and the converter model. This means that responses from
a given model will be evaluated in context with the response from the other model.

Since the performance of the converter model is discussed in detail in Chapter 6, this section
will not repeat the same arguments to substantiate the results obtained in this section. Hence,
the reader may refer to Chapter 6 to facilitate the understanding of the converter responses
obtained in this section.

Also, it’s important to emphasize that the evaluations made in this section are only valid for
the assumptions made introductorily.

7.4.1 Results from Case E


This section presents the simulation results at Nyhamna and Viklandet, respectively.

96
7.4.1.1 Response at Nyhamna

Figure 59 Bus voltage [pu] and bus phase angle [degrees] at Nyhamna with PQ representation of Ormen
Lange.

Figure 60 Bus voltage [pu] and bus phase angle [degrees] at Nyhamna with converter representation of
Ormen Lange.

97
Figure 61 Frequency deviation [pu] at Nyhamna with PQ representation of Ormen Lange.

Figure 62 Frequency deviation [pu] at Nyhamna with converter representation of Ormen Lange.

98
Figure 63 Active and reactive power between Nyhamna and DUM-TRAN with PQ representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

Figure 64 Active and reactive power between Nyhamna and DUM-TRAN with converter representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

99
Comparison of the response at Nyhamna
Figure 59 and Figure 60 shows that the voltage profile at Nyhamna following the disturbance
is approximately identical for the PQ-model and the converter model. The phase angle at
Nyhamna also exhibits similar profiles when using the converter model and the PQ-model.
The latter especially applies for t > 3.0 seconds. However, in the time period 2.0 < t < 3.0, the
curves differs to some extent. The PQ-model causes the phase angle at Nyhamna to drop
instantaneously to a lower value than the converter model, as the fault is applied. Since the
fault results in converter shutdown, and hence, a great reduction in the active power
consumption, the angle reduction will be greater for the PQ-model (the PQ-model maintains
active power consumption during the fault).

Figure 61 and Figure 62 illustrate the frequency deviation at Nyhamna. Except for minor
fluctuations in the curve representing the converter model, both models exhibit the same
profile. Since momentary change in system frequency is unphysical, the latter fluctuation
could be a result of numeric calculations in PSS/E. By reducing the time step of the
simulation parameter, these fluctuations are reduced.

The active and reactive power between Nyhamna and DUM-TRAN (the configuration is
illustrated in Figure 58) are illustrated in Figure 63 and Figure 64. By comparing the latter
figures, it becomes clear that the power going into Nyhamna differs when using the PQ-model
and when using the converter model. The active power flow between Nyhamna and DUM-
TRAN are approximately equal for the period t > 2.4 seconds. At this point the fault is
removed, and the post fault power flow is close to its pre fault power flow. However, in the
period where the fault is applied, i.e. 2.0 < t < 2.4, the active power flow with the converter
model is reduced to a greater extent than with the PQ- model. This is a consequence of the
converter shutdown. During shutdown, no active power is transferred over the dc link and the
only active power consumed at Ormen Lange is due to the small amount of PQ loads
representing the auxiliary equipment, see Figure 58.

The reactive power flowing between Nyhamna and DUM-TRAN with the converter model,
see Figure 64, differs greatly from the reactive flow in the PQ-model, see Figure 63. By first
evaluating the period 2.0 < t < 2.4 where the fault is applied, Figure 64 shows that the
reactive power flow changes direction. This means that during the fault period, reactive power
is being “supplied” from Nyhamna into the ac system. Since the converter shutdown causes a
reduction in rectifier reactive consumption, a reactive power surplus emerges. This surplus
emerges because reactive output from the capacitors connected to Nyhamna (see Figure 58)
exceeds the reactive power demand at Ormen Lange. The latter is only true for the converter
model. With the PQ-model the reduction in reactive consumption is not sufficient to cause a
reactive power surplus. Hence, reactive power is flowing into Nyhamna.

After the fault is removed, i.e. t > 2.4, the converter model in Figure 64 exhibits large
fluctuations in the reactive power flow between Nyhamna and DUM-TRAN. Figure 64 shows
that the reactive power fluctuations are diminished as time approaches 15 seconds. However,
the fluctuations are not reduced entirely and exhibit an amplitude of approximately 2 MVAr
as time approaches 15 seconds. Considering the fact that the pre fault reactive power flow in
the line is approximately 2.6 MVAr, these fluctuations can be considered substantial.

100
Evaluating the reactive power flow with the PQ-model in Figure 63, it becomes clear that
reactive fluctuations are non-existent compared to the converter model. In the latter figure the
post fault value reaches the pre fault value shortly after the fault is removed.

To facilitate the understanding of the cause of the reactive power fluctuations with the
converter model, see Figure 65. This figure shows both rectifier firing delay angle and the
reactive power flow between Nyhamna and DUM-TRAN. As stated in previous chapters, the
rectifier reactive power consumption varies with the rectifier firing delay angle (alpha). An
increased alpha results in increased rectifier reactive consumption. The latter can be
confirmed by analyzing Figure 65. The peaks in the reactive power correspond to the peaks in
alpha, i.e. the fluctuations are in step.

Note, the reason the reactive power seemingly is reduced when alpha is increased, is because
the reactive power flow is defined negative when going into Nyhamna. Hence, the curves
fluctuate in anti-phase.

Figure 65 Rectifier firing delay angle [degrees] and reactive power flow [MVAr] between Nyhamna and
DUM-TRAN with converter representation of Ormen Lange.

The results in this section illuminate an important characteristic of the converter model. As
apposed to the PQ-model, the ac system will perceive the converter model as a fluctuating
reactive load. The latter results in the reactive power fluctuations illustrated in the previous
figures. As long as there are fluctuations in alpha, the reactive power fluctuations will persist.
Since the cause of the converters’ reactive fluctuations has been discussed in detail in the
previous chapter, it will not be repeated here.

101
7.4.1.2 Response at Viklandet

Figure 66 Bus voltage [pu] and bus phase angle [degrees] at Viklandet with PQ representation of Ormen
Lange.

Figure 67 Bus voltage [pu] and bus phase angle [degrees] at Viklandet with converter representation of
Ormen Lange.

102
Figure 68 Frequency deviation [pu] at Viklandet with PQ representation of Ormen Lange.

Figure 69 Frequency deviation [pu] at Viklandet with converter representation of Ormen Lange.

103
Figure 70 Active and reactive power between Viklandet and Trollhei with PQ representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

Figure 71 Active and reactive power between Viklandet-Trollhei with converter representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

104
Figure 72 Active and reactive power between Viklandet-Aura4 with PQ representation of Ormen Lange.
The units are [MW] and [MVAr] respectively.

Figure 73 Active and reactive power between Viklandet-Aura4 with converter representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

105
Figure 74 Active and reactive power between Viklandet-NyeFrena with PQ representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

Figure 75 Active and reactive power between Viklandet-NyeFrena with converter representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

106
Comparison of the response at Viklandet
Figure 66 to Figure 69 demonstrates how the bus voltage, bus phase angle and bus frequency
deviation varies with time for both the PQ-model and the converter model. When comparing
the response from these two models it becomes clear that the power system exhibits
approximately the same response whether Ormen Lange is represented as a PQ-model or as a
converter model. The only response which differs slightly when using a converter
representation is the frequency deviation at Viklandet, see Figure 68 and Figure 69. The latter
figures show that the frequency curve is “smoother” with a PQ- model. The frequency curve
for the converter model has the same fundamental shape, however, the curve exhibits small
irregularities analogous to the irregularities experienced at Nyhamna. Since momentary
change in system frequency is unphysical, the latter fluctuation could be a result of numeric
calculations in PSS/E. By reducing the time step of the simulation parameter, these
fluctuations are reduced.

Figure 70 to Figure 75 illustrate the active and reactive power flow in three 400 kV lines
going into Viklandet. The power flow in each line is shown for both the PQ-model and the
converter model. The line between Viklandet-Trollhei is initially transmitting the greatest
amount of active power into Viklandet. The active and reactive power flow in the latter line is
illustrated in Figure 70 and Figure 71. By comparing the reactive power flow in the PQ-model
and converter model, it becomes clear that the converter model exhibits substantial
fluctuations in the reactive power flow. The amplitude of these fluctuations are approximately
40 MVAr and can not be found in the PQ-model. Hence, similar reactive power fluctuations
found in the line between Nyhamn and DUM-TRAN are now reveled in the line between
Viklandet-Trollhei. This result is expected since the line between Viklandet and Trollhei
delivers a substantial amount of power to Ormen Lange. As previous stated, also these
reactive fluctuations are a result of the varying rectifier firing delay angle, and consequently,
the varying reactive consumption of the rectifiers at Ormen Lange.

When analyzing the active power flow between Viklandet and Trollhei in Figure 70 and
Figure 71, fluctuations with the converter model can be observed. These fluctuations are a
result of the relatively large reactive power fluctuations. When the reactive power flow
increases, this causes increased losses and reduction in bus voltages. Consequently, active
power fluctuations are experienced in the same transmission line.

Also the line between Viklandet-Aura4, see Figure 72 and Figure 73, contain reactive power
fluctuations with the converter model. Due to less initial loading, the amplitude of the latter
fluctuations are smaller than for Viklandet-Trollhei.

When analyzing the power flow between Viklandet-NyeFrena in Figure 74 and Figure 75, it
becomes clear that both the active and reactive power differs in the period when the fault is
applied. Due to shutdown of the converters, the drop in active power transfer is greater for the
converter model than for the PQ-model. The shutdown also results in a greater deflection in
reactive power during the fault period, i.e. 2.0 < t < 2.4, for the PQ- model. The period after
the fault is removed, the converter model exhibits greater reactive power fluctuations than the
PQ-model. As described earlier, these fluctuations are a direct consequence of the fluctuations
in rectifier firing delay angle, illustrated in Figure 65.

107
7.4.2 Results from Case F
This section presents the simulation results at Nyhamna and Viklandet, respectively.

7.4.2.1 Response at Nyhamna

Figure 76 Bus voltage [pu] and bus phase angle [degrees] at Nyhamna with PQ representation of Ormen
Lange.

Figure 77 Bus voltage [pu] and bus phase angle [degrees] at Nyhamna with converter representation of
Ormen Lange.

108
Figure 78 Frequency deviation [pu] at Nyhamna with PQ representation of Ormen Lange.

Figure 79 Frequency deviation [pu] at Nyhamna with converter representation of Ormen Lange.

109
Figure 80 Active and reactive power between Nyhamna and DUM-TRAN with PQ representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

Figure 81 Active and reactive power between Nyhamna and DUM-TRAN with converter representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

110
Comparison of the response at Nyhamna
Case F, apposed to Case E, does not cause sufficient voltage depression at Nyhamna to result
in a shutdown of the converters. However, the fault introduced in Case F forces the rectifiers
to lose control of the dc current. As the fault is removed, the rectifiers regain control of the dc
current.

The results given in Figure 76 and Figure 77 illustrate that the bus voltage and bus phase
angle at Nyhamna exhibits approximately identical responses with the PQ-model and with the
converter model. This is analogue to the corresponding response in Case E. However,
apposed to Case E, the phase angle at Nyhamna also exhibits the same profile during fault in
both PQ-model and converter model. This is because the converters do not shutdown in Case
F. Hence, the active power consumption at Ormen Lange is not reduced to the same extent as
in Case E. Consequently, Figure 76 and Figure 77 have similar phase angle profiles, also
during the fault period.

As in Case E, the frequency deviation at Nyhamna is similar for the PQ- model and the
converter model. The latter can be seen in Figure 78 and Figure 79. Note, in Case F both
models exhibit irregularities in the frequency deviation curve. This implies that the
irregularities in not a result of the converter model, but rather a result of numeric calculations
in PSS/E.

Figure 80 and Figure 81 illustrate the active and reactive power between Nyhamna and DUM-
TRAN for the PQ-model and the converter model, respectively. By first evaluating the active
power flow in the latter two models, it becomes clear that the power exhibits similar profiles
for both models. However, the amplitude of the “fault-peak” is somewhat larger in the
converter model. This is a direct result of the rectifier’s loss of current control during the fault.
Hence, the reduction in dc current causes a reduction in transferred power through the dc link.

As in Case E, the reactive power flowing between Nyhamna and DUM-TRAN differs greatly
when using the PQ-model and the converter model, see Figure 80 and Figure 81. By first
evaluating the period 2.0 < t < 2.2 when the fault is applied, Figure 81 shows that the reactive
power flow changes direction. Reactive power is now being delivered from Ormen Lange to
the ac system. This is analogue to the situation that occurred in Case E. As the rectifiers loses
control of the dc current, the rectifier firing delay angle is reduced to its minimum, and
consequently, the reactive consumption of the rectifiers are reduced. This causes a reactive
power surplus at Nyhamna, which explains the change in power flow direction. Evidently, the
latter is only valid for the converter model.

After fault clearance, i.e. t > 2.2 seconds, the converter model in Figure 81 exhibits large
fluctuations in reactive power flow between Nyhamna and DUM-TRAN. Similar fluctuations
are not experienced with the PQ-model, see Figure 80. The amplitude of the fluctuations are
relatively large compared to the pre fault power flow.

As in Case E, the understanding of these reactive fluctuations can be facilitated through


Figure 82. The figure shows the rectifier firing delay angle (alpha) and the reactive power
between Nyhamna and DUM-TRAN. Also in this case, the fluctuations in reactive power

111
flow correspond to the fluctuations in alpha. The greatest deflections in alpha can be observed
in the period 2.0 < t < 3.4, which corresponds to the period where the reactive fluctuations are
greatest. A reduction in alpha causes a reduction in reactive power consumption. This can be
verified by studying Figure 82 in the time period 2.0 < t < 2.2.

Figure 82 Rectifier firing delay angle [degrees] and reactive power [MVAr] between Nyhamna and DUM-
TRAN with the converter model.

112
7.4.2.2 Response at Viklandet

Figure 83 Bus voltage [pu] and bus phase angle [degrees] at Viklandet with PQ representation of Ormen
Lange.

Figure 84 Bus voltage [pu] and bus phase angle [degrees] at Viklandet with converter representation of
Ormen Lange.

113
Figure 85 Frequency deviation [pu] at Viklandet with PQ representation of Ormen Lange.

Figure 86 Frequency deviation [pu] at Viklandet with converter representation of Ormen Lange.

114
Figure 87 Active and reactive power between Viklandet and Trollhei with PQ representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

Figure 88 Active and reactive power between Viklandet and Trollhei with converter representaion of
Ormen Lange. The units are [MW] and [MVAr] respectively.

115
Figure 89 Active and reactive power between Viklandet and Aura4 with PQ representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

Figure 90 Active and reactive power between Viklandet and Aura4 with converter representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

116
Figure 91 Active and reactive power between Viklandet and NyeFrena with PQ representation of Ormen
Lange. The units are [MW] and [MVAr] respectively.

Figure 92 Active and reactive power between Viklandet and NyeFrena with converter representation of
Ormen Lange. The units are [MW] and [MVAr] respectively.

117
Comparison of the response at Viklandet
Figure 83 to Figure 86 illustrate how the bus voltage, phase voltage and bus frequency
deviation varies with time for the PQ-model and the converter model at Viklandet. By
evaluating the response from these models, it becomes clear that the power system exhibits
approximately the same response whether a PQ-model or a converter model is utilized.

Figure 87 to Figure 92 illustrate the active and reactive power flow in three 400 kV lines
going into Viklandet. The power flow in each line is shown for the PQ-model and the
converter model. The line between Viklandet and Trollhei is initially transmitting the greatest
amount of power into Viklandet. The active and reactive power flow in the latter line is shown
in Figure 87 and Figure 88. These figures show that the PQ-model and the converter model
exhibit similar behavior after the fault is applied and cleared. Both the PQ-model and
converter model contains power fluctuations after fault clearance. The latter is especially true
for the reactive power flow. However, it is worth noticing that the fluctuations in reactive
power for the converter model, see Figure 88, corresponds in time with the fluctuations
between Nyhamna and DUM-TRAN, see Figure 81.

Also the line between Viklandet-Aura4 exhibits the same principal behavior as described for
Vikland-Trollhei, see Figure 89 and Figure 90. Hence, the PQ-model and the converter model
exhibit similar behavior. Both models have fluctuations in reactive power, however, at
different point in time.

The active and reactive power between Viklandet-NyeFrena differs when using the converter
model, see Figure 91 and Figure 92. This is analogue to the situation described in Case E.
Even though Case F does not cause shutdown for the converters, the rectifiers loss of current
control causes similar response as in Case E. The reactive fluctuations in Figure 92 are also a
consequence of the rectifier firing delay angle illustrated in Figure 82.

7.5 General Considerations


The previous sections have analyzed the principal system response when a PQ-model and
converter model is used to represent Ormen Lange. The results obtained from these analyses
have shown that the main difference between these two models is the generation of reactive
power fluctuations. As far as the ac system is concerned, the converter model is perceived as a
varying reactive load, which again causes the reactive fluctuations exhibited in the previous
sections. To illuminate why the response from the converter model only differs from the PQ-
model in terms of reactive fluctuations, consider the subsequent sections.

The strength of ac/dc junction at Nyhamna


In Section 2.6 the term short circuit ratio (SCR) was introduced as a fundamental indication of
the strength of the ac/dc connection. The latter section also presented a classification of the
strength based on the numerical value of SCR, with the problems associated with a weak
ac/dc connection. The reader may refer to Section 2.6 for a detailed description.

In order to obtain an indication of the strength of the ac/dc connection at Nyhamna, Appendix
C contains a simplified calculation of the short circuit capacity and SCR at Nyhamna. These

118
calculations are simplified and only intended to give an indication of the ac/dc strength. With
reference to Appendix C, the SCR was calculated to be 11.15. According to Section 2.6, a
system with SCR=11.15 is characterized as strong.

The results from the SCR calculation cannot, and will not, be solely used as an explanation
for why the ac system exhibits similar response whether a PQ-model or a converter model are
utilized. At best, this SCR evaluation can be used to substantiate the results obtained in this
chapter.

The complexity of the converter model used in PSS/E


The dynamic converter model used in this thesis is called CDC4T. As described in Chapter 5
and Section 6.5, CDC4T is based upon pseudo-steady state relationships. This means that the
model represents dynamic conditions using relationships which are technically valid only for
steady-state conditions. Also, the model does not represent the L/R dynamics of the dc line
and smoothing reactors as well as the high frequency firing angel controller dynamics. Strictly
speaking, this means that the only dynamic behavior the model exhibits is a varying active
and reactive power loading [15, 17].

In order to obtain a more dynamic behavior from the converter model implemented in PSS/E,
one possibility is to use the dc line model CDCRL. This model includes the L/R dynamics of
the dc system and high-speed controller dynamics, and will thus influence the ac system to a
greater extent than CDC4T. However, this is not investigated in this thesis. [15].

119
120
8 Conclusion
This chapter includes the main conclusions which can be drawn from the results presented in
this thesis. Also, a recommendation for further work is included at the end of this chapter.

8.1 Background
This thesis was initiated to establish and evaluate an alternative model representation of the
facility at Ormen Lange. Traditionally, a PQ-model has been used to represent Ormen Lange.
This thesis, however, has implemented three two-terminal dc line models (converter models)
to represent the facility. The main results from the power flow and dynamic simulations are
presented in the subsequent sections.

8.2 Power flow


Two cases were studied to simulate the action of the converter control system when exposed
to a depression in rectifier bus voltage. In the first case the rectifier transformer tap settings
were adjustable. In the second case the rectifier transformer tap setting were locked to its
initial value. The latter case represents a transient situation where the tap changer action is too
slow and hence not considered.

The results from the first case showed that a depression in rectifier bus voltage caused the
control logic to reduce the rectifier transformer tap position and firing delay angle. This
increased the voltage on the valve side of the rectifier transformer and enabled the rectifier to
maintain dc current control. Consequently, the scheduled dc values were unaffected by the
depression in rectifier bus voltage.

The results from the second case showed that with the rectifier tap setting locked, the
transformer did not boost the voltage on the valve side of the rectifier transformer.
Consequently, the control logic reduced the rectifier firing delay angle to its minimum, and
the inverter assumed control of the dc current. With the inverter in control of the current, the
scheduled dc current was reduced by a fraction equal to the current margin along with the
remainder dc values.

Hence, the presence of an adequate rectifier transformer tap setting is essential for the two-
terminal dc line model to maintain scheduled dc values during voltage depression.

All simulations showed that a voltage depression at the rectifier bus lead to a reduction in
rectifier reactive power consumption. This is due to the action from the control logic which
reduced the rectifier firing delay angle to “counteract” the voltage depression. The greatest
reduction in reactive power was experienced when the rectifier firing delay angle was reduced
to its minimum value.

121
Hence in a situation with depressed bus voltage, the latter operation of the converter control
logic causes the two-terminal dc line model to exhibit less stress to the ac system than the PQ-
model, in terms of reactive power consumption.

In power flow simulations, the inverter bus must be defined as a swing bus. This means that
the generator connected to the swing bus will adjust its power output to maintain a specified
bus voltage and phase angle. Hence, a voltage depression at the valve side of the inverter
transformer will never take place and there will be no tap adjustment on the inverter
transformer. The inverter is decoupled from the remaining ac system and all changes in
operation condition for the inverter is handled by the swing bus.

8.3 Dynamic
The results from the dynamic simulations showed that the dynamic two-terminal dc line
model (CDC4T) exhibited an instantaneous response to changes in rectifier ac system voltage.
This is because CDC4T is a pseudo steady-state dynamic model which does not include the
L/R dynamics of the dc system and the high frequency firing angle controller dynamics.
Consequently, evaluation of the high frequency controller action is not feasible.

Two cases were utilized to simulate the control action of the CDC4T model. The first case
introduced a fault which depressed the rectifier bus voltage to an extent that the control action
remained in normal regulation. The second case introduced a fault which depressed the
rectifier bus voltage to an extent that caused shutdown of the converters.

The results obtained from these simulations revealed an important characteristic of the
CDC4T model. After fault clearance, the rectifier bus voltage exhibited small voltage
fluctuations. The rectifiers compensated these fluctuations by adjusting their rectifier firing
delay angles correspondingly. Consequently, the latter resulted in fluctuations in rectifier
reactive power consumption. This means that the ac system will perceive the CDC4T model
as a varying reactive load following fault clearance.

The reactive power fluctuations were substantially greater for the case representing shutdown
of the converters. This is because the rectifier firing delay angle following the converter
shutdown, is determined by the parameters defining the reestablishment of dc voltage and dc
current. Hence, the user defined values for the latter parameters can result in substantial
reactive power fluctuations from the rectifiers, and must be evaluated carefully. However, it is
important to acknowledge that the voltage dependant current limit (VDCL) can, if correctly
defined, reduce the reactive power demand during periods of depressed voltage, and thus,
reduce the reactive power fluctuations.

The consequence of representing Ormen Lange with the dynamic CDC4T model was
analyzed by comparing the ac system response when using the CDC4T model and when using
the PQ-model. The results obtained from these analyses showed that the main difference
between the latter two models was CDC4T’s generation of reactive power fluctuations in the
transmission line into Nyhamna and Viklandet. These fluctuations were substantial compared

122
to the initial loading of the transmission line, and are a direct consequence of fluctuations in
rectifier firing delay angle.

Two arguments were presented to substantiate why the repose from the CDC4T model only
differed from the PQ-model in terms of reactive power fluctuations.

I. The calculated value of the short circuit ratio at Nyhamna indicated a strong
interconnected ac/dc system.
II. The dynamic behavior of the pseudo-steady state model, CDC4T, is limited. Both the
L/R dynamic of the dc line, smoothing reactors and high frequency controller
dynamics are omitted.

To obtain a more dynamic behavior from the model implemented in PSS/E, one could use the
more complex dc line model CDCRL. This model includes the L/R dynamics of the dc system
and high-speed controller dynamics, and will thus influence the ac system to a greater extent
than CDC4T.

8.4 Further work


This thesis has established and evaluated the implementation of the dynamic two-terminal dc
line model, CDC4T. CDC4T is a pseudo steady-state dynamic model which represents
dynamic relationships which are technically valid only for steady-state conditions. This means
that the dynamic behavior of the model is limited.

In further studies of the implementation of converter models at Ormen Lange, models that
offer more dynamic behavior should be utilized. The models should represent both the L/R
dynamic of the dc system and the high frequency firing angle controller dynamics. Further,
the model establishment should focus on achieving a sufficiently realistic load representation
of Ormen Lange. In this manner, the converters’ influence on system stability can be
investigated.

123
124
References

[1] K. R. Padiyar, HVDC Power Transmission Systems – Technology and System


Interactions, John Wiley & Sons., 1990.

[2] J. Arrillaga, High Voltage Direct Current Transmission, IEE Power Engineering
Series 6, Peter Peregrinus Ltd., 1983.

[3] P. Kundur, Power System Stability and Control, McGraw-Hill, New York, 1994.

[4] J. O. Gjerde, K. Uhlen, M. Hernes, ”HVDC-FACTS State of the art – power system
harmonics”, Sintef, 1996.

[5] W. Long, S. Nilsson, HVDC Transmission: Yesterday and Today, IEEE power &
energy magazine, Volume 5, Number 2, March/April 2007.

[6] I. Norheim, Suggested Methods for Preventing Core Saturation Instability in HVDC
Transmission Systems. Doctoral dissertation, Norwegian University of Science and
Technology, 2002.

[7] IEEE Std 1204-1997, “IEEE Guide for Planning DC Links Terminating at AC
Locations Having Low Short-Circuit Capacities”. (Result of CIGRÈ Working Group
14.07 and IEEE Working Group 15.05.05).

[8] R. S. Thallam, “Review of the Design and Performance Features of HVDC Systems
Connected to Low Short Circuit Ratio AC Systems”, IEEE Trans., Volume 7, No. 4,
October 1992.

[9] T. Skånøy, “Voltage instability – Impact of load modelling”, Norwegian University of


Science and Technology, 2006.

[10] Power Technologies International, PSS/E 30.2, “Users Manual”, November 2005.

[11] Power Technologies International, PSS/E 30.2, “Program Operation Manual”, Volume
I, November 2005.

[12] D. A. Woodford, “HVDC Transmission”, Manitoba HVDC Research Center, Canada,


Mach 1998.

[13] Power Technologies International, PSS/E 30.2, “Program Application Guide”,


Volume I, November 2005.

[14] Power Technologies International, PSS/E 30.2, “Program Operation Manual”, Volume
II, November 2005.

125
[15] Power Technologies International, PSS/E 30.2, “Program Application Guide”,
Volume II, November 2005.

[16] Statnett. “Veiledende krav til vern i regionalnettet (KtVr)”, Statnett SF


Nettstyringsdivisjonen Avdeling Vern og Feilanalyse, 2006. (Written in Norwegian).

[17] B. K. Johnson, ”HVDC models used in stability studies”, IEEE Trans., Volume 4, No.
4, April 1989.

[18] H. H. Faanes, K. J. Olsen, “TET4115 Elektriske Kraftsystemer”, Institutt for


elkraftteknikk, NTNU, 2005. (Written in Norwegian).

126
Appendix index

Appendix A Power flow simulations

Appendix B Dynamic simulations

Appendix C Calculations of the SCR at Nyhamna

I
II
Appendix A Power flow simulations
This appendix shows the results obtained from the power flow simulations in Chapter 4.
These results are identical to the results presented in Chapter 4, however, the results are
illustrated with single line diagrams.

Figure A1 Single line diagram for case A1.

III
Figure A2 Single line diagram for Case B1.

Figure A3 Single line diagram for Case A2.

IV
Figure A4 Single line diagram for Case B2.

V
VI
Appendix B Dynamic simulations
This appendix presents some of the results obtained from the simulations performed in
Chapter 6.

Figure B1 Inverter ac real power [pu] and inverter ac reactive power [pu] during fault. The active and
reactive power are based on system base (1000 MVA).

VII
Figure B2 Rectifier bus voltage [pu] for Case E.

Figure B3 Rectifier bus voltage [pu] for Case D.

VIII
Appendix C Calculation of the SCR at Nyhamna
This section describes how the short circuit capacity (SCC) and the short circuit ratio (SCR)
at Nyhamna are calculated in PSS/E. The calculations are simplified and do not represent a
correct value of the SCC or SCR. However, the objective of these calculations is to give an
indication of the strength of the ac/dc junction at Nyhamna.

Configuration implemented in PSS/E


This section describes the configuration used in PSS/E when calculating the SCC. Figure C1
shows a schematic illustration of the configuration used in PSS/E. The figure only shows one
of the three converters at Nyhamna.

A dummy bus is connected to the 130 kV bus at Nyhamna through a zero impedance
transmission line. A three-phase bus fault with zero fault impedance is implemented at the
dummy bus to calculate the short circuit current.

Figure C1 Configuration used in PSS/E for calculating the SCC at Nyhamna.

The following events are implemented:

t=0 Simulations start

t = 1.0 sec. Three-phase bus fault with zero impedance fault at the dummy bus

t = 2.0 sec. End of simulations

Since the current cannot be obtained directly in PSS/E, the MVA flow is plotted along with
the bus voltage at both Nyhamna and the dummy bus. The latter values are then implemented
in a excel sheet where the short circuit current is calculated from the following equations [18]:

IX
S N , MVA = 1000 MVA (C.1)

U N , Nyhamna = 130kV (C.2)

S N , MVA 1000MVA
IN = = = 4.441kA (C.3)
3U N , Nyhamna 3 ⋅130kV

S SC ,MVA 1
I SC , pu = ⋅ (C.4)
S N , MVA U SC , pu

I SC = I SC , pu ⋅ I N (C.5)

Table 14 shows the results obtained from the simulation in PSS/E. The variable “S [MVA]”
listed in the second column corresponds the variable SSC,MVA given in the equations above.
The variable “Isc [pu]” listed in the last column correspond to the variable ISC,pu, and is
calculated manually from Equation (C.4).

Calculated short circuit ratio


The maximum short circuit capacity can be obtained by evaluating the last column in Table
14. The maximum short circuit current (shown in red) is 1.6719 per unit. The latter short
circuit current corresponds to:

I SC = I SC , pu ⋅ I N = 1.6719 ⋅ 4.441kA = 7.425kA (C.6)

The short circuit capacity can be obtained from the following equation [18]:

S SC = 3 ⋅ U N , Nyhamna ⋅ I SC = 3 ⋅130kV ⋅ 7.425kA = 1671.9 MVA (C.7)

The short circuit ratio can be obtained from the equation given in Section 2.6.1:

S SC 1671.9MVA
SCR = = = 11.15 (C.8)
Pd 1 150MW
In Equation (C.8) it is assumed that the rated dc terminal power equals 150 MW. In the latter
value, the ratings of each of the three converters are added up.

With Section 2.6.1 as basis, a SCR of 11.15 indicates that the ac/dc connection at Nyhamna is
strong.

X
In Equation (C.8) the effect of filter and shunt capacitors is omitted. The effective short circuit
ratio can be calculated from the following equation (see Section 2.6.1):

S SC − Qc 1671.9MVA − 120MVAr
ESCR = = = 10.35 (C.9)
Pd 1 150MW

In Equation (C.9) it is assumed that the total reactive output from the filter and shunt capacitor
is 120 MVAr.

It is important to emphasize that the calculations in this section are simplified and the
objective is merely to give an indication of the strength of the ac system connected to
Nyhamna.

Synchronous machines connected at, or near a converter station, should be represented by the
subtransient reactance when calculating the SCR. The subtransient reactance is not used for
all synchronous machines in the model analyzed in Chapter 7. Those machines which are
modeled as subtransient level machines have an impedance equal to the subtransient
impedance. However, the latter is not valid for the machines modeled as classical (GENCLS)
or transient (GENTRA) level machines. To what extent this will influence the SCR
calculations, is not considered in this thesis [11].

XI
Table 14 Results from PSS/E.
TIME S [MVA] Spg Nyhamna [pu] Spg Dum [pu] Isc [pu]
-0,0200 2,5418E-06 9,8806E-01 9,8806E-01 2,5725E-09
-0,0100 2,8721E-06 9,8793E-01 9,8793E-01 2,9072E-09
0,0000 3,8850E-06 9,8887E-01 9,8887E-01 3,9287E-09
0,0000 1,5061E-06 9,8891E-01 9,8891E-01 1,5230E-09
0,0100 2,8780E-06 9,8894E-01 9,8894E-01 2,9102E-09
0,0200 2,4851E-06 9,8868E-01 9,8868E-01 2,5135E-09
0,0300 3,3087E-06 9,8887E-01 9,8887E-01 3,3459E-09
0,0400 4,9048E-06 9,8888E-01 9,8888E-01 4,9600E-09
0,0500 3,1098E-06 9,8880E-01 9,8880E-01 3,1450E-09
0,0600 1,0316E-06 9,8879E-01 9,8879E-01 1,0432E-09
0,0700 3,1460E-06 9,8879E-01 9,8879E-01 3,1817E-09
0,0800 2,5846E-06 9,8877E-01 9,8877E-01 2,6139E-09
0,0900 2,2815E-06 9,8876E-01 9,8876E-01 2,3075E-09
0,1000 2,8792E-06 9,8876E-01 9,8876E-01 2,9119E-09
0,1100 2,6288E-06 9,8875E-01 9,8875E-01 2,6587E-09
0,1200 1,1133E-06 9,8875E-01 9,8875E-01 1,1259E-09
0,1300 1,3116E-06 9,8874E-01 9,8874E-01 1,3266E-09
0,1400 6,5547E-06 9,8874E-01 9,8874E-01 6,6293E-09
0,1500 4,2432E-06 9,8874E-01 9,8874E-01 4,2915E-09
0,1600 1,5913E-06 9,8874E-01 9,8874E-01 1,6094E-09
0,1700 3,1521E-06 9,8873E-01 9,8873E-01 3,1881E-09
0,1800 2,8443E-06 9,8873E-01 9,8873E-01 2,8767E-09
0,1900 1,9164E-06 9,8873E-01 9,8873E-01 1,9383E-09
0,2000 4,2280E-06 9,8873E-01 9,8873E-01 4,2762E-09
0,2100 3,2390E-06 9,8873E-01 9,8873E-01 3,2759E-09
0,2200 2,5953E-06 9,8873E-01 9,8873E-01 2,6249E-09
0,2300 1,5486E-06 9,8873E-01 9,8873E-01 1,5662E-09
0,2400 2,0092E-06 9,8873E-01 9,8873E-01 2,0321E-09
0,2500 3,2131E-06 9,8868E-01 9,8868E-01 3,2499E-09
0,2600 1,8942E-06 9,8870E-01 9,8870E-01 1,9159E-09
0,2700 8,0599E-07 9,8872E-01 9,8872E-01 8,1518E-10
0,2800 2,4991E-06 9,8868E-01 9,8868E-01 2,5277E-09
0,2900 4,7435E-07 9,8870E-01 9,8870E-01 4,7977E-10
0,3000 2,1508E-06 9,8869E-01 9,8869E-01 2,1754E-09
0,3100 6,3644E-07 9,8871E-01 9,8871E-01 6,4371E-10
0,3200 2,0033E-06 9,8869E-01 9,8869E-01 2,0262E-09
0,3300 3,5691E-06 9,8872E-01 9,8872E-01 3,6098E-09
0,3400 2,9674E-06 9,8874E-01 9,8874E-01 3,0012E-09
0,3500 8,8913E-07 9,8869E-01 9,8869E-01 8,9930E-10
0,3600 3,7108E-06 9,8872E-01 9,8872E-01 3,7531E-09
0,3700 2,6166E-06 9,8875E-01 9,8875E-01 2,6463E-09
0,3800 4,2837E-06 9,8875E-01 9,8875E-01 4,3324E-09
0,3900 2,4302E-06 9,8870E-01 9,8870E-01 2,4579E-09
0,4000 3,3169E-06 9,8874E-01 9,8874E-01 3,3547E-09
0,4200 2,7508E-06 9,8877E-01 9,8877E-01 2,7820E-09
0,4300 3,1764E-06 9,8877E-01 9,8877E-01 3,2125E-09
0,4400 2,3647E-06 9,8878E-01 9,8878E-01 2,3915E-09
0,4500 2,6500E-06 9,8878E-01 9,8878E-01 2,6801E-09

XII
TIME S [MVA] Spg Nyhamna [pu] Spg Dum [pu] Isc [pu]
0,4500 2,6500E-06 9,8878E-01 9,8878E-01 2,6801E-09
0,4600 3,2656E-06 9,8879E-01 9,8879E-01 3,3026E-09
0,4700 4,6144E-07 9,8875E-01 9,8875E-01 4,6669E-10
0,4800 4,4839E-08 9,8879E-01 9,8879E-01 4,5347E-11
0,4900 2,4835E-06 9,8882E-01 9,8882E-01 2,5116E-09
0,5000 4,2119E-06 9,8882E-01 9,8882E-01 4,2595E-09
0,5100 2,4907E-06 9,8882E-01 9,8882E-01 2,5189E-09
0,5200 1,4089E-06 9,8878E-01 9,8878E-01 1,4249E-09
0,5300 1,2537E-07 9,8882E-01 9,8882E-01 1,2679E-10
0,5400 4,2464E-06 9,8885E-01 9,8885E-01 4,2942E-09
0,5500 3,1709E-06 9,8885E-01 9,8885E-01 3,2067E-09
0,5600 3,7943E-06 9,8881E-01 9,8881E-01 3,8372E-09
0,5700 4,0513E-06 9,8884E-01 9,8884E-01 4,0970E-09
0,5800 2,9702E-06 9,8887E-01 9,8887E-01 3,0036E-09
0,5900 4,2946E-06 9,8883E-01 9,8883E-01 4,3431E-09
0,6000 2,6403E-06 9,8886E-01 9,8886E-01 2,6701E-09
0,6100 4,4950E-06 9,8888E-01 9,8888E-01 4,5455E-09
0,6200 1,0367E-06 9,8890E-01 9,8890E-01 1,0483E-09
0,6300 1,2524E-06 9,8885E-01 9,8885E-01 1,2666E-09
0,6400 8,0327E-07 9,8888E-01 9,8888E-01 8,1230E-10
0,6500 2,4852E-06 9,8890E-01 9,8890E-01 2,5131E-09
0,6600 2,3397E-06 9,8891E-01 9,8891E-01 2,3659E-09
0,6700 2,1569E-07 9,8891E-01 9,8891E-01 2,1811E-10
0,6800 2,9318E-07 9,8892E-01 9,8892E-01 2,9647E-10
0,6900 8,2122E-07 9,8892E-01 9,8892E-01 8,3042E-10
0,7000 7,3051E-08 9,8892E-01 9,8892E-01 7,3869E-11
0,7100 5,5097E-06 9,8892E-01 9,8892E-01 5,5715E-09
0,7200 3,0772E-06 9,8892E-01 9,8892E-01 3,1117E-09
0,7300 4,5462E-06 9,8892E-01 9,8892E-01 4,5971E-09
0,7400 3,0447E-06 9,8892E-01 9,8892E-01 3,0788E-09
0,7400 4,2912E-06 9,8889E-01 9,8889E-01 4,3394E-09
0,7500 2,9948E-06 9,8889E-01 9,8889E-01 3,0284E-09
0,7600 3,8449E-06 9,8890E-01 9,8890E-01 3,8880E-09
0,7700 3,0102E-06 9,8892E-01 9,8892E-01 3,0439E-09
0,7800 6,8115E-07 9,8891E-01 9,8891E-01 6,8879E-10
0,7900 1,6486E-06 9,8891E-01 9,8891E-01 1,6671E-09
0,8000 3,9679E-06 9,8891E-01 9,8891E-01 4,0124E-09
0,8100 6,3422E-07 9,8890E-01 9,8890E-01 6,4134E-10
0,8200 1,0777E-06 9,8890E-01 9,8890E-01 1,0898E-09
0,8300 1,5232E-06 9,8890E-01 9,8890E-01 1,5403E-09
0,8400 3,3459E-06 9,8889E-01 9,8889E-01 3,3835E-09
0,8500 4,1256E-06 9,8889E-01 9,8889E-01 4,1719E-09
0,8600 2,5079E-06 9,8888E-01 9,8888E-01 2,5361E-09
0,8700 2,5295E-06 9,8888E-01 9,8888E-01 2,5580E-09
0,8800 2,7819E-06 9,8887E-01 9,8887E-01 2,8132E-09
0,8900 2,7848E-06 9,8886E-01 9,8886E-01 2,8162E-09
0,9000 1,4393E-06 9,8886E-01 9,8886E-01 1,4555E-09
0,9100 1,8624E-06 9,8885E-01 9,8885E-01 1,8834E-09

XIII
TIME S [MVA] Spg Nyhamna [pu] Spg Dum [pu] Isc [pu]
0,9200 1,7019E-06 9,8884E-01 9,8884E-01 1,7211E-09
0,9300 1,7906E-06 9,8883E-01 9,8883E-01 1,8108E-09
0,9400 3,5091E-06 9,8882E-01 9,8882E-01 3,5487E-09
0,9500 2,5772E-06 9,8882E-01 9,8882E-01 2,6063E-09
0,9600 6,8377E-07 9,8881E-01 9,8881E-01 6,9151E-10
0,9700 2,6639E-06 9,8880E-01 9,8880E-01 2,6940E-09
0,9800 2,4917E-06 9,8879E-01 9,8879E-01 2,5200E-09
0,9900 3,1644E-06 9,8878E-01 9,8878E-01 3,2003E-09
1,0000 1,3293E-06 9,8877E-01 9,8877E-01 1,3444E-09
1,0000 1,2707E-05 7,9708E-09 7,9708E-09 1,5942E+00
1,0100 1,2570E-05 7,9276E-09 7,9276E-09 1,5855E+00
1,0200 1,2527E-05 7,9142E-09 7,9142E-09 1,5828E+00
1,0300 1,2525E-05 7,9135E-09 7,9135E-09 1,5827E+00
1,0400 1,2457E-05 7,8919E-09 7,8919E-09 1,5784E+00
1,0500 1,2406E-05 7,8760E-09 7,8760E-09 1,5752E+00
1,0600 1,2373E-05 7,8655E-09 7,8655E-09 1,5731E+00
1,0700 1,2357E-05 7,8604E-09 7,8604E-09 1,5721E+00
1,0800 1,2352E-05 7,8588E-09 7,8588E-09 1,5718E+00
1,0900 1,2354E-05 7,8594E-09 7,8594E-09 1,5719E+00
1,1000 1,2363E-05 7,8622E-09 7,8622E-09 1,5724E+00
1,1100 1,2378E-05 7,8671E-09 7,8671E-09 1,5734E+00
1,1200 1,2399E-05 7,8735E-09 7,8735E-09 1,5747E+00
1,1300 1,2423E-05 7,8814E-09 7,8814E-09 1,5763E+00
1,1400 1,2452E-05 7,8904E-09 7,8904E-09 1,5781E+00
1,1500 1,2483E-05 7,9003E-09 7,9003E-09 1,5801E+00
1,1600 1,2517E-05 7,9111E-09 7,9111E-09 1,5822E+00
1,1700 1,2553E-05 7,9224E-09 7,9224E-09 1,5845E+00
1,1800 1,2591E-05 7,9343E-09 7,9343E-09 1,5869E+00
1,1900 1,2630E-05 7,9466E-09 7,9466E-09 1,5893E+00
1,2000 1,2670E-05 7,9591E-09 7,9591E-09 1,5918E+00
1,2100 1,2710E-05 7,9719E-09 7,9719E-09 1,5944E+00
1,2200 1,2752E-05 7,9849E-09 7,9849E-09 1,5970E+00
1,2300 1,2793E-05 7,9979E-09 7,9979E-09 1,5996E+00
1,2400 1,2835E-05 8,0110E-09 8,0110E-09 1,6022E+00
1,2500 1,2877E-05 8,0241E-09 8,0241E-09 1,6048E+00
1,2600 1,2919E-05 8,0372E-09 8,0372E-09 1,6074E+00
1,2700 1,2961E-05 8,0501E-09 8,0501E-09 1,6100E+00
1,2800 1,3002E-05 8,0630E-09 8,0630E-09 1,6126E+00
1,2900 1,3044E-05 8,0757E-09 8,0757E-09 1,6151E+00
1,3000 1,3084E-05 8,0883E-09 8,0883E-09 1,6177E+00
1,3100 1,3124E-05 8,1006E-09 8,1006E-09 1,6201E+00
1,3200 1,3163E-05 8,1127E-09 8,1127E-09 1,6225E+00
1,3300 1,3202E-05 8,1246E-09 8,1246E-09 1,6249E+00
1,3400 1,3240E-05 8,1362E-09 8,1362E-09 1,6272E+00
1,3500 1,3276E-05 8,1475E-09 8,1475E-09 1,6295E+00
1,3600 1,3312E-05 8,1585E-09 8,1585E-09 1,6317E+00
1,3700 1,3347E-05 8,1692E-09 8,1692E-09 1,6338E+00
1,3800 1,3381E-05 8,1795E-09 8,1795E-09 1,6359E+00

XIV
TIME S [MVA] Spg Nyhamna [pu] Spg Dum [pu] Isc [pu]
1,3900 1,3414E-05 8,1895E-09 8,1895E-09 1,6379E+00
1,4000 1,3439E-05 8,1971E-09 8,1971E-09 1,6394E+00
1,4100 1,3465E-05 8,2050E-09 8,2050E-09 1,6410E+00
1,4200 1,3493E-05 8,2136E-09 8,2136E-09 1,6427E+00
1,4300 1,3519E-05 8,2215E-09 8,2215E-09 1,6443E+00
1,4400 1,3544E-05 8,2292E-09 8,2292E-09 1,6458E+00
1,4500 1,3569E-05 8,2368E-09 8,2368E-09 1,6474E+00
1,4600 1,3593E-05 8,2441E-09 8,2441E-09 1,6488E+00
1,4700 1,3617E-05 8,2512E-09 8,2512E-09 1,6502E+00
1,4800 1,3639E-05 8,2581E-09 8,2581E-09 1,6516E+00
1,4900 1,3662E-05 8,2648E-09 8,2648E-09 1,6530E+00
1,5000 1,3683E-05 8,2713E-09 8,2713E-09 1,6543E+00
1,5100 1,3704E-05 8,2776E-09 8,2776E-09 1,6555E+00
1,5200 1,3724E-05 8,2837E-09 8,2837E-09 1,6567E+00
1,5300 1,3744E-05 8,2897E-09 8,2897E-09 1,6579E+00
1,5400 1,3763E-05 8,2956E-09 8,2956E-09 1,6591E+00
1,5500 1,3782E-05 8,3012E-09 8,3012E-09 1,6602E+00
1,5600 1,3800E-05 8,3065E-09 8,3065E-09 1,6613E+00
1,5700 1,3817E-05 8,3118E-09 8,3118E-09 1,6623E+00
1,5800 1,3834E-05 8,3167E-09 8,3167E-09 1,6633E+00
1,5900 1,3850E-05 8,3215E-09 8,3215E-09 1,6643E+00
1,6000 1,3863E-05 8,3257E-09 8,3257E-09 1,6651E+00
1,6100 1,3876E-05 8,3294E-09 8,3294E-09 1,6659E+00
1,6200 1,3887E-05 8,3328E-09 8,3328E-09 1,6666E+00
1,6300 1,3898E-05 8,3360E-09 8,3360E-09 1,6672E+00
1,6400 1,3908E-05 8,3390E-09 8,3390E-09 1,6678E+00
1,6500 1,3917E-05 8,3417E-09 8,3417E-09 1,6683E+00
1,6600 1,3925E-05 8,3443E-09 8,3443E-09 1,6688E+00
1,6700 1,3933E-05 8,3466E-09 8,3466E-09 1,6693E+00
1,6800 1,3940E-05 8,3488E-09 8,3488E-09 1,6698E+00
1,6900 1,3947E-05 8,3508E-09 8,3508E-09 1,6701E+00
1,7000 1,3953E-05 8,3526E-09 8,3526E-09 1,6705E+00
1,7100 1,3959E-05 8,3542E-09 8,3542E-09 1,6708E+00
1,7200 1,3963E-05 8,3556E-09 8,3556E-09 1,6711E+00
1,7300 1,3967E-05 8,3568E-09 8,3568E-09 1,6714E+00
1,7400 1,3971E-05 8,3578E-09 8,3578E-09 1,6716E+00
1,7500 1,3973E-05 8,3585E-09 8,3585E-09 1,6717E+00
1,7600 1,3975E-05 8,3591E-09 8,3591E-09 1,6718E+00
1,7700 1,3976E-05 8,3594E-09 8,3594E-09 1,6719E+00
1,7800 1,3976E-05 8,3595E-09 8,3595E-09 1,6719E+00
1,7900 1,3976E-05 8,3594E-09 8,3594E-09 1,6719E+00
1,8000 1,3975E-05 8,3591E-09 8,3591E-09 1,6718E+00
1,8100 1,3973E-05 8,3585E-09 8,3585E-09 1,6717E+00
1,8200 1,3970E-05 8,3578E-09 8,3578E-09 1,6716E+00
1,8300 1,3967E-05 8,3568E-09 8,3568E-09 1,6714E+00
1,8400 1,3963E-05 8,3556E-09 8,3556E-09 1,6711E+00
1,8500 1,3959E-05 8,3542E-09 8,3542E-09 1,6708E+00
1,8600 1,3953E-05 8,3526E-09 8,3526E-09 1,6705E+00

XV
TIME S [MVA] Spg Nyhamna [pu] Spg Dum [pu] Isc [pu]
1,8700 1,3947E-05 8,3507E-09 8,3507E-09 1,6701E+00
1,8800 1,3940E-05 8,3486E-09 8,3486E-09 1,6697E+00
1,8900 1,3932E-05 8,3463E-09 8,3463E-09 1,6693E+00
1,9000 1,3924E-05 8,3438E-09 8,3438E-09 1,6688E+00
1,9100 1,3915E-05 8,3411E-09 8,3411E-09 1,6682E+00
1,9200 1,3905E-05 8,3383E-09 8,3383E-09 1,6677E+00
1,9300 1,3896E-05 8,3353E-09 8,3353E-09 1,6671E+00
1,9400 1,3885E-05 8,3322E-09 8,3322E-09 1,6664E+00
1,9500 1,3875E-05 8,3291E-09 8,3291E-09 1,6658E+00
1,9600 1,3864E-05 8,3258E-09 8,3258E-09 1,6652E+00
1,9700 1,3853E-05 8,3226E-09 8,3226E-09 1,6645E+00
1,9800 1,3842E-05 8,3193E-09 8,3193E-09 1,6639E+00
1,9900 1,3832E-05 8,3161E-09 8,3161E-09 1,6632E+00
2,0000 1,3821E-05 8,3130E-09 8,3130E-09 1,6626E+00