Shreeyash College of Engineering and Technology (Polytechnic), Chh. Sambhajinagar Micro-Project Report
Shreeyash College of Engineering and Technology (Polytechnic), Chh. Sambhajinagar Micro-Project Report
Shreeyash College of Engineering and Technology (Polytechnic), Chh. Sambhajinagar Micro-Project Report
MICRO-PROJECT REPORT
Seal of Institute
ACKNOWLEDGEMENT
We wish to express our profound gratitude to our guide PROF: V.B.
BHOSALE who guided us endlessly in framing and completion of Micro-Project.
She guided us on all the main points in that Micro-Project. We are indebted to
her constant encouragement, cooperation and help. It was her enthusiastic
support that helped us in overcoming of various obstacles in the Micro-Project.
We are also thankful to our Principal S. S. KHANDAGALE & HOD
A. C. NAIK, Faculty Members and classmates for extending their support and
motivation in the completion of this Micro-Project.
Title of Micro-Project
STUDENT MANAGEMENT SYSTEM
3.0 Proposed Methodology (Procedure in brief that will be followed to do the micro-
project) in about 100 to 200 words).
1. Gathering requirements: This involves collecting and verifying the requirements of the system.
2. Design: This involves designing the system based on the requirements gathered.
3. Development and implementation: This involves developing the system based on the design and
implementing it.
4. Testing: This involves testing the system to ensure that it meets the requirements and is free of
defects.
5. Maintenance: This involves maintaining the system and fixing any defects that are found.
Annexure-1
4.0 Action Plan (Sequence and time required for major activity. The following is for Reference, The
Activities can be Added / reduced / Modified )
Name of
Sr. Planned Planned Responsible
Details of activity
No. Week Start Finish Team Members
date date
1 1 &2 Discussion & Finalization of 15/01/2024 17/01/2024 All Members
Topic
2 3 Preparation of the Abstract 20/01/2024 22/01/2024 Krushna Kale
3 4 Literature Review 25/01/2024 27/01/2024 Krushna Kale
4 5 Submission of Microproject 29/01/2024 31/01/2024 All Members
Proposal ( Annexure-I)
5 6 Collection of information about 01/02/2024 03/02/2024 Sumit Joshi
Topic
6 7 Collection of relevant content / 05/02/2024 07/02/2024 Vishal Kolte
materials for the execution of
Microproject.
7 8 Discussion and submission of 10/02/2024 12/02/2024 All Members
outline of the Microproject.
8 9 Analysis / execution of 20/02/2024 22/02/2024 All Members
Collected data / information and
preparation of Prototypes /
drawings / photos / charts /
graphs / tables / circuits / Models
/ programs etc.
9 10 Completion of Contents of 01/03/2024 03/03/2024 Sumit Joshi
Project Report
10 11 Completion of Weekly progress 10/03/2024 12/03/2024 Vishal Kolte
Report
11 12 Completion of Project Report ( 11/04/2024 11/04/2024 All Members
Annexure-II)
12 13 Viva voce / Delivery of
Presentation
5.0 Resources Required (major resources such as raw material, some machining facility,
software etc.)
Micro-Project Report
Format for Micro-Project Report (Minimum 4 pages)
Title of Micro-Project:-
3.0 Course Outcomes Achieved (Add to the earlier list if more Cos are addressed)
a) Select suitable Software process model for software development.
b) Prepare software requirement specifications.
c) Use software modeling to create data designs.
d) Estimate size and cost of software product.
e) Apply project management and quality assurance principles in software development.
1.1 Literature Review:- ( you can include all the resources which you have used to gather the information
for the Micro-project)
Sample:-
5.0 Actual Methodology Followed (Write step wise work done, data collected and its analysis
(if any).The contribution of individual member may also be noted.)
1) Gathering requirements: This involves collecting and verifying the requirements of the system.
2) Design: This involves designing the system based on the requirements gathered.
3) Development and implementation: This involves developing the system based on the design and
implementing it.
4) Testing: This involves testing the system to ensure that it meets the requirements and is free of defects.
5) Maintenance: This involves maintaining the system and fixing any defects that are found.
6.0 Actual Resources Used (Mention the actual resources used).
sr.
Name of Resource/material Specifications Qty Remarks
No.
1 Bridge 2
PC Windows 11 4
2
Smart Phones Android 13 2
3
1) IDENTIFYING : identifying the problem and course of problem in the area related and prepare
project proposals before starting the project.
2) SERIVE : Derive different possible solutions creatively.
3) DATA COMMUNICATION : Collect relevant data from different sources (books/the internet/the
market/suppliers/experts and other through survey/interviews).
4) DESIGNING : Designing micro project with minimum required resources (low cost).
5) DEVELOPING : Develop the prototype/model/ of the desired equipment/ machine part etc.
6) TEAMWORK : Learn to work in a team and boost individual confidence.
7) TIME MANAGEMENT : Timely completion of micro project as scheduled.
8) DATA ANALYSIS : Interpretation of data, drawing and analysis of laboratory calculations etc.
9) PROBLEM-SOLVING : Develop good problem-solving skills.
10) SAFETY : Incorporate safety features in products.
11) TECHNICAL WRITING : Prepare a report of the proposed plan and final report.
12) PRESENTATION AND COMMUNICATION SKILLS : Giving working model presentation of
the micro project.
13) CONFIDENCE : Confidently, answer the questions asked about the project.
14) ACKNOWLEDGEMTNT : Acknowledge the help rendered by others in the success of the project.
(A) (B)
Process and Product Individual Presentation/ Total Marks
Assessment (6 marks) Viva (4 marks) 10
Dated Signature:-__________________